HomeMy WebLinkAbout20220686 28 North Lane additional information ENGINEERING AMERICA CO .
76 WASHINGTON S T . SARATOGA SPRINGS , NY 1 2 8 6 6
5 1 8 / 5 8 7 - 1 3 4 0
TRANSMITTAL SHEET
TO: FROM:
Zoning Board of Appeals Tonya Yasenchak
COMPANY: DATE:
City of Saratoga Springs FEBRUARY 28,2023
FAX NUMBER: 'TOTAL NO.OF PAGES INCLUDING COVER:
3 + 7 attachments
PHONE NUMBER: SENDER'S REFERENCE NUMBER:
RE: YOUR REFERENCE NUMBER:
Berne—28 North Ln
ZBA Application—Revision&Options
❑ URGENT Q FOR REVIEW ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑AS REQUESTED
To the City of Saratoga Springs Zoning Board of Appeals:
Engineering America Co.Herein respectfully submits additional information and revised plans for
discussion related to the proposed area variance for lot width relating to a 2nd dwelling unit.
It is important to note that the project originated with the goal of constructing covered and
enclosed garage space for the property. The property exists as having 2 legal dwelling units.
However,there is no storage for vehicles,yard equipment,bicycles,etc. The Owner approached
EACo. to design a 2 or 3 car garage which would be consistent with the size&value of the Union
Ave.home and architecturally correct with neighborhood.
Several options were reviewed that included a 900 sq.ft.detached accessory structure with
conditioned space above for a gym or home office. Three such options are attached for review of
"feasibility." Each of the options reviewed allowed for the existing structure to remain,and for
construction without any variances required. These options (which are still feasible,just not
desired)include a total building area of 4,240 sq.ft. (36.4% < 40%max allowed).
- Opt. A:Places the new garage at 8'from the existing carriage house but has limited
back out&turn around space.This placement requires no variances or approval
from the ZBA. However, further investigation (after ZBA discussion) also shows
that this location places the structure under critical tree canopy of the Eastern
neighbor making the option not desirable.
- Opt.B: Places the new garage at 24'from the existing carriage house to allow for
back up area. This placement does not require any variances nor approval from the
ZBA. However,after further investigation (per ZBA),this location was found to
further infringe under the tree canopy of the Eastern neighbor making the option not
desirable.
- Opt. C: Places the new, garage at 5-6'from both side property lines (5'min.req) and
moves the building towards the center of the yard away from all tree canopies. This
placement does not require any variances nor approval from the ZBA. However,this
option was not preferred by the Owner as it reduced useable yard as well as reducing
privacy overlooking the Western neighbors'pool.
In order to limit the constructed building footprint and to increase usable yard area(so as not to
crowd the subject properties and neighbors),the project evolved to propose the removal of the
existing 2 d dwelling unit with the construction of a new 3 car garage and 2 d dwelling unit above.
This option,discussed at length with the ZBA,provides the goal of the 3 car garage without
losing the benefit of the existing 2"dwelling unit,all wlvle reducing footprint. The building
footprint allowed for a combined garage&dwelling unit structure is limited to 1,000 sq.ft. (well
below the 1,560 sq.ft.proposed if a new 900 sq.ft.garage is built with the existing 660 sq.ft.
building remaining).
EACo.has modified the proposed plot plan for additional review&discussion by the ZBA (see
attached Plot Plan D). This option includes the same concept and building size as previously
submitted,however,we are currently proposing that the new structure be moved an additional 2'
towards the alley,resulting in a 10' setback instead of the proposed 12'. This modified setback
allows for the proposed building to be 2'further away from the critical tree canopy of die Eastern
neighbor than last proposed. Furthermore,the total sq.ft. area of building(2,682 sq.ft.main
house and 1,000 sq.ft.new carriage house)with this option is 3,682 sq.ft. (31.6%building
coverage < 40%max.).
EACo.is hopeful that die ZBA will be open to granting approval to this project with the
proposed modified building placement as being more consistent with the neighborhood,having
less potential for damage to the existing trees while providing maximum privacy of the existing
yard and that of neighbors.What is being proposed,the removal of the existing building with new
construction will have less of an impact than if a totally new garage is built elsewhere on the
property(not requiring a variance).
