Loading...
HomeMy WebLinkAbout20220912 Mouzon House Porch Mods NOD Tamie Ehinger, C ITY OF S ARATOGA S PRINGS Rob DuBoff, Chris Bennett D ESIGN R EVIEW B OARD Leslie DiCarlo Jeff Gritsavage Tad Roemer City Hall - 474 Broadway Ellen Sheehan Saratoga Springs, New York 12866 Karen Cavotta, Tel: 518-587-3550 x.2517 www.saratoga-springs.org N OTICE OF D ECISION In the matter of the application #20220912 Mouzon House Porch Modifications 1 York Street Saratoga Springs, New York 12866 Involving Modifications to an approval for exterior modifications (new porch materials and colors, new stained glass panels) within the Transect-6 Urban Core district in an Architectural Review District, tax parcel #165.52-1- 52, within the City of Saratoga Springs. In accordance with 6 NYCRR Part 617, the Design Review Commission classifies this request as a SEQR: Type II action exempt from further SEQR review And, in accordance with the objectives, standards and guidelines contained in the City Zoning Ordinance Article 240-7.5 Architectural Review, the Design Review Commission issues the following decision on February 1, 2023: Approve with the following conditions: 1. The porch modifications to be built as originally presented: The lowering of the railings to the previously approved height with the booster rail Return to the 3-color palette, as originally presented, including the painting of the window trim Installing the surround on the porch framing and the framing of the panels on the porch Removing the stained glass panels Lattice work shall be what was originally approved 2. Light fixture may remain, applicant to submit cut sheet for the record. 3. Applicant to meet with Real Estate Committee to regarding the Right-of-Way issues with the porch overhang. Applicant to return for further review of the overhang in the case that it is not be able to be built as originally approved. Note: this approval shall expire 18 months from the issuance date unless any necessary building permit has been issued and actual work begun. Record of vote: motion to approve made by T. Ehinger, seconded by L. DiCarlo: passed 6-0 In favor: T. Ehinger, R. DuBoff, C. Bennett, L. DiCarlo, J. Gritsavage, E. Sheehan Absent: T. Roemer As a result of this decision, the applicant: may proceed with the proposed project as approved Page 1 of 2 Please contact the Building Department to verify permit requirements. February 15, 2023 Chair Received by Accounts cc: Building Department File Accounts Dept. Applicant/Agent Page 2 of 2