#20221089
IN THE MATTER OF THE APPEAL OF
Emigh and Patrick Schmidt
52 Dyer Switch Road
Saratoga Springs,NY 12866
Based on the submitted evidence that the application for an extension of a granted area variance does not differ
from the original application and approval, and that there have been no changes in the condition of the property or
neighborhood warranting otherwise, the Board moves that the application of Emigh and Patrick Schmidt for the
property located at Cobb Alley,Lot A(formerly Lot 1)in the City of Saratoga Springs, and identified as tax parcel
165-66-2-70.1 that was granted on July 12,2021 for construction of a single family residence in the UR-3 District,
be approved and that the variance approval be extended from 18 months from the date that such resolution would
have expired, December 12, 2022 with the new expiration date to be May 12, 2024.
The variance extension shall expire on May 12, 2024 unless the necessary building permit has been issued and
actual construction begun as per the Zoning Ordinance or otherwise further extended.
Please note the details and conditions of the original approval#3025 dated April 23, 2018. Attached below are the
notes and conditions of approval for reference:
Notes:
1. DRC Historic Review for demolition and construction required
2. Applicant must comply with 17 NYCRR Part 32- Oil Spill Prevention and Control- actions to be taken in
case of discharge,if applicable.
3. Applicant must comply with 6 NYCRR Part 360.13 - special requirements for pre-determined beneficial use of
fill material,if applicable.
Conditions:
1. Submit for review and approval by the City Engineer-Grading plan,utilities plan, erosion and sediment
control plan,water connection application, right-of-way work cost estimate and letter of credit.
2. No accessory structures are permitted
3. Structure is required to be sprinkled per Fire Chief s recommendation
It is so moved. Dated:
January 23, 2023
Page 1 of 2
Adopted by the following votes:
AYES: 5 (G. Simpson, B. Gallagher, B. Dailey, E. Bergmann, A. Smith)
NAYES: 0
This variance shall expire 18 months following the filing date of such decision unless the
necessary building permit has been issued and actual construction begun as per the Unified
Development Ordinance.
I hereby certify the above to be a full, true and correct copy of a resolution duly adopted by the
Zoning Board of Appeals of the City of Saratoga Springs on the date above mentioned, four
members of the Board being present.
SIGNATURE: 01/24/2023
CHAIR DATE RECEIVED BY
ACCOUNTS
DEPT.
Page 2 of 2