HomeMy WebLinkAbout20230358 182 Excelsior Area Variance Narrative
Project Narrative
for
182 Excelsior Avenue
182 Excelsior Avenue
City of Saratoga Springs, Saratoga Co., New York
May 3, 2023
MJ#: 1583.01
Prepared For:
Green Springs Capital Group, LLC
PO Box 3207
Saratoga Springs, NY 12866
Prepared By:
M.J Engineering and
Land Surveying, P.C.
1533 Crescent Road
Clifton Park, NY 12065
Phone: 518.371.0799
Fax: 518.371.0822
mjelspc@mjels.com
TABLE OF CONTENTS
1.0 Applicant and Owner Information ............................................................................................................... 1
2.0 General Project Overview ............................................................................................................................. 1
3.0 Infrastructure ................................................................................................................................................... 2
3.1 Roadways and Site Access ....................................................................................................................... 2
3.2 Traffic - ITE Generation ............................................................................................................................... 2
3.3 Potable Water ............................................................................................................................................ 3
3.4 Sewage Disposal ........................................................................................................................................ 3
3.5 Stormwater Management ......................................................................................................................... 3
3.6 Wetlands ..................................................................................................................................................... 3
3.7 Archaeological/Cultural Resources ......................................................................................................... 4
3.8 Soils............................................................................................................................................................... 4
4.0 Area Variance ................................................................................................................................................ 4
5.0 State Environmental Quality Review Act ..................................................................................................... 4
6.0 Permit / Approvals .......................................................................................................................................... 5
APPENDICIES
Appendix A: Existing Conditions
Appendix B: Proposed Conditions
Appendix C: Site Photographs
Appendix D: NYSDEC Freshwater Wetlands
Appendix E: USACE Wetlands
Appendix F: SHPO
1533 Crescent Road
Clifton Park, NY 12065
Phone: 518.371.0799
Fax: 518.371.0822
mjelspc@mjels.com
mjels.com
New York, NY • Long Island, NY • Sewell, NJ • Melbourne, FL
1.0 APPLICANT AND OWNER INFORMATION
Project 182 Excelsior Avenue Apartments
182 Excelsior Avenue
Saratoga Springs, NY
Tax Map ID: 166.-1-14
Applicant Green Springs Capital Group, LLC
c/o Brian Green
PO Box 3207
Saratoga Springs, NY 12866
Owner Louisiana Management Co., LLC
429 Maple Avenue
Saratoga Springs, NY 12866
2.0 GENERAL PROJECT OVERVIEW
This project involves the subdivision and redevelopment of an existing parcel, deeding a total of 2.49 acres of land,
that contains an existing main house apartment with 6 units and a carriage house with 4 units. The development
would include relocating the existing main and carriage house onto its own parcel and redeveloping them into a
total of 8 condominiums and on a separate parcel the construction of four (4) 3,623 s.f. three-story apartments with
9 units in each, resulting in 36 total units.
The parcel is located along Excelsior Avenue with two existing access entrances. It is proposed that access to both
the relocated structures and the apartments will come via Excelsior Springs.
The parcel is currently serviced by public water and public sewer from the City of Saratoga Water System and
Saratoga County Sewer District. All improvements proposed shall be owned and operated by the landowner with
nothing being conveyed to the City of Saratoga Springs.
The parcel is located within the UR-4 Urban Residential zoning district. Multi-Family residential developments are
permitted as of right within the UR-4 district. As shown on the zoning map below, the project site is adjacent to the
182 Excelsior Avenue Apartments
May 3, 2023
Page 2 of 5
Urban Neighborhood District (UN), Neighborhood Center District (NC), Institutional Education District (INST-ED) and
Urban Residential 1 District (UR-1) Districts.
\
3.0 INFRASTRUCTURE
3.1 Roadways and Site Access
The existing parcel is provided access to a public right-of-way (Excelsior Avenue) via existing access points that
directly enter Excelsior Avenue.
The proposed site development will include two entrances on Excelsior Springs to eliminate the concern of the
Planning Board of traffic entering Excelsior Avenue at Veteran’s Way. The relocated structures will be located
on a proposed lot along Excelsior Avenue with the entrance approximately 100 feet south of the intersection
with Excelsior Avenue. The proposed apartment lot entrance will be approximately 200 feet south of the
intersection with Excelsior Avenue. We are proposing over the minimum parking spaces per unit (Code 1.5
spaces per unit) based on past experiences of similar uses. The parking areas propose to contain approximately
a total of 66 parking stalls (5 ADA accessible parking stalls) for both the condominiums and tenants of the
apartment units.
