Loading...
HomeMy WebLinkAbout20220918 142 East Avenue Garage application withdrawal request. 12/12/22, 1:25 PM Zimbra Zimbra aneisha.samuels@saratoga-springs.org Re - 142 East Avenue From : Sue Davis Mon, Dec 12, 2022 12:29 PM <sue@sdatelier.com> Subject : Re - 142 East Avenue To : aneisha samuels <aneisha.samuels@sa ratoga-springs.org> Cc : kjthayes@yahoo.com CAUTION: This email originated outside of the City network. Please contact IT Support if you need assistance determining if it's a threat before opening attachments or clicking any links. https://m.saratoga-springs.org/h/printmessage?id=26995&tz=America/New_York 1/4 12/12/22, 1:25 PM Zimbra Aneisha; The applicant has decided to comply with the side-yard setback requirements, so will not be seeking a side-yard variance. Regarding the percentage of lot coverage, (which I understand is not an issue due to the UDO requirements), the calculations are as follows: Existing House — 20% lot coverage (30% allowable) Proposed Garage — 10.5% lot coverage Total Proposed Lot Coverage — 30.5% Total Allowable Lot Coverage — 40% These percentages are indicated on Drawing SCH-S which was part of the original submission package. If there is no variance required for the lot coverage, then we will be withdrawing the application from tonight's meeting. Thank you. Sue Davis Principal Architect SD Atelier —Architecture, L.L.C. 511 Broadway, 2nd. flr. Saratoga Springs, NY 12866 518-587-3385 (cell) 518-321-4955 sue@sdatelier.com www.sdatelier.com Like us on Facebook! https:Ilwww.facebook.com/SDAtelierArchitecture https://m.saratoga-springs.org/h/printmessage?id=26995&tz=America/New_York 2/4 12/12/22, 1:25 PM Zimbra Follow us on lnstagram! https://www.instagram.com/sd.atelier.architectureL https://m.saratoga-springs.org/h/printmessage?id=26995&tz=America/New_York 3/4 12/12/22, 1:25 PM Zimbra https://m.saratoga-springs.org/h/printmessage?id=26995&tz=America/New_York 4/4