HomeMy WebLinkAbout20190225 Bishop Subdivision EAF Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1—Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as
thoroughly as possible based on current information.
Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the
lead agency;attach additional pages as necessary to supplement any item.
Part 1 —Project and Sponsor Information
Name of Action or Project:
Bishop-Two(2)lot subdivision
Project Location (describe,and attach a location map):
#223 Maple Ave.; North East corner at intersection of Maple Ave.&Green St.
Brief Description of Proposed Action:
Subdivision of existing 18,183 sq.ft.(0.432 acre)lot into two(2)residential parcels.
Lot#1 includes the existing residence in conformance with zoning requirements having a lot area of 12,400 sq.ft.(0.285 acre)and lot width of 100'.
Lot#2 is proposed as a residential lot with an area of 6,413 sq.ft.and lot width of 50'.
Name of Applicant or Sponsor: Telephone: 518 1 424-7158
Todd Bishop&Linda Martelli Bishop E-Mail: todd@tbassociates.com
Address:
223 Maple Ave.
City/PO: State: Zip Code:
Saratoga Springs NY 12866
1. Does the proposed action only involve the legislative adoption of a plan, local law,ordinance, NO YES
administrative rule,or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
111
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit,approval or funding from any other government Agency? NO YES
If Yes, list agency(s)name and permit or approval:City of Saratoga Springs Zoning Board of Appeals approval,City of
Saratoga Water Connection,City Building Permit Approval 1�
3. a.Total acreage of the site of the proposed action? 0.432 acres
b. Total acreage to be physically disturbed? 0.147 acres
c. Total acreage(project site and any contiguous properties)owned
or controlled by the applicant or project sponsor? 0.432 acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
5. ® Urban [] Rural(non-agriculture) ❑ Industrial ❑ Commercial Residential (suburban)
0 Forest ❑ Agriculture E Aquatic 'Q Other(Specify):
fl Parkland
Page 1 of 3
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations? 17 El El
b. Consistent with the adopted comprehensive plan? J El
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
7
7. Is the site of the proposed action located in, or does it adjoin,a state listed Critical Environmental Area? NO YES
If Yes, identify:
*17/1
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
b. Are public transportation services available at or near the site of the proposed action?
El El
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action?
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
The new residence will be required to meet the current International Energy Conservation Construction Code. Most probably the
design professional will use the RES Check Energy Analysis program to confirm compliance.
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No,describe method for providing potable water:
n
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No,describe method for providing wastewater treatment:
12. a. Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district NO YES
which is listed on the National or State Register of Historic Places,or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the 1E1 El
State Register of Historic Places?
b. Is the project site,or any portion of it, located in or adjacent to an area designated as sensitive for
archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal,state or local agency?
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
ri
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres:
Page 2 of 3
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
El Shoreline El Forest El Agricultural/grasslands El Early mid-successional
1=j Wetland Urban L7J Suburban
15. Does the site of the proposed action contain any species of animal,or associated habitats,listed by the State or NO YES
Federal government as threatened or endangered?
ri
16. Is the project site located in the 100-year flood plan? NO YES
V(,
17. Will the proposed action create storm water discharge, either from point or non-point sources? NO YES
If Yes, ri
a. Will storm water discharges flow to adjacent properties?
b. Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? 7
If Yes, briefly describe:
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids(e.g.,retention pond,waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:
T9. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES
management facility?
If Yes, describe:
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe:
This has been checked"yes"by the EAF mapper. Further investigation has shown that this particular site and the adjoining sites have
NOT been subject to remediation. The EAF mapper is referring to current remediation across Rte.9&Rte.50 nearby.
