HomeMy WebLinkAbout20221065 500 Union Longfellows Site Plan Cost EstimateCost Estimate for Letter of Credit Planning Board No.: xxxxxxxxx Project: 500 Union Avenue Location: 500 Union Avenue Saratoga Springs, NY Date: 11/18/2022 Firm Name & Preparer: The LA Group, Cameron Alber (Job # 2021075) On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Erosion Control (including silt fence & washout)1 LS $6,000.00 $6,000.00 0%$0.00 2 Site Preparation and Grading 1 LS $10,000.00 $10,000.00 0%$0.00 3 Rough Grading 1 LS $5,000.00 $5,000.00 0%$0.00 Hardscape 4 Asphalt pavement 12,522 SF $4.25 $53,218.50 0%$0.00 5 Gravel Path 2,004 SF $2.50 $5,010.00 0%$0.00 6 Concrete Walk 4,201 SF $5.50 $23,105.50 0%$0.00 7 Concrete Pavers 2,868 SF $7.00 $20,076.00 0%$0.00 8 Concrete Curb 247 LF $35.00 $8,645.00 0%$0.00 9 Granite Curb 189 LF $45.00 $8,505.00 0%$0.00 Site Amenities 10 Sign 5 EA $350.00 $1,750.00 0%$0.00 11 Stone Retaining Wall 1 LS $30,000.00 $30,000.00 0%$0.00 12 Wooded Pergola 1 LS $10,000.00 $10,000.00 0%$0.00 13 Striping 1 LS $800.00 $800.00 0%$0.00 14 Topsoil and Seed 1 LS $10,000.00 $10,000.00 0%$0.00 15 Concrete Stairs (With Handrail)1 LS $8,000.00 $8,000.00 0%$0.00 16 Fencing 104 LF $30.00 $3,120.00 0%$0.00 17 Paddock Fencing 420 LF $20.00 $8,400.00 0%$0.00 18 Site Lights 12 EA $1,700.00 $20,400.00 0%$0.00 19 Bollard Lights 12 EA $1,300.00 $15,600.00 0%$0.00 20 Landscaping 1 LS $5,000.00 $5,000.00 0%$0.00 Site Utilities 21 Drain Inlet 2 EA $2,500.00 $5,000.00 0%$0.00 22 Diversion Structure 1 EA $3,700.00 $3,700.00 0%$0.00 23 Yard Drains 2 EA $2,000.00 $4,000.00 0%$0.00 24 Underground Infiltration 1 LS $15,000.00 $15,000.00 0%$0.00 25 8" HDPE Storm Line 75 LF $28.00 $2,100.00 0%$0.00 26 12" HDPE Storm Line 129 LF $32.00 $4,128.00 0%$0.00 27 6" PVC Sanitary Line 50 LF $38.00 $1,900.00 0%$0.00 28 4" PVC Sanitary Line 22 LF $32.00 $704.00 0%$0.00 29 Grease Trap 1 EA $5,000.00 $5,000.00 0%$0.00 30 Gate Valve 1 EA $500.00 $500.00 0%$0.00 31 Water Service Line 16 LF $40.00 $640.00 0%$0.00 Total onsite Work $295,302.00 $0.00 Total onsite X.25 $73,825.50 $0.00 2022-11-18_LOC Page 1 of 2 Off Site (All infrastructure & amenities to be dedicated to the City) Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Item #Misc. As Built Drawings 1 LS $4,000.00 $4,000.00 0%$0.00 Total offsite Work $4,000.00 $0.00 Total On-Site Work X25%$73,825.50 Total Off-Site work $4,000.00 Total = $77,825.50 * New LOC Reduced Amount = XXXX LOC Amount = $78,000.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $19,500.00 (25% LOC Amount) 2022-11-18_LOC Page 2 of 2