Loading...
HomeMy WebLinkAbout20230017 Airosmith Garage Construction Site Plan 2023 03 15 Comment Response Letter March 10, 2023 Susan Barden City of Saratoga Springs 474 Broadway Saratoga Springs, NY 12866 RE: 318 West Ave City of Saratoga Springs, Saratoga County, New York Dear Mrs. Barden: The following comments pertain to the submission package for 318 West Ave Saratoga Springs, NY. A comment email was received on March 6, 2023 from Al Flick. Responses to the comments are in bold below. Email Comments Comment 1: Include drawing index on Cover Sheet. Response 1: Drawing Index is included on the revised Cover Sheet Comment 2: Provide a Project Cost Estimate to determine if On-site + Off-site costs total $10,000 or more in which case an LOC or Cash Escrow would be required. Response 2: Cost Estimate is provided with the revised submission and shows that the LOC would be less than $10,000 and would not require the LOC to be funded. Comment 3: Did (or does) Lot Line Adjustment No. 2 as shown on survey map require Planning Board review/approval? Response 3: Subdivision has already been completed previously. Comment 4: Sheet L-2.0 should show YMCA easement limits similar to other easements including location of pipe/infrastructure. Response 4: There is no easement with the YMCA as the parcel was purchased from them. Comment 5: How will storm runoff from roof of new building be managed?. Response 5: Stormwater run-off will shed to existing low area or porous pavement and infiltrate. Comment 6: Provide spots grades for new areas of pavement to provide for proper drainage. Response 6: Spot grades has been provided on the revised plans. Comment 7: Is site lighting and/or exterior building lights needed? If so, provide info Response 7: No site lighting is proposed and any building lighting would be for security and reviewed by the building department. Comment 8: As needed, show silt fence or other necessary ESC measures. Will area around new building be lawn/grass covered? Response 8: Erosion sediment control measures are shown on the revised plans. Silt fence is shown for use during construction. Comment 9: Provide installation details for asphalt pavement, porous pavement, site lighting, silt fence, etc... as necessary Response 9: Construction details are provided for the revised plans. Sincerely, Matthew Brobston, RLA Associate Principal mbrobston@thelagroup.com G:\Proj-2021\2021107_Rood_and_Riddle_Equine_Hospital\2021107Admin\01Correspondence\2.7Review_Comments\2023-03-08 Comment Response Ltr.docx