Loading...
HomeMy WebLinkAbout20230008 Duplainville Site Plan Cost EstimateEngineer's Estimate Opinion of Cost Proj. #: 22-024 Proj. Desc.: N/A Prepared By:EAS Date: 12-16-2022 Item Qty.Unit Unit Price Cost Total Within R.O.W. 100%4,960.00$ Total On-Site 25%418,117.00$ Total Letter of Credit 423,077.00$ Roadway Asphalt, Top Course (1-1/2" depth)10 TON 125.00$ $ 1,250.00 Asphalt, Binder Course (2-1/2" depth)16 TON 110.00$ $ 1,760.00 12" Subbase Course 39 CY 50.00$ $ 1,950.00 Total Within R.O.W.4,960.00$ Site Preparations Construction Stakeout 1 LS 5,000.00$ $ 5,000.00 Temporary Traffic Control 1 LS 2,000.00$ $ 2,000.00 Subtotal 7,000.00$ Erosion Control Sediment Control Fence 1,035 LF 1.50$ $ 1,552.50 Temporary Sediment Trap 1 LS 2,500.00$ $ 2,500.00 Temporary Construction Access 135 SY 8.00$ $ 1,080.00 Inlet Protection at Drywells 0 EA 57.00$ $ - Subtotal 5,132.50$ Demolition and Site Clearing Clearing and Grubbing 21 AC 5,000.00$ $ 105,000.00 Strip Topsoil and Stockpile 16,576 CY 5.00$ $ 82,880.00 Subtotal 187,880.00$ Excavation and Site Grading Site Grading 99,228 SY 1.00$ $ 99,228.00 Subtotal 99,228.00$ Storm Drainage Catch Basin 5 EA 500.00$ $ 2,500.00 24" HDPE 253 LF 35.00$ $ 8,855.00 18" HDPE 118 LF 30.00$ $ 3,540.00 15" HDPE 89 LF 25.00$ $ 2,225.00 12" HDPE 53 LF 25.00$ $ 1,325.00 10" HDPE 293 LF 23.00$ $ 6,739.00 Rip Rap Protection 43 CY 28.00$ $ 1,204.00 Subtotal 26,388.00$ Paving and Curbs Segmental Retaining Wall 619 SF 50.00$ 30,950.00$ Integral Concrete Curb 230 LF 10.00$ 2,300.00$ Asphalt, Top Course (1-1/2" depth)455 TON 125.00$ 56,875.00$ Asphalt, Binder Course (2-1/2" depth)759 TON 110.00$ 83,490.00$ 12" Subbase Course 1,864 CY 50.00$ 93,200.00$ 12" Gravel For material layout 19,983 CY 50.00$ 999,150.00$ Concrete Paving (5")4,693 SF 4.00$ 18,772.00$ Subtotal 1,284,737.00$ Lighting Site Pole Lights 7 EA 4,000.00$ $ 28,000.00 Subtotal 28,000.00$ Site Work Work Within R.O.W. 22-024 Cost Estimate.xlsx Verity Engineering, D.P.C. P.O. Box 474 Troy, New York 12181 Page 1 of 2 Engineer's Estimate Opinion of Cost Proj. #: 22-024 Proj. Desc.: N/A Prepared By:EAS Date: 12-16-2022 Planting Fine Grade and Seed 25,675 SY 1.10$ $ 28,242.50 Trees 5 EA 350.00$ $ 1,750.00 Small Shrubs 7 EA 20.00$ $ 140.00 Perennials 40 EA 8.00$ $ 320.00 3" Mulch @ flower beds 5 CY 30.00$ $ 150.00 Subtotal 30,602.50$ Survey As-Built Survey 1 LS 3,500.00$ $ 3,500.00 Subtotal 3,500.00$ Total On-Site 1,672,468.00$ Total Within R.O.W.4,960.00$ Total On-Site 1,672,468.00$ Grand Total 1,677,428.00$ 22-024 Cost Estimate.xlsx Verity Engineering, D.P.C. P.O. Box 474 Troy, New York 12181 Page 2 of 2