Loading...
HomeMy WebLinkAbout20221065 500 Union Longfellows Site Plan Traffic ReviewLaberg� Group 1964-Zw9 55 YEAR�4 OF EXCELLFSTCE ENGINEERING ARCHITECTURE • SURVEYING PLANNING April 3, 2023 VIA MAIL & EMAIL Ms. Kate Halliday Administrative Assistant — Engineering City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 Re: 500 Union Avenue 20221065: PUD Site Plan Amendment Review Traffic Report Review City of Saratoga Springs, New York Dear Ms. Halliday: We are in receipt of the following additional document for the above referenced subject: • Traffic Assessment, Longfellow Development, dated February 28, 2023. As requested, we have reviewed this document and find that, in general, the traffic concerns appear to have been satisfactorily addressed. Please refer to the specific comments on the traffic study, as described below: 1. The proposed site redevelopment will have a different configuration with more guest rooms and a bigger ballroom, but less restaurant and meeting room seating. 2. The trip generation computed for the new redevelopment was found to generate fewer trips than existing conditions. The intersections on the vicinity of the site are currently operating at good levels of service (A and B) and will continue to operate at good levels of service after the project is completed. The LOS for the intersection will drop to C for a limited number of movements but only during an event underway at the facility. 4. Based on the accident history, most that occurred at the Longfellows driveway intersection with Union Avenue were associated to driver error. Most of the site distances at the site driveway meet AASHTO's guidelines, with the exception of southbound stopping sight distance which is less than the recommended distance based on the posted speed limit. With an existing intersection warning sign already in place 600-feet north of the site driveway, the traffic study stated that no additional mitigation is needed. 6. As stated in the report, the developer should place any signage and landscaping at least 15- feet from the travel way to assure proper visibility. This requirement should be reflected on any site development plans for the property. 4 Computer Drive West • Albany, New York 12205 • (518) 458-7112 • Fax (518) 458-1879 www.labergegroup.com Ms. Kate Halliday April 3, 2023 Page 2 of 2 Please feel free to call our office if you have any questions. Very truly yours, LABERGE GRC Robert IJI&s, P.E. Senior Project Engineer RJT: djd C: Matt Zeno, City of Saratoga Springs D. Rhodes, P.E., Laberge Group JA2022131\Correspondence\Traffic Review 4-3-23.docx