Loading...
HomeMy WebLinkAbout20230064 Hutchins Road SUP 2271 Rt 50 EAFPage 1 of 3 Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 – Project and Sponsor Information Name of Action or Project: Project Location (describe, and attach a location map): Brief Description of Proposed Action: Name of Applicant or Sponsor:Telephone: E-Mail: Address: City/PO: State: Zip Code: 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. NO YES 2. Does the proposed action require a permit, approval or funding from any other government Agency? If Yes, list agency(s) name and permit or approval: NO YES 3. a. Total acreage of the site of the proposed action? __________ acres b. Total acreage to be physically disturbed? __________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? __________ acres Check all land uses that occur on,DUHadjoining RU near the proposed actioQ  8UEDQRural (non-agriculture),ndustrial Commercial Residential (suburban) $TXDWLF2WKHU 6SHFLI\ ƑForest Agriculture ƑParkland 2. Continued: Village of Ballston Spa water service (Site Plan); Saratoga Springs Planning Board; Watercourse/Wetland Permit (Site Plan) NYS DOH/DEC Sewage Disposal (Site Plan); Saratoga County Planning Advisory Opinion; ACOE Wetland Crossing (Site Plan). Hutchins Road Community 2271 NYS Route 50, Saratoga Springs, NY 12866 Refer to attached project narrative The LA Group, P.C. 518-587-8100 mbrobston@thelagroup.com 40 Long Alley Saratoga Springs NY 12866 ✔ City of Saratoga Springs Special Use Permit; Design Review Board approval; NYSDOT curb cut approval; (continued in footnote below) ✔ 5.4 2.6 5.4 ✔ ✔ ✔ ✔ Page 2 of 3 5. Is the proposed action, a. A permitted use under the zoning regulations? b. Consistent with the adopted comprehensive plan? NO YES N/A 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?NO YES 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? If Yes, identify: ________________________________________________________________________________ NO YES a. Will the proposed action result in a substantial increase in traffic above present levels? EAre public transportation services available at or near the site of the proposed action? FAre any pedestrian accommodations or bicycle routes available on or near WKHsite of the proposed action? NO YES 9. Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 10. Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable ZDWHU: _________________________________________ _____________________________________________________________________________________________ NO YES 11. Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: ______________________________________ _____________________________________________________________________________________________ NO YES D'RHVWKHSURMHFWVLWHFRQWDLQRULVLWVXEVWDQWLDOO\FRQWLJXRXVWRDEXLOGLQJDUFKDHRORJLFDOVLWHRUGLVWULFW ZKLFKLVOLVWHGRQWKH1DWLRQDORU6WDWH5HJLVWHURI+LVWRULF3ODFHVRUWKDWKDVEHHQGHWHUPLQHGE\WKH &RPPLVVLRQHURIWKH1<62IILFHRI3DUNV5HFUHDWLRQDQG+LVWRULF3UHVHUYDWLRQWREHHOLJLEOHIRUOLVWLQJRQWKH 6WDWH5HJLVWHURI+LVWRULF3ODFHV" DUFKDHRORJLFDOVLWHVRQWKH1<6WDWH+LVWRULF3UHVHUYDWLRQ2IILFH 6+32 DUFKDHRORJLFDOVLWHLQYHQWRU\" NO YES  D. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? EWould the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES E,VWKHSURMHFWVLWHRUDQ\SRUWLRQRILWORFDWHGLQRUDGMDFHQWWRDQDUHDGHVLJQDWHGDVVHQVLWLYHIRU ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔The project will receive water from the Village of Ballston Spa (existing public water supply). ✔Wastewater treatment will be completed on-site through the employment of a communal septic system. ✔ ✔ ✔ ✔ The ACOE wetland that runs parallel to the southern border of the property is a palustrian forested wetland bordering on a perennial stream (RPW). The entry drive will cross over this wetland at its connection to NYS Route 50 and will affect approximately 450 square feet of the wetland. The segment of wetland that will be crossed by the entry drive is an existing drainage way on NYSDOT land. EEAF Mapper Summary Report Thursday, January 26, 2023 1:37 PM Disclaimer:The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources in order to obtain data not provided by the Mapper. Digital data is not a substitute for agency determinations. Part 1 / Question 7 [Critical Environmental Area] No Part 1 / Question 12a [National or State Register of Historic Places or State Eligible Sites] No Part 1 / Question 12b [Archeological Sites] Yes Part 1 / Question 13a [Wetlands or Other Regulated Waterbodies] Yes - Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. Part 1 / Question 15 [Threatened or Endangered Animal] No Part 1 / Question 16 [100 Year Flood Plain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Part 1 / Question 20 [Remediation Site] No 1Short Environmental Assessment Form - EAF Mapper Summary Report