As discussed,the variance requested is only to allow a 2°d dwelling unit on a lot that is less than
the 80'v idth. The 2°d dwelling unit is already existing with legal ZBA approval. There-,,ill be no
additional impact on the neighborhood or environment by reason of the 2 d dwelling unit as the
use and density of the property is not changing. EACo.fails to understand under what reason the
ZBA would have to deny the 2"d dwelling unit which already exists,rebuilt or not.
We are confident that we have answered and fulfilled any questions the ZBA may ahve about
this variance request.
2
EACo.is confident that we have answered and fulfilled any questions the ZBA may have about
this variance requested. Having proven by reason of calculation&depiction of optional plot
plans that the proposed project&variance allows for the maximum benefit of the neighborhood
and environment, EACo. believes that denying this proposal would incur potential for more of
an impact and therefore be arbitrary.
We thank you for your time,review&further discussion.
Please feel free to contact the EACo. office with any questions.
Tonya Yasenchak,PE
Enc.
3
FA St,ng 2 Unit
Olk tH ALLEY
wh-g.d
A
FF-
I11 I 11 1Z.Z d 1'.11,1.1..—S for
not allow far Nrn'ng
er me
-
New
I
Haraga location at 6'setback(5'min required). ear
structure
1—tin,i,fi,,g,, New garage
under tl canopy location restricts
—
tll,ll yard 1plll
U
BY N.SCO;IE'!D
W110A01 A 1111 01 LOT 29 01
A'S
BY—1-A.
S..,OF=11 'AL.L.11111
NO,_FN , B.
LAST REvzNED ON imumy 4,By PAuL F.
SOW9ELL
1995 SMVEY OF LANDS OF JMES B ANANOM BYNNE
.D111D
Y BNHELL I ASSOCIATES C I I I
34 L-1—,LLI,0
I-ES VIE AID IHARII lYll DAYED OLBSEA S, DO,
-,�Ovv Duse ENGINEERING
Z.—,Plot Pl— Op—A
AMERICA CO.
—y.Y---,P E.
"ve s Ste B— 't S__S.i Ston Sharon Byrne
28 N— #96 U.i..Aga.
Svii--veyor-s (51B)5S8P773g4
111 1— New Y— 12— Lity f F--g.F,inS.(M),S—g.—ty,
=-
remains unchanged ® w L L E Y
FF
24-b,Lk up&tum
and area
(s 0 n requ,d)
M1•I II
5� N—3 g—p
va
location
C 11 11
Proposed Ifli,91, 4
—Ofi-
reduces Pr—y W
P,,P,d,at N/e.st
.—D
BY N.SCO;IE'!D
W110A01 A 1111 01 LOT 29 01
A.S
BY—1-A.
S..,OF=11 'AL.L.11111
NO,_FN , B.
LAST REvzNED ON imumy 4,By PAuL F.
SOW9ELL
1995 SONVEY OF LANDS OF JMES B ANANOM BYNNE
.D111D
Y BNHELL I ASSOCIATES C I I I
34 L-1—,LLI,0
I-ES VIE AID IHARII lYll DAYED OL,.EA S, DO,
-,�Ovv Duse ENGINEERING
Z.—,Plot Plan: op—B
AMERICA CO.
—y. P E.
"ve s Ste B 't S__S.i Ston Sharon Byrne
L 28 N— #96 U.i..Aga.
Svii--veyor-s (51B)5S8P773g4
111 1— New Y— 12— Lity f F--g.F,inS.(M),S—g.—ty,
=-
rem'ns unchanged ® LLEY
FF
seO
I C-'
pl-p—to
garage
—
��-- New3car garage with
habitable 21d story(1.'_11h,—t)D. not
-
requ re any var antes for
or location
Thi,option allows 2,d I...t,
I—'awn into Western
This optional ne ghbOl,Y.ld&pod.—location avoids drastically reducing privacy
Onstruction under
all tree canOp es
C�
—IGAGI A 1111 01 LOT 29 01
A.S
N 6,
.Y—1-A.F1
I IT
S—OF=11 'AL.L.11111
NO,_FN , B.
