HomeMy WebLinkAbout20211081 126 West Ave. SPR Correspondance 1/30/23,6:17 PM Zimbra
Zimbra susan.barden@saratoga-springs.org
Re: 126 West Ave. Site Plan Review
From : AI Flick <al.flick@saratoga-springs.org> Fri, ]an 20, 2023 01:49 PM
Subject : Re: 126 West Ave. Site Plan Review ���3 attachments
To : Susan Barden <susan.barden@saratoga-springs.org>
Cc : cpagan <cpagan@Ingallsllp.com>, Kate Halliday
<kate.halliday@saratoga-springs.org>, Debbie La6reche
<deborah.labreche@saratoga-springs.org>, jnechamen
<jnechamen@LaBeIIaPC.com>, Pete Yetto
<PYetto@Ingallsllp.com>, dingalls <dingalls@Ingallsllp.com>
H i Susa n-
I reviewed latest submittal documents including Site Plans (d.11/22/22) and offer the following
comments on behalf of the City Engineers Office:
Sheet 2 - Exist. Conditions/Demo Plan
- Existing sewer lateral not connected to street manhole as shown. Tie-in likely just
downstream of manhole.
Sheet 3 - Site Plan
- Show proposed street addresses for office, apartments, and townhomes.
- Show existing sidewalk in lighter line-type to differentiate from proposed.
Sheet 4 - Grading & Utility Plan
- Verify 8x2 TS/V is available. Specify/type size on plan.
- If units are individually owned, how will water/sewer main maintenance/repair
responsi bi I ity be assig ned?
- Provide invert of exist. sewer stub off West Ave for proposed connection. Specify SDR
rating of sewer laterals on plan.
- Consider connecting 6" porous pavement underdrain to CB-1 for pipe cleaning access.
Sheet 6 - Lighting & Landscaping Plan
- Provide (3) Sternberg lights on West and (3) on Grand, approximately 70-feet apart per
attached sketch.
- Per City Arborist, remove trees behind sidewalk on West Avenue. �ocate new trees on
West per attached sketch with 2-species mix, small size (Species List attached).
- Detail 5/6 - Please use City Standard Detail-Dwg. �1 found on City website
(Government/Standard Details).
Sheet 7 - Construction Details
- Detail 2/7 - Identify invert of underdrain relative to the bottom of 12" reservoir course.
Update & resubmit porous pavement sizing worksheet(s) which calculate storage volume
above underdrain.
- D eta i l 9/7 -Ad d R H-o pe n to N ote 2.
- Detail 10/7 - Please use City Standard Detail-Dwg. LT-1 found on City website
(Government/Standard Details).
https://m.saratoga-springs.org/h/printmessage?id=76430&tz=America/New_York 1/6
1/30/23,6:17 PM Zimbra
Please let me know if anyone has questions, concerns, etc...
Thanks very much.
From: "al flick" <al.flick a�saratoga-springs.org>
To: "dingalls" <dingalls@Ingallsllp.com>
Cc: "cpagan" <cpagan��I ngallsll p.com>, "Kate Hall iday" <kate.hall iday@saratoga-
springs.org>, "Susan Barden" <susan.barden@saratoga-springs.org>, "Debbie LaBreche"
<deborah.labreche@saratoga-springs.org>, "jnechamen" <jnechamen@LaBeIIaPC.com>,
"Pete Yetto" <PYetto a�ingallsllp.com>
Sent: Thursday, January 12, 2023 2:20:37 PM
Subject: Re: 126 West Ave. Site Plan Review
Dave-
I do have some addt'I comments which were not mentioned on City's DE review comments.
I will get these to you next week.
Thank you,
AI
From: "dingalls" <dingalls@Ingallsllp.com>
To: "al flick" <al.flick a�saratoga-springs.org>
Cc: "cpagan" <cpagan a�i ngallsll p.com>, "Kate Hall iday" <kate.hall iday��saratoga-
springs.org>, "Susan Barden" <susan.barden@saratoga-springs.org>, "Debbie LaBreche"
<deborah.labreche a�saratoga-springs.org>, "jnechamen" <jnechamen a�LaBeIIaPC.com>,
"Pete Yetto" <PYetto@Ingallsllp.com>
Sent: Thursday, January 12, 2023 1:52:06 PM
Subject: RE: 126 West Ave. Site Plan Review
CAUTION: This email originated outside of the City network. Please contact IT Support if
you need assista nce determ i n i ng if it's a th reat before open i ng attach ments or cl icki ng
any links.
https://m.saratoga-springs.org/h/printmessage?id=76430&tz=America/New_York 2/6
1/30/23,6:17 PM Zimbra
Hi AI
�
We are finishin u the res onse to TDE comments and would like to
9 p p
know if ou have a n com ments so we ca n su bm it one
y y ,
com rehensive res onse. Tha n ks.
p p
Dave.
From: AI Flick <al.flick@saratoga-springs.org>
Sent: Tuesday, January 3, 2023 1:11 PM
To: Dave Ingalls <dingalls@ingallsllp.com>
Cc: Chad Pagan <cpagan@ingallsllp.com>; Kate Halliday <kate.halliday@saratoga-springs.org>;
Susan Barden <susan.barden@saratoga-springs.org>; Debbie La6reche
<deborah.labreche@saratoga-springs.org>; jnechamen <jnechamen@La6eIlaPC.com>
Subject: Re: 126 West Ave. Site Plan Review
Dave-
I have a few additional comments of my own which I'll forward shortly. Thank you.