3.2 Traffic – ITE Generation
The trip generation analysis was completed using the Institute of Transportation Engineers (ITE) Trip Generation
Manual, 11th Edition to determine the peak hour vehicle trips associated with the project. Land Use Code (LUC)
220, Multifamily Housing was utilized for existing and proposed conditions. Below is a summary of the peak hour
vehicle trips generated from the project.
182 Excelsior Avenue Apartments
May 3, 2023
Page 3 of 5
Trip Generation - 182 Excelsior Avenue
AM Peak PM Peak
Entering Exiting Total Entering Exiting Total
Existing Apartment Trips (10-units) 1 3 4 3 2 5
Proposed Condo/Apartment Trips
(44-units) 4 13 17 15 7 22
Difference (34-units) 3 10 13 12 5 17
· The AM and PM peak hour vehicle trips for the project are 17 and 22 respectively.
· When accounting for the existing apartments on site, the difference in AM and PM peak hour vehicle
trips would be 13 and 17 respectively above the current use.
3.3 Potable Water
The existing parcel is within the City of Saratoga Springs Water District and an individual water service
connection extending from a Town water main currently exists. As part of the project, a new water service will
be necessary based upon project demands. Based upon the proposed use, the average day water demand
is expected to be 9,680 gallons per day. NYSDEC Design Standards for Intermediate Sized Water Treatment
Systems dated 3/5/2014 was used to determine anticipated flow rate, (44 units X 2 bedrooms per apartment X
110 gpd/bedroom).
3.4 Sewage Disposal
The existing parcel is within Saratoga County Sewer District No.1 and an individual sewer service connection
extending from a county sewer main within the public right of way currently exists. As part of the project, the
existing sewer lateral can possibly be reused for the relocated structures. A second low pressure lateral would
be installed for the apartment buildings. It is anticipated that two buildings would each connect to an E-One
quad station which would discharge to the County system. Based upon the proposed use, the average day
sewage generation is expected to be 9,680 gallons per day.
3.5 Stormwater Management
The project will disturb more than 1 acre of land. As such, it will be subject to the NYSDEC General Permit GP-0-
20-001. The project design will follow the requirements of Chapter 9 of the NYSDEC Design Manual and is defined
as a redevelopment project with an increase in impervious area. A project specific Stormwater Pollution
Prevention Plan (SWPPP) will be prepared as part of subsequent project submissions.
3.6 Wetlands
A wetland delineation was performed on site on September 7, 2022. One small area, 724 sf was delineated on
the northwest corner of the parcel. The delineation was submitted to NYSDEC for their review as the parcel is
located within the NYSDEC 500’ check zone. See correspondence dated September 16, 2022, from NYSDEC
validating the delineated wetlands as well as indicated they will not take jurisdiction over the wetlands on the
site. The Army Corps of Engineers has also reviewed the wetlands and provided a jurisdictional determination.
The wetland on site “Wetland A” was determined to be non-jurisdictional and only the off-site Spring Run stream
was considered part of a tributary system.
182 Excelsior Avenue Apartments
May 3, 2023
Page 4 of 5
3.7 Archaeological/Cultural Resources
M.J. reviewed New York State’s Office of Parks, Recreation, and Historic Preservation’s online Cultural Resource
Information System (CRIS) for this site and verified that the site was located within an archeological sensitive
Area. Phase 1A/B Archaeological Survey report was prepared by Curtin Archaeological Consulting, Inc. in
January 2023. We received correspondence from the NYS Office of Parks, recreation and Historic Preservation
concurring that the materials recovered do not represent an intact archaeological site and no additional
archaeological work is necessary resulting in the project having no effect on archaeological resources.
It is proposed to preserve the existing main home and carriage barn by relocating them on the property closer
to Excelsior Avenue as they once were back in the earlier 1900’s prior to Excelsior Avenue being relocated.
