HomeMy WebLinkAbout20221065 500 Union Longfellows Site Plan Water Sewer Engineering Report
Engineering Report
Water and Sanitary Sewer
For
500 Union Avenue
Saratoga Springs, New York
PB # 22.XXX
Prepared For:
500 Union Ave, LLC
Saratoga Springs, NY 12866
Prepared By:
The LA Group, P.C.
40 Long Alley
Saratoga Springs, New York 12866
November 18, 2022
500 Union Avenue
2021075
1
PROJECT DESCRIPTION
The 500 Union Avenue project is located at the restaurant and hotel commonly known as
Longfellow’s, at 500 Union Avenue, Saratoga Springs. There are two existing buildings on site
that are part of the project; the main restaurant building, and the hotel wing (to the west). The
project is proposing demolition of the restaurant portion of the main building, but to retain an
existing block of hotel rooms on the north side of this building. A new building is proposed in
the original restaurant building’s place that will connect to the existing block of hotel rooms, and
a bridge will be constructed over the drive between the main building and the standalone hotel
wing (to the west).
Separate from the construction of the new building, there are proposed renovations inside the
buildings, which will alter the uses on site. Table 1 below has been included below to summarize
the current and proposed uses on site. In general, there is a planned shift away from restaurant
dining as a primary use and shift towards more hotel rooms for patrons.
Table 1. Current and Proposed Uses at the 500 Union Avenue Project
Type of Use on Site
Currently Proposed
Main
Restaurant
Building
Hotel
Wing
Main
Restaurant
Building
Hotel
Wing
Hotel Rooms (no. of rooms) 18 32 54 34
Spa (max. no. of patrons) n/a 2 n/a 4
Restaurant (no. of seats) 214 0 91 0
Banquet Hall (no. of seats) 125 0 175 0
Meeting room (no. of seats) n/a 70 n/a 64
EXISTING CONDITIONS
Water Distribution – A City of Saratoga Springs 12” watermain is recorded to be on the east side
of Route 9P. An 8” water line services the site. The existing building is sprinklered.
Sanitary Sewer – An 8” PVC sanitary main services the property on the south side of the
property. This gravity collection system is maintained in cooperation with the neighboring HOA
and ultimately wastewater is conveyed to the Saratoga County Sewer District No. 1. From there
the wastewater is conveyed to the treatment plant in Mechanicville.
SEWER AND WATER USAGE
The table below provides information on the anticipated average potable water use and
wastewater flow rates for the project. Water use and wastewater flow are estimated to be equal
500 Union Avenue
2021075
2
for this study.
Table 2. Average Projected Daily Flows
Type of Use1 Quantity Average Daily Flow
(gpd)
Hotel (110 gpd/room) 88 9,680
Restaurant (35 gpd/seat) 91 3,185
Banquet Hall (10 gpd/seat) 175 1.750
Spa (10 gpd/patron) 4 40
Meeting Room (5 gpd/each) 64 320
Total 14,975
Since there is an existing restaurant and hotel on site, this project was evaluated based on the
proposed change in flows from the existing conditions. The existing condition flows were also
evaluated, refer to Attachment A for calculations.
The existing flows were estimated to be 14,610 gpd, therefore, the project is estimated to
increase flows by 365 gpd.
Summary of Design Flows
Average daily increase in flow for wastewater is estimated to be 0.3 gallons per minute (gpm)
based on an 18-hour day. Estimated increase in peak hourly flow is 0.7 gpm (2.25 x average).2
Average daily increase in demand for water is estimated to be approximately equal to the
wastewater flow or 0.3 gpm.
For the purposes of input into the City of Saratoga Springs water model, we offer the following
estimated increase in water demands for the project:
Average Day Demand is 0.3 gallons per minute (GPM) over the 18-hour period.
Max Day Demand is 0.6 gallons per minute (GPM) based on twice the average.
Peak Hourly Flow is 0.7 gallons per minute (GPM) based on 4.20 times the average.
Fire Flow Demand is 1,000 gallons per minute (GPM) per ISO guidelines.
PROPOSED CONDITIONS
Water Distribution – To service the project, the existing 8-inch water service to the site will
continue to be utilized.
The minimum needed fire flow (NFF) is 1,000 gallons per minute at 20 psi for a duration of two
hours according to the Insurance Services Office Guide for Determination of Needed Fire Flow
500 Union Avenue
2021075
3
for residential occupancies protected by an automatic fire sprinkler system. The existing
building is sprinklered and the proposed building will also be sprinklered. The building height is
planned to remain unchanged and the sprinklers should continue to operate as designed.
Connections and appurtenances, including tapping sleeves, mechanical joints, tees, isolation
valves, thrust blocks, trenching, bedding, as well as testing and disinfection will all be specified
in accordance with City of Saratoga Springs standards.