From: "dingalls" <dingalls@Ingallsllp.com>
To: "al flick" <al.flick@saratoga-springs.org>
Cc: "cpagan" <cpagan@Ingallsllp.com>, "Kate Halliday" <kate.halliday_@saratoga-springs.org>,
"Susan Barden" <susan.barden@saratoga-springs.org>, "Debbie La6reche"
<deborah.labreche@saratoga-springs.org>, "jnechamen" <jnechamen@La6eIlaPC.com>
Sent: Tuesday, January 3, 2023 12:06:08 PM
Subject: RE: 126 West Ave. Site Plan Review
CAUTION: This email originated outside of the City network. Please contact IT Support if you need assistance
determining if it's a threat before opening attachments or clicking any links.
Received. We wi I I review a nd rovide a res onse shortl . Ha New
p p Y ppY
Yea r!
Dave.
David F. Ingalls, PE � Ingalls &Associates, LLP
2603 Guilderland Avenue � Schenectady � New York � 12306
� o � 518.393.7725 ext. 113 � f � 518.393.3761 � c � 518.588.1042
� e � dingalls c ingallsllp.com
�
�� � �
https://m.saratoga-springs.org/h/printmessage?id=76430&tz=America/New_York 3/6
1/30/23,6:17 PM Zimbra
The information contained in this communication and attached file is intended only for the use of the individual or entity named above and may contain
information that is privileged and/or confidential.If the reader of this message is not the intended recipient,you are hereby notified that any
dissemination,distribution or copying of this communication is strictly prohibited. If you have received this communication in error,please notify the
sender immediately by return e-mail or telephone and delete the original message and any copy of it from your computer system.Further,this Firm
accepts no responsibility for any loss or damage from the use of this message and/or any attachments,including damage from virus.All information
contained in this e-mail and its attachments relating to the official business of Ingalls&Associates LLP is proprietary to the company.
� Please consider the environment before printing this email.
From: AI Flick <al.flick@saratoga-springs.org>
Sent: Tuesday, ]anuary 3, 2023 9:20 AM
To: Dave Ingalls <dingalls@Ingallsllp.com>
Cc: Chad Pagan <cpagan@Ingallsllp.com>; Kate Halliday <kate.halliday_@saratoga-springs.org>;
Susan Barden <susan.barden@saratoga-springs.org>; Debbie La6reche
<deborah.labreche@saratoga-springs.org>; jnechamen <jnechamen@La6eIlaPC.com>
Subject: 126 West Ave. Site Plan Review
Good Morning Dave-
Happy New Year.
Attached please find the first comment letter provided by the City's Designated Engineer
(LaBella Associates) relative to their review of the 126 West Avenue Site Plan application.
Please provide a response letter along with revised plans and documents, as necessary,
which address LaBella's comments.
If you have any questions or concerns, let us know.
Thank you,
AI
Albert Flick
Sr. Engineering Technician
City of Saratoga Springs
(518) 587-3550 ext. 2573
Confidentiality/Privilege Notice: This e-mail communication and any files transmitted with it contain
privileged and confidential information from the City of Saratoga Springs and are intended solely for
the use of the individual(s) or entity to which it has been addressed. If you are not the intended
recipient, you are hereby notified that any disclosure, copying, distribution, or taking any other action
with respect to the contents of this message is strictly prohibited. If you have received this e-mail in
error, please delete it and notify the sender by return e-mail. Thank you for your cooperation.
Albert Flick
Sr. Engineering Technician
City of Saratoga Springs
(518) 587-3550 ext. 2573
https://m.saratoga-springs.org/h/printmessage?id=76430&tz=America/New_York 4/6
1/30/23,6:17 PM Zimbra
Confidentiality/Privilege Notice: This e-mail communication and any files transmitted with it contain
privileged and confidential information from the City of Saratoga Springs and are intended solely for
the use of the individual(s) or entity to which it has been addressed. If you are not the intended
recipient, you are hereby notified that any disclosure, copying, distribution, or taking any other action
with respect to the contents of this message is strictly prohibited. If you have received this e-mail in
error, please delete it and notify the sender by return e-mail. Thank you for your cooperation.
https://m.saratoga-springs.org/h/printmessage?id=76430&tz=America/New_York 5/6
1/30/23,6:17 PM Zimbra
Albert Flick
Sr. Engineering Technician
City of Saratoga Springs
(518) 587-3550 ext. 2573
Albert Flick
Sr. Engineering Technician
City of Saratoga Springs
(518) 587-3550 ext. 2573
Confidentiality/Privilege Notice: This e-mail communication and any files
transmitted with it contain privileged and confidential information from the City
of Saratoga Springs and are intended solely for the use of the individual(s) or
entity to which it has been addressed. If you are not the intended recipient, you
are hereby notified that any disclosure, copying, distribution, or talcing any
other action with respect to the contents of this message is strictly prohibited.
If you have received this e-mail in error, please delete it and notify the sender
by return e-mail. Thank you for your cooperation.
� Lig ht &Tree Location Sketch.pdf
1 MB
� City Species List.pdf
917 KB
https://m.saratoga-springs.org/h/printmessage?id=76430&tz=America/New_York 6/6