HomeMy WebLinkAbout20230267 78 Church Site Plan Cover Letter/NarrativeTHE LAW OFFICES OF
M. ELIZABETH CORENGIS(1.V.(.
April 19, 2023
Mark Torpey, Chair
Planning Board of the City of Saratoga Springs
474 Broadway, City Hall
Saratoga Springs, NY 12866
Libby Coreno, Esq.
libby@corenolaw.com
Re: 78 Church Street — Site Plan Application per UDO Sections 4.4 and 13.5
Dear Chairman Torpey:
Enclosed please find the applicant's submission pursuant to Unified Development Ordinance
(UDO) Sections 4.4 and 13.5 for review of a proposed mixed -use building at 78 Church Street in
the City of Saratoga Springs. The application submission contains the following for the Board's
review and consideration:
1. Application for Site Plan Review;
2. A Full Environmental Assessment Form pursuant to SEQRA;
3. Proposed site plan for project site from The LA Group;
4. Full survey of two lots which constitute the project site from Survey Associates, LLC;
5. Partial mass and scale conceptual modeling from Olsen Associates, Architects, LLC; and
6. A check for filing the fee in the amount of $15,650. ($250/unit + $400)
The application is for a proposed sixty-one (61) foot building which requires an eleven (11)
foot height bonus over the 50 feet maximum height set forth in Section 4.4(A). Over the course
of the last several months, the applicant has been in communication with the City staff regarding
the land use review process for a project seeking a height bonus in the NC Zoning District
pursuant to Section 4.4 of the UDO. As a result, it is the applicant's understanding that the
process will proceed in the following manner:
1. Site Plan Application: The applicant has commenced the site plan review process by
filing a proposed site plan application which is subject to the final building height as
determined pursuant to the process outlined in Section 4.4 of the UDO. As a result, the
site plan design shall be amended following the final height determination in accordance
with the Board's decision and then proceed under standard review of Section 13.5 of the
UDO. The applicant's site plan application and Full EAF in order to commence the
SEQRA review process based upon the information possessed to date.
2. Voluntary Height Bonus Consideration: Upon the filing of site plan application, the
applicant seeks to follow the process under the new Section 4.4(B)(1) which provides for
"up to 15 feet of additional building height may be granted through a voluntary bonus
system." For consideration of a bonus, the applicant understands its application will be
given to the Design Review Board (DRB) pursuant to Section 4.4(B)(2)(a) which "will
Law Office of A Elizabeth Coreno, Esq. P.C.
63 Putnam Street, Suite 202
Saratoga Springs, New York 12866
(518) 682-6901(office)
(518) 682-6902 (fax)
Torpey, Mark
April 19, 2023
Page 2 of 3
determine the amount of height, up to the maximum of 15 feet, that the development is
eligible for. As part of the request for additional height, the applicant submit mass and
scale drawings of the proposed development." In this case, the applicant has included
mass and scale drawings of both the proposed development and neighborhood context for
DRB's review of the proposed building at 61 feet and the maximum allowed (but not
requested) of 65 feet.
Determination of Height Bonus Points: Once height bonus eligibility is set by the DRB,
the application returns to the Planning Board "to make a determination that the bonus
action(s) proposed by the applicant meet the standards and intent of this section, the
zoning district, and this Ordinance to achieve the height bonus." For purposes of this
application, the applicant is submitting the following chart for consideration of the
categories and points for which it is seeking the bonus pursuant to Table 4(D) in the
UDO:
CATEGORY POINTS POINTS
PERMITTED REQUESTED
HIGH PERFORMANCE I up to 5 points 3 points
CONSTRUCTION I
HIGH PERFORMANCE up to 5 points 3 points
CONSTRUCTION 11
COMMUNITY SPACE up to 5 points 5 points
4. Continue with Review Under Sections 13.5 and 13.9: After the Planning Board has
completed its determination of the final bonus points, the applicant will work to create a
final, proposed building design which will then be submitted to the City for review under
Section 13.9 (Architectural Review) except for height review as that shall have been
determined under the prior steps. Relatedly, any material changes from the current
submission to the final proposed building design which implicates the draft site plan will
be modified for the final review by the Planning Board. SEQRA will also be conducted
as part of the review and prior to any determination for site plan or architectural review is
issued.
We look forward to commencing this process with the Planning Board and respectfully
request placement on the next available agenda. Kindly let me know if there are any questions or
concerns regarding this submission.
Thank you for your time and attention to this matter.
Law Office of M. Elizabeth Coreno, Esq. P.C.
63 Putnam Street, Suite 202
Saratoga Springs, New York 12866
(518) 682-6901 (office)
(518) 682-6902 (fax)
Torpey, Mark
April 19, 2023
Page 3 of 3
Sincerely,
cc: Tamie Ehinger, Chair of Design Review Board
Susan Barden
Amanda Tucker
Matthew Brobston
George Olsen
Amber Mathias
Law Office of M. Elizabeth Coreno, Esq. P.C.
63 Putnam Street, Suite 202
Saratoga Springs, New York 12866
(518) 682-6901 (office)
(518) 682-6902 (fax)