Loading...
HomeMy WebLinkAbout20221065 500 Union Longfellows Renovations Laberge Review Letter 2023-02-14z 964-20i9 --- Laber e g �oF 55 Group �F�E ENGINEERING ARCHITECTURE • SURVEYING s PLANNING Ms. Kate I Ialliday Administrative Assistant — Engineering City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 February 14, 2023 VIA MAIL & EMAIl Re: 500 Union Avenue 20221065: PUD Site Plan Amcndment Review Second Letter City of Saratoga Spi inbs, New York__ Dcar Ms. Halliday: We are in receipt of the following revised documents for the above referenced subject: I. Response letter from The LA Group to first round of comments dated February 2, 2023; 2. Site Plan Amcndment Drawings, revision dated January 31, 2023; 3. SLQR bong Form Part 1 complete, revised, still dated November 22, 2022; 4. Stormwater Pollution Prevention Plan, revision dated January 3 1, 2023; and 5. FIngincering Report for Water and Sanitary Sewer. revision dated January 3 1, 2023. As requested, we have reviewed these documents and find that the majority of comments have been satisfactorily addressed. 'there are, however, a number of comments that require further attention, as described below: 4. Sheet 1.-2: Some new employee parking is being added to the southwest corner of the site shown behind existing parking with no new access provided. Cars will be parked two deep along the length of this row. This is not a typical arrangement, even when the parking is for employces. Applicant Response: The expanded employee parking comment is noted and paint markings will be utilised to denote employee only parking. The employees parking in this location will be working similar shifts and will be aware they are restricted to this area. Further- comment: The developer should be directed to provide documentation on this layout being used at similar facilities. In addition, the plan for management of the employee parking should be clearly described in a narrative along with how potential issues that may arise will be addressed. The narrative should mention that employces w111 not be allowed to park off -site or on the road. SWPPP Appendix It: Stormwater Management Report 2. Seclion d: The table comparing existing conditions to proposed conditions should also include the condition of, the project completed but without the Stormwater management controls proposed. 4 Computer Drive West • Albany, New York 12205 • (518) 458-7112 • Fax (518) 458-1879 www.labergegroup.com Ms. Kate Ilalliday February 14, 202 ) Page 2 of 2 This will demonstrate the increase in runoff posed by the development and the effect that the management structures will have. The text should be clear that this is possible considering the overland flow paths, infiltration rates of the soil and stormwater pipe sizes. This evaluation will be dependent on the geotcchnical report and may require additional infiltration rate tests. In addition, the redevelopment allowance must be factored into this analysis. Applicant Response: Analysis reviewing the proposed conditions without stormwater management controls has not been included. LA Group is not aware of any DFC or City requirement requiring this analysis. DFIC requires analyzing pic-development and post - development flow rates, which is included in the SWPPP. The project proposes an increase of 6,500 s.f. of impervious area which will be treated and attenuated by the underground infiltration system. Additionally, water quality calculations which account for existing disturbed and new impervious area is included in Appendix D of the SWPPP. Further Comment: Further analysis is not being requested. The tabulation of' pre- to post - development conditions can be further clarified by including the results of the same post - condition model without the stormwater management. "phis information is typically easily extracted from the model results and is often gathered in advance of stormwater nanagcment planning in order to properly size the structures. Please feel Free to call our office if you have any questions. Very truly yours, LA131;RGL GROUP Robert l ItUS, P.G. Senior Project linginecr JUT: djd C: Matt/.Clio, City of Saratoga Springs 1). Rhodes, P.F., LabergC Group 1:A2022131 \Corresponde��ceU2evicw 2-14-24.docx