Loading...
HomeMy WebLinkAbout20221117 26 Freedom Way Site Plan 20210219 AgroChem Expansion Gen Letter February 19, 2021    Mr. John E. Munter  Munter Enterprises, Inc.  881 Murray Road  Middle Grove, NY 12850    RE:  Traffic Assessment, AgroChem Expansion, 26 Freedom Way, City of Saratoga Springs, Saratoga  County, New York; CM Project No. 121‐028    Dear Mr. Munter:     Creighton Manning Engineering, LLP (CM) has conducted a traffic assessment for the AgroChem facility  currently located in the WJ Grande Industrial Park at 26 Freedom Way in the City of Saratoga Springs. The  proposed project consists of a new 16,050 square‐foot (SF) expansion of the existing 33,817 SF AgroChem  manufacturing  building.  This  evaluation  is  based  on  the  proposed  “Site  Plan”  prepared  by  Verity  Engineering, D.P.C. dated December 12, 2020 (Attachment A).        1.0 Traffic Forecasts & Assessment  Site Access  Access to the project site will be maintained via the existing, full‐access driveway along with two new  proposed  full‐access  driveways  on  Freedom  Way.  The  first  proposed  driveway  will  be  constructed  approximately 355‐feet north of the existing driveway. In addition, Freedom Way will be extended to the  south and a second new proposed driveway will be constructed approximately 100‐feet south of the  existing driveway. A qualitative sight distance analysis conducted at the existing driveway and proposed  northern driveway indicates that good sight lines are provided for drivers entering or exiting the site on  Freedom Way.  Figure 1 – Project Location  Project  Site  Greenfield  Manufacturing PeroxyChem  AgroChem  Mr. John E. Munter  February 19, 2021  Page 2 of 7    Site Generated Traffic  Trip generation determines the quantity of traffic expected to travel to/from a project site. To provide  site specific trip generation rates of this manufacturing use, morning and afternoon peak hour traffic  counts were conducted at the site driveways associated with the existing 33,817 SF facility on Wednesday,  February 3, 2021 from 4:00 to 6:00 p.m. and on Thursday, February 4, 2021 from 7:00 to 9:00 a.m.  (included under Attachment B). The rate of trips generated per 1,000 SF was calculated and applied to full  build‐out of the site. The trip generation estimate of the proposed expansion based on the existing trips  rates are shown in Table 1.     Table 1 – Trip Generation Summary  Land Use AM Peak Hour PM Peak Hour  Enter Exit Total Enter Exit Total  33,817 SF Existing Facility (Site Specific Counts)  11  3  14  1  9 10  16,050 SF Proposed Expansion         (New trips based on existing trip rate) 6  1  7  1  4  5  Full Build‐Out Total Trips (49,867 SF)  17  4  21  2  13  15    The trip generation summary shown in Table 1 indicates that the proposed expansion of the existing  AgroChem facility will generate seven new AM peak hour trips and five new PM peak hour trips. The entire  AgroChem facility (existing and proposed expansion) will generate a total of 21 vehicle trips during the  AM peak hour (17 entering and 4 exiting) and a total of 15 vehi cle tips during the PM peak hour (2 entering  and 13 exiting).     