HomeMy WebLinkAbout20190500 Delarm Residence Pool info ENGINEERING AMERICA CO .
76 WASHINGTON ST . SARATOGA SPRINGS , NY 1 2 8 6 6
518 1 587 - 1340 518 / 580 - 9783 ( FAX )
TRANSMITTAL SHEET
TO: FROM:
Zoning Board of Appeals Tonya Yasenchak
COMPANY: DATE:
City of Saratoga Springs June 9,2019
FAX NUMBER: TOTAL NO.OF PAGES INCLUDING COVER:
2
PHONE NUMBER: SENDER'S REFERENCE NUMBER:
RE: YOUR REFERENCE NUMBER:
Delarm: 96 Quevic
Saratoga Springs,NY
0 URGENT Er FOR REVIEW 0 PLEASE COMMENT 0 PLEASE REPLY 0 AS REQUESTED
City of Saratoga Zoning Board Members,
The Planning Dept. has requested that Engineering America Co.review the coverage calculations
pool,concrete pool surround and wood deck surround at the Delarrn project site located at 96
Quevic Dr. We have rereviewed the coverages as outlined them below.
Area Calculations:
Total Lot Size: 15,528 sq.ft. (+/-)
Accessory Structure Coverage (with wood surround /without concrete surround):
Pool without any Surround: 570 sq.ft.
Wood decking at corners of concrete pool surround 400
(concrete portion of surround not included)
Shed: 343
Accessory Structure coverage w/o surround: 1,313 sq.ft. = 8.5% > 8.0%max. allowed
Accessory Structure Coverage (without wood surround /without concrete surround):
Pool without any Surround: 570 sq.ft.
Shed: 343
Accessory Structure coverage w/o surround: 913 sq.ft. = 5.9% < 8.0%max. allowed
** Please note that should the ZBA decide that the flush wood deck portion of the pool surround
is to be included in the Accessory Structure Coverage,a modification to the ZBA application is
herein made to request an area variance for overall coverage of total accessory structures foe 8.5%
coverage. The variance requested is 0.5%variance from the 8.0%max. coverage allowed(6.3%
variance).
Thank you forypui 1 - . d cooperation.
. „,.......—iiiip,
4.0011111f '
Sincerely,
Tonya Yasenchak,PE
2