Sanitary Sewer – Existing sanitary sewer services will be reused for the project. The project is
proposing the replacement of existing grease trap on site. The project is proposing the use of a
Schier Model GB-250 grease trap to manage fats, oil and grease on site. Sizing criteria is
provided in Attachment A to this report.
All sanitary sewer mains, laterals, manholes and manhole connections will be furnished, installed
and tested according to Saratoga County Sewer District standards.
1. From Table B-3, NYSDEC Design Standards for Intermediate Sized Wastewater Treatment Systems,
dated March 5, 2014
2. Civil Engineering Reference Manual, 15th Edition, Table 28.1 "Typical Variations in Wastewater
Flows"
ATTACHMENT A
WATER AND SEWER DESIGN CALCULATIONS
500 Union Avenue
SARATOGA SPRINGS, NEW YORK
DETERMINE DAILY AVERAGE AND PEAK HOURLY FLOWS
MAIN RESTAURANT BUILDING
ESTIMATE MAXIMUM DAILY USAGE:
HOTEL ROOMS EXISTING PROPOSED
NO. OF BEDROOMS 18 EA 54 EA
DESIGN FLOW =110 GPD/EA 110 GPD/EA
Qa = 1,980 GPD 5,940 GPD
RESTAURANT
PER SEAT 214 EA 91 EA
DESIGN FLOW =35 GPD/EA 35 GPD/EA
Qb = 7,490 GPD 3,185 GPD
BANQUET HALL
PER SEAT 125 175 EA
DESIGN FLOW =10 GPD/EA 10 GPD/EA
Qc = 1,250 GPD 1,750 GPD
Total (QT)10,720 GPD 10,875 GPD
CALCULATIONS FOR SANITARY SEWAGE CAPACITY
All usages calcuations based off of NYSDEC, Design Standards for Intermediate
Sized Wastewater Treatment Systems, Typical Per-Unit Hydraulic Loading Rates
1 ATTACHMENT B
SARATOGA HOTEL SPA
SARATOGA SPRINGS, NEW YORK
HOTEL WING
ESTIMATE MAXIMUM DAILY USAGE:
HOTEL ROOMS EXISTING PROPOSED
NO. OF BEDROOMS 32 EA 34 EA
DESIGN FLOW =110 GPD/EA 110 GPD/EA
Qa' = 3,520 GPD 3,740 GPD
SPA
PER PATRON*2 4 EA
DESIGN FLOW =10 GPD/EA 10 GPD/EA
Qb' = 20 GPD 40 GPD
*SPA DESIGN FLOW BASED ON BATHHOUSE
MEETING ROOM
PER SEAT (ASSEMBLY HALL) 70 EA 64 EA
DESIGN FLOW =5 GPD/EA 5 GPD/EA
Qc' = 350 GPD 320 GPD
Total (QT')3,890 GPD 4,100 GPD
CHANGE IN FLOW
MAIN RESTAURANT BUILDING 155 GPD
HOTEL WING 210 GPD
TOTAL INCREASE IN FLOW 365 GPD
MAX. DAILY FLOW, Q =365 GPD (CHANGE IN QT + QT')
AVG. DAILY FLOW, Qav =0.3 GPM
PEAKING FACTOR, Qp/Qav 2.25 **
PEAK HOURLY FLOW, Qp =0.7 GPM
**Civil Engineering Reference Manual, 15th Edition, Table 28.1 "Typical Variations
in Wastewater Flows"
2 ATTACHMENT B
GREASE INTERCEPTOR CALCULATIONS
Reference No. N/A Project Name: Ballpark Sizing
Step 1: Flow rate to grease interceptor
Fixture flow rate: (cu in / 231) = gal x 0.75 / min = min flow rate
Flow rate used to size interceptor (less of fixture or pipe size)
Pipe size (6 in):
Pipe Size flow rate per Manning's Formula 200 GPM
Step 2: Grease Production
Number of Seats x 4 turns per seat x Grease Production Value x Days between pump-out = Grease output
Number of seats in facility: 70
Grease production value: 0.0455 lbs per serving (Family Restaurant: High / Flatware)
Days between pump-outs: 90 days
70 x 4 x 0.0455 x 90 = 1146.6 lbs of FOG
SCHIER MODEL
GB-250
Description: Polyethylene Grease Interceptor
Dimensions: Length: 87", Width: 33", Height: 44"
Flow Rates/Grease Capacities: 200 GPM / 1196.0 lbs
Liquid Capacity: 275 gal
Buyer beware:
Ballpark Sizing is intended to provide a reasonably accurate recommendation when complete restaurant information is not
available. For a more accurate sizing recommendation, complete a Pinpoint Sizing by logging into Grease Monkey.