HomeMy WebLinkAbout20221117 26 Freedom Way Site Plan Cost EstimateEngineer's Estimate Opinion of Cost Proj. #: 20-015 Proj. Desc.: 26 Prepared By:EAS Date: 11-23-2022 Item Qty. Unit Unit Price Cost Total Within R.O.W. 100% 32,729.96$ Total On-Site 25% 128,567.50$ Total Letter of Credit 161,297.46$ Roadway Asphalt, Top Course (1-1/2" depth) 65 TON 125.00$ $ 8,180.29 Asphalt, Binder Course (2-1/2" depth) 109 TON 110.00$ $ 11,999.67 12" Subbase Course 251 CY 50.00$ $ 12,550.00 Total Within R.O.W. 32,729.96$ Site Preparations Construction Stakeout 1 LS 5,000.00$ $ 5,000.00 Temporary Traffic Control 1 LS 2,000.00$ $ 2,000.00 Subtotal 7,000.00$ Erosion Control Sediment Control Fence 560 LF 1.50$ $ 840.00 Temporary Sediment Trap 1 LS 2,500.00$ $ 2,500.00 Temporary Construction Access 135 SY 8.00$ $ 1,080.00 Inlet Protection at Drywells 4 EA 57.00$ $ 228.00 Subtotal 4,648.00$ Demolition and Site Clearing Clearing and Grubbing 3 AC 5,000.00$ $ 15,000.00 Strip Topsoil and Stockpile 1,542 CY 5.00$ $ 7,710.00 Subtotal 22,710.00$ Excavation and Site Grading Site Grading 17,500 SY 1.00$ $ 17,500.00 Pavement Subbase Course - Roadway 3,370 CY 12.00$ $ 40,440.00 Pavement Subbase Course - Sidewalk 80 CY 12.00$ $ 960.00 Subtotal 58,900.00$ Storm Drainage Catch Basin 2 EA 500.00$ $ 1,000.00 24" HDPE 108 LF 35.00$ $ 3,780.00 15" HDPE 158 LF 25.00$ $ 3,950.00 8" HDPE 215 LF 28.00$ $ 6,020.00 Rip Rap Protection 4 CY 28.00$ $ 112.00 Subtotal 14,862.00$ Paving and Curbs Segmental Retaining Wall 150 SF 50.00$ 7,500.00$ Integral Concrete Curb 211 LF 10.00$ 2,110.00$ Asphalt, Top Course (1-1/2" depth) 700 TON 125.00$ 87,500.00$ Asphalt, Binder Course (2-1/2" depth) 1,165 TON 110.00$ 128,150.00$ 12" Subbase Course 2,453 CY 50.00$ 122,650.00$ 12" Gravel For Vehicle Parking 430 CY 50.00$ 21,500.00$ Concrete Paving (5") 2,490 SF 4.00$ 9,960.00$ Subtotal 379,370.00$ Lighting Site Pole Lights 3 EA 4,000.00$ $ 12,000.00 Subtotal 12,000.00$ Site Work Work Within R.O.W. 20-015 Cost Estimate.xlsx Verity Engineering, D.P.C. P.O. Box 474 Troy, New York 12181 Page 1 of 2 Engineer's Estimate Opinion of Cost Proj. #: 20-015 Proj. Desc.: 26 Prepared By:EAS Date: 11-23-2022 Planting Fine Grade and Seed 8,800 SY 1.10$ $ 9,680.00 Trees 3 EA 350.00$ $ 1,050.00 Small Shrubs 7 EA 20.00$ $ 140.00 Perennials 40 EA 8.00$ $ 320.00 3" Mulch @ flower beds 3 CY 30.00$ $ 90.00 Subtotal 11,280.00$ Survey As-Built Survey 1 LS 3,500.00$ $ 3,500.00 Subtotal 3,500.00$ Total On-Site 514,270.00$ Total Within R.O.W. 32,729.96$ Total On-Site 514,270.00$ Grand Total 546,999.96$ 20-015 Cost Estimate.xlsx Verity Engineering, D.P.C. P.O. Box 474 Troy, New York 12181 Page 2 of 2