3.8 Soils
Review of the National Resources Conservation Service (NRCS) Soil Survey Data indicates the project area is
predominately comprised of Windsor loamy sand, with the following characteristics:
WnB—Windsor loamy sand
· Slope: 3 to 8 percent
· Depth to restrictive feature: More than 80 inches
· Drainage class: Excessively drained
· Runoff class: Low
· Depth to water table: More than 80 inches
· Frequency of flooding: None
· Frequency of ponding: None
· Hydrologic Soil Group: A
A geotechnical Engineering Report was provided by Daniel G. Loucks, PE on August 22, 2022. His testing
consisted of six (6) soil borings throughout the upper portion of the parcel. All of the borings encountered fill
materials from 0-8’ below the existing surface. The report states that the fill encountered is “…generally sand
with a trace to some silt and gravel. The borings were stopped at 17’; none of which encountered refusal or
bedrock. The groundwater table encountered at these borings was located below a depth of 4 feet.
4.0 AREA VARIANCE
Variance
Lot 1 – Proposed four 9-unit apartment buildings (36 units total) on an 80,239 sf parcel.
Therefore, based upon the above information the project proposes the following variance for this project.
1. Article 3.3, Table 3-A: Residential Districts Dimensional Standards
a. Minimum Lot Area, Residential of 3,000sf/dwelling unit to 2,229sf/dwelling unit
5.0 STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA)
Based upon the scope of the proposed project, it is believed to be an Unlisted SEQRA action. It is believed that over
the course of the project’s review, adequate information will be provided to potentially support the issuance of a
negative declaration by the Lead Agency under SEQRA.
182 Excelsior Avenue Apartments
May 3, 2023
Page 5 of 5
6.0 PERMITS / APPROVALS
Based upon the conceptual plan developed, it is believed that the regulatory approvals that would be necessary
are as follows:
· City of Saratoga Springs Zoning board of Appeals: Aea Variance.
· City of Saratoga Springs Planning Board: Site Plan approval.
· Saratoga County Planning Board: Referral
· City of Saratoga Springs Waters Department: Water Permit
· Saratoga County Sewer District No.1: Sewer Permit.
· NYSDEC Stormwater Permit Coverage
Other agencies having jurisdiction may be identified over the course of the project’s review.
Appendix A
Existing Conditions
VETERANS WAY
EXCEL
S
I
O
R
A
V
E
.LOUGHBERRY ROADSOUTHEXCELSIOR SPRING AVE.SPRING R
U
N
T
R
A
I
L
LOCATION MAP
File Name: G:\MJ1583.01 - 182 Excelsior\Cad\MJ1583.01__XSRVY.dwg (Layout: Layout1 )Date: Tue, Nov 29, 2022 - 10:09 AM (Name: bmccabe)THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, (I.E.)
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LAND SURVEYOR FOR A LAND SURVEYOR, IS A VIOLATION OF THE
NEW YORK STATE EDUCATION LAW AND/OR REGULATIONS AND IS
A CLASS "A" MISDEMEANOR.
SEAL
DATE:
MJ PROJ. No.:
CONTRACT No.:
SCALE:
DATENo.DESCRIPTION
SUBMITTAL / REVISIONS
PROJ. MANAGER:REVIEWED BY:
CHIEF DESIGNER:
BY DATE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SEAL
1533 Crescent Road - Clifton Park, NY 12065
Engineering and
Land Surveying, P.C.
1 OF 1
1" = 30'
PREPARED FOR
GREEN SPRINGS CAPITAL GROUP, LLC
182 EXCELSIOR AVENUE
1
.
.
.
.
.
.