LAST REvzNED ON jANumY 4,1995 rlr I'rl T TT I
By PAuL F.
70_
S—Y OF LANDS OF—ES B S AN_BYNNE
.D111D
Y'ONNELL I ASSOCIATES
34 L-1—,LLI'0
I-ES'Y'lE AID SHARON lYll DAIED OL'.EA N
DO, 51
-,�Ovv Duse ENGINEERING
_1�1 ZPl.t P— Opt—C
AMERICA CO.
—y.Y---,PE.
-ve s Ste 'D— ,S__S.i Ston Sharon Byrne
L 28 N— #96 U—.A—
]Larne S vii--veyo ors (51B)5S8P773g4
Is,
-- 1— New Y— 12— Lity f F--g.Fp inS.(ID),S—g.L—y,
=-
P-B.11mB Setback
.,d,f,,d t,10-,locateb.idiOg f.Ch.,from
Site Nep
z,
ALLEY
FF
`d-
rlsk to cedar roots
1.IS removed
-1
vl
PlIp-,d
p..........
NO ,-local-
.."C.Li-,,
treV111i 20-If
e canopy
on tree canopy / Lane alloys for ma um yard
privacy Of b.h Eastern
W.- O,ghbI,S
U
2-
EASY
7
.AlED
BY N.SCO;IE'!D
W110A01 A 1111 01 LOT 29 01 -UT 11
A'S
BY ENLLI-A.Y1
2,
1, U
SOREE,OF=11 'AL.L.11111
NO,_FN , R.
CASH REvzNED ON imumy 4,1 By FARE F.
_70 LL 995 UIC
I U
SMMY OF LANDS OF JAUES B ANANOM BYRNE UC-
.DlIlB
Y BNNELL I ASSOCIATES
34 L-1—,III
,0
I-ES BYRNE AID 11AR11 BYRNE
RATED OL,.EA S, DO, C I C I�11 CIA C),51
-,�Ovv Duse ENGINEERING
AMERICA CO. ZONING FOOT PENT:Option D
Steve B -H IS- I.
--S-ip Sharon Byrne
�8 Larid Svii--veyor-s N,,,-M�-
�-.-T1-=� #25 NORTH #96 UNION AVE.
111 11,11, 1111 1111,1111,Pill Yllk ===47"' City f S.-t.g.S,ing.ND),S-t.g.C...ty,N-Y-k
-8474 Yk-Y-k-N.. 50125 IC C- —11TICC
Zo
AM
10
. N O
♦ O
O p
[`•.� .l ry E
�• _4 � o 0
o m
• ,! - /! Ole
a
t • w0- 0
vOi
g
td c2O
li
� (0
�C�qco
p . 1
—
al
co
co
r
o
V t
ry co
` <' `I� �' y= V N
t v C O
�o
O cn O
O
O Q
CL
< (; to (A r N
4r l ^ N N N
Q 0- to O
, O O
v O — Q
Xt
44,I n
ul
I ^ ~ J N
.0 t t0 Q
tS 04 co
N C N N N
O O O
04 N
cn
to
CD
o �p
b N t0} N cq' @
N OD Q U A N o
01 Iwo1 O
10 J lci
V.
co C O. ito 0 C` CD coIL
a 0co
co o o z
U b t0
/ NQ
N ,
o60:
75
�o
`y I
{p h
G �,
T � o
N
p M
o
co
�i��yyEttA a
N
4u'
E A.
v 10 u'
v c Sri tO'�
(u o r
u
^y o �1.0fi09. O c N N
t0
ep 10oi � • ,� o� N m
�^ ^ ♦M o T) N N
/� EISO
fO �" in �~ Z' C� U N N
� �
° .� LLUL
T v
R r, -,o
00
pr N
0
o m
- o
0-
O O U)
r cD
�i U,
i
T
z
f
� 4 i0
O r N LO [�
' s r
+ a ro F. o .
' d - +1 !!
1 VL,
T
(3) cu LO
o �c
4-0
L rp i M c N
CU
O = Q c3i 4—
z Q Mco
,
1�
cn
M
� � J
tC + O O
LO
r 4C r c+M
r w (N p
p
{ rip '°'� r N p a--'
cv U U
T 7
r LL