2.0 Conclusions  The proposed project consists of a 16,050 SF expansion of the existing 33,817 SF AgroChem facility  currently located on Freedom Way. Access to the project site will be maintained via the existing, full‐ access driveway along with two new proposed full‐access driveways on Freedom Way. The proposed  16,050 SF expansion of the existing AgroChem facility will generate seven new AM peak hour trips (six  entering and one exiting) and five new PM peak hour trips (one entering and four exiting). The total 49,867  SF AgroChem facility will generate 21 vehicle trips during the AM peak hour and 15 vehicle trips in the PM  peak hour based on site specific trip generation rates. Based on the low trip generation (less than 10 new  trips per hour), there will be no significant traffic impacts from the project.    Please call our office if you have any questions or comments regarding the above analysis.    Respectfully submitted,  Creighton Manning Engineering, LLP        Mark Nadolny  Associate    Attachments    N:\Projects\2021\121‐028 Munter ‐ ArgoChem Expansion\Working\Traffic\Reports\20210219_AgroChem Expansion Trip Gen Letter_121028.docx                 Attachment A  Site Plan      AgroChem Expansion  City of Saratoga Springs, New York           (;7(1'(;,67,1*52$':$<672506(:(572%(5(/2&$7('5  5  5  5  5  5  5      352326('/27/,1((;,67,1*/27/,1()5(('20:$<352326('$5($$&(;,67,1*$5($$&(;,67,1*/27/,1( 6,'(6(7%$&. 5($56(7%$&. 6,'(6(7%$&.352326('$'',7,216)))( )52176(7%$&.63$&(663$&(663$&(6(;,67,1*%8,/',1*672506(:(572%(5(/2&$7('352326('67250:$7(50$1$*(0(17$5($5  5  5  5  5  5                RI&$*52&+(0(;3$16,21%8,/',1*$'',7,21)5(('20:$<_&,7<2)6$5$72*$635,1*6_6$5$72*$&2817<_1(:<25.67$7(6,7(3/$1$-9%76  $-9$-9$$-9&21&(37         3??&$'?B02'(/?6,7(':*_30'$7($33529('%<&+(&.('%<6&$/('(6,*1('%<'5$:1%<5(9 '$7( %<'(6&5,37,210XUUD\5RDG0LGGOH*URYH1<&RQWDFW0LNH0XQWHU,7 ,6 $ 9,2/$7,21 2) 1(: <25. 67$7( ('8&$7,21 /$: $57,&/(  )25 $1<3(5621 81/(66 7+(< $5( $&7,1* 81'(5 7+( ',5(&7,21 2) $ /,&(16('352)(66,21$/(1*,1((572$/7(57+,6'2&80(17,1$1<:$<,)$/7(5('7+($/7(5,1* (1*,1((5 6+$// $)),; 72 7+( '2&80(17 7+(,5 6($/ 7+( 127$7,21$/7(5('%<)2//2:('%<7+(,56,*1$785(7+('$7(2)68&+$/7(5$7,21$1'$63(&,),&'(6&5,37,212)7+($/7(5$7,21&23<5,*+7k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s$& =21( ,17* ,1'8675,$/*(1(5$/ 86( :$5(+286( (;,67,1* ,1'*6,7(0,1/276,=(  6)  6)0,1$9*:,'7+  )7 s )735,1&,3$/%/'*&29(5$*(   s $&&(6625<%/'*&29(5$*(    0,1)52176(7%$&.  )7 s )70,15($56(7%$&.  )7 s )70,16,'(6(7%$&. ($&+  )7 s )70,16,'(6(7%$&. 727$/  )7 s )735,1&,3$/0$;+(,*+7  )7  )7$&&(6625<7235,1&,3$/  )7 1$ )7$&&(6625<72)5217/,1(  )7 1$ )7$&&(6625<725($5/,1(  )7 1$ )7$&&(6625<726,'(/,1(  )7 1$ )70,1*5((163$&(   s 3$5.,1* :$5(+286( 5(48,5(' 63$&(3(5(03/2<((6$1'3(5&203$1<9(+,&/( (03  &203$1<9(+ 63$&(63529,'('63$&(6 ,1&/8',1*$'$ /27&29(5$*((;,67,1*352326('%8,/',1*6  6)  6)  3$9(0(176  6)  6)  *5((163$&(6)6)   6)  6)=21,1*0$3 s 86*648$' s               Attachmnt B  Site Driveway Traffic Counts    AgroChem Expansion  City of Saratoga Springs, New York        Project: 121‐028, AgroChem Expansion Observation by: MPF Date: 2/4/2021 Location: Freedom Way Driveways at Project Site AM Peak In Out In Out In Out 7:00:00 AM 101030 7:15:00 AM 200020 7:30:00 AM 400020 7:45:00 AM 40103124 In Out Total: 8:00:00 AM 0000412411 3 14 8:15:00 AM 10002124 8:30:00 AM 00102021 8:45:00 AM 10011015 Total 13031193 PM Peak In Out In Out In Out 4:00:00 PM 040003 4:15:00 PM 021001 4:30:00 PM 010113 4:45:00 PM 00010220 5:00:00 PM 01010116In Out Total: 5:15:00 PM 000200141 9 10 5:30:00 PM 10000211 5:45:00 PM 00010110 Total 1816113 1000 SF Existing SF: 33817 33.817 Proposed SF: 16050 16.05 Total SF: 49867 49.867 AM Existing Rate (trips/1000 SF): 0.414 PM Existing Rate (trips/1000 SF): 0.2957 AgroChem Peak 7:30‐8:30 AgroChem Peak 4‐5 Greenfield Mfg AgroChremPeroxyChem Greenfield Mfg PeroxyChem AgroChrem