JEQ
BPM
JGM
BOUNDARY AND TOPOGRAPHIC SURVEY
CITY OF SARATOGA SPRINGS
SARATOGA COUNTY NEW YORK
1583.01
NOVEMBER 23, 2022
Appendix B
Proposed Development
VETERANSWAYEXCELSIOR AVE.LOUGHBERRY ROADSOUTHEXCELSIOR SPRING AVE.SPRING RUN TRAIL●●●●●●●●●THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONEUNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, (I.E.)ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER ORLANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS AVIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/ORREGULATIONS AND IS A CLASS "A" MISDEMEANOR.File Name: F:\MJ1583\MJ1583.01 182 Excelsior Avenue\MJ1583.01_XENG_6_1.dwg (Layout: CP-6 )Date: Fri, May 05, 2023 - 9:11 AM (Name: aborza)DATE:MJ PROJ. No.:CONTRACT No.:SCALE:DATENo.DESCRIPTIONSUBMITTAL / REVISIONSPROJ. MANAGER:REVIEWED BY:CHIEF DESIGNER:BYDATEDESIGNED BY:DRAWN BY:CHECKED BY:1533 Crescent Road - Clifton Park, NY 12065Engineering andLand Surveying, P.C.CP-6AS SHOWNWLWLABABWLGREEN SPRINGS CAPITAL GROUP LLC182 EXCELSIOR AVENUESARATOGA SPRINGSNEW YORK-MJ1583.01OCTOBER 2022CONCEPT PLANZONING MAP LEGEND:010'20'20'ZONING MAPPROJECTSITE
Appendix C
Architectural Renderings
Appendix D
Site Photographs
VETERANS WAY
EXCEL
S
I
O
R
A
V
E
.LOUGHBERRY ROADSOUTHEXCELSIOR SPRING AVE.SPRING R
U
N
T
R
A
I
L
LOCATION MAP
File Name: G:\MJ1583.01 - 182 Excelsior\Cad\MJ1583.01__XSRVY.dwg (Layout: Layout1 )Date: Tue, Nov 29, 2022 - 10:09 AM (Name: bmccabe)THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, (I.E.)
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LAND SURVEYOR FOR A LAND SURVEYOR, IS A VIOLATION OF THE
NEW YORK STATE EDUCATION LAW AND/OR REGULATIONS AND IS
A CLASS "A" MISDEMEANOR.
SEAL
DATE:
MJ PROJ. No.:
CONTRACT No.:
SCALE:
DATENo.DESCRIPTION
SUBMITTAL / REVISIONS
PROJ. MANAGER:REVIEWED BY:
CHIEF DESIGNER:
BY DATE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SEAL
1533 Crescent Road - Clifton Park, NY 12065
Engineering and
Land Surveying, P.C.
1 OF 1
1" = 30'
PREPARED FOR
GREEN SPRINGS CAPITAL GROUP, LLC
182 EXCELSIOR AVENUE
1
.
.
.
.
.
.
JEQ
BPM
JGM
BOUNDARY AND TOPOGRAPHIC SURVEY
CITY OF SARATOGA SPRINGS
SARATOGA COUNTY NEW YORK
1583.01
NOVEMBER 23, 2022
Photo 1 – Looking south from westerly driveway at main house
Photo 2 – Looking southwest towards Excelsior Springs
Photo 3 – Looking southeast from behind the carriage house
Photo 4 – Looking west from the back of the carriage barn
Appendix E
NYSDEC Freshwater Wetlands
Appendix F
Army Corps of Engineer Wetlands
Appendix G
SHPO
New York State Office of Parks, Recreation and Historic Preservation
Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189
(518) 237-8643 • https://parks.ny.gov/shpo
KATHY HOCHUL ERIK KULLESEID
Governor Commissioner
February 22, 2023
Walter Lippmann
MJ Engineering & Land Surveying, PC
1533 Crescent Road
Clifton Park, NY 12065
Re: DEC
182 Excelsior Avenue Apartment Complex Development (formerly 300 Excelsior Ave)
182 Excelsior Ave, Saratoga Springs, NY 12866
22PR08142
Dear Walter Lippmann:
Thank you for requesting the comments of the Division for Historic Preservation of the Office of
Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the submitted
materials in accordance with the New York State Historic Preservation Act of 1980 (section
14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are
those of the Division for Historic Preservation and relate only to Historic/Cultural resources.
The Archaeology Unit has reviewed the Phase I Archaeological Survey report prepared for this
project (23SR00104; January 2023). Based on the report findings, it is OPRHP’s opinion that
the materials recovered from the project area do not represent an intact archaeological site. We
concur with the report recommendation that no additional archaeological work is necessary.
Please note that these comments pertain only to archaeological resources. Please continue to
consult with Weston Davey in the Technical Preservation Services Unit at
Weston.Davey@parks.ny.gov. If you have any questions concerning archaeology, I can be
reached at Jessica.Schreyer@parks.ny.gov
Sincerely,
Jessica Schreyer
Historic Preservation Program Analyst - Archaeologist