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: Tonya Y-senchak,PE Date: 7/1 7/1 9
Signature: OPP Title:Project Representative
PRINT FORM Page 3 of 3
EAF Mapper Summary Report Wednesday, July 17, 2019 2:03 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
�r ,;• .., 1 �•.__-� ¢, ,,�� - _,� - ,,0r; ----i. ,�, i'i project sponsors and reviewing agencies in preparing an environmental
:16.5.36-x'...73 -•1,x6.29-'1.5 '� " 9-i*-5 — 1� r_... assessment form(EAF).Not all questions asked in the EAF are
. -'.-. ~- r� . I ~t••I - ''ti=, answered by the EAF Mapper.Additional information on any EAF
e ' 165.364-.14 4-1 r' '-L- _ i
,� -' _ };_.� .I:61p:29-1-i -.,_ ��` - - _- ,,fn rsF l question can be obtained by consulting the EAF Workbooks. Although
f f,.' _,1 5.:�•�6-P12 it --... ,i �e -.166.2 r-1•-4 r. the. "',ti the EAF Mapper provides the most up-to-date digital data available to
il,. --.� '�-.� r '`'—,,A.,, ..: IN '_° DEC,you may also need to contact local or other data sources in order
,/1. '166.2!,9-1-47. '--, °_ _., �,1` "I66.29-I R2 to obtain. data., ,�. ,r , not provided by the Mapper.Digital data is not a
l'.:-.., 115..36.2-6 '-
_.�r r ,--.. ,'_ _ 66,2 9-1-48:',' f :::•,., g Yz ~�i _ substitute for enc determinations.
' 6 6.2 • --5° �/}`rte"7 e
'� '.i .,+3.2.9-1-`7 1ti '. , lx,_.
•t•69_36-"-2 ' •L,-L .r LV r,� ~� ,�-r'- ,
,-- �,, . �" -` 6 P'''...2 -1-2 7:1 -�' _ hi i treat
'-�.- /16 6.29-'I-. r 1,.1-- r-'' >~� � .,�_,E r• r.. Ia, r.1. i ]
1--- tet , ..,.: .,-;s:it ii'itestorifp-;
...._
.... ,_...:
•
i 1' ;-...- ~S- 166'29-143:-' .:1 r-1: nry 'r1,, '- II Tomei i, -... .....", _.,....1 6.6.2i:-1-3;1 \
I :1._,
e-----
i ' .i• -4,:-. 4--- \ r rF p r
/ .rel•I 65,3 6-2.'".24 ...--(0--,..1......./
�`�• ;r + { � I I :� •1���( � '..�..... Cyd
on
1 5:36-2125.; --- 1�_..-- 1`3 ,.1114-1-67 orf-r di1-$l 1 ,. ,.;
it7 '1'165
.� , �-;: -, _ x.466.. 9. -:I,
.�' r Interm 0, IN+C-P g.N1ENT F;NECan
Jr�'r ..•y^�■ -. e.��•' Ja-er�'; ETI• n. -hins (I-rcn• ,;e# Esti p y1,+ �� ., 1tOLTM rgi iGamin
]'- 6...3 2 2 8.,,},, `L~-01 ' hV--Y t-• 3/C -1-- ':-°1 I �.1 PlittabaRi. I•� "1� 1
+ S--L- - '16 .0 0,- -59 1+ I ,-E ri(Th 1 te.nd),.N f 1�' ,, of urnbu 5 1 ` uswyl iiri ,I lig; 9.EM.EN�..T
`'1.65. -2-29..r Vit. Ot tr _tricep�ntrilxi -, ''-n the =IS f I F:,:. Cen,:Esti Jaen,METI,
`f 5.3 -2'-3O / �er rn mu n 1ty' �- .. `16 6.2.9-2-8 . . +��j��.r,� '9I lira t Heng 1'..6nM,;E;s ri
`7: �t rf } - li I T3�f L
r: �. ss111f +11 � '
Part 1 / Question 7 [Critical Environmental No
Area]
Part 1 / Question 12a [National or State No
Register of Historic Places or State Eligible
Sites]
Part 1 I Question 12b [Archeological Sites] Yes
Part 1 / Question 13a [Wetlands or Other No
Regulated Waterbodies]
Part 1 1 Question 15 [Threatened or No
Endangered Animal]
Part 1 / Question 16 [100 Year Flood Plain] Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Part 1 1 Question 20 [Remediation Site] Yes
Short Environmental Assessment Form - EAF Mapper Summary Report r