Loading...
HomeMy WebLinkAbout20190313 Skidmore Swing Building NOD k TOGA, MARK TORPEY, Chair CITY OF SARATOGA SPRINGS irotJAMIN TOTING, Vice Chair ri,' r PLANNING BOARD ROBERT F. BRISTOL _ M • JANET CASEY ; mo4 ' City Hall - 4 74 B Broadway TODD FABOZZI . Saratoga Springs, New York 1 2866 RUTH HORTON 'ORATE Tel: 518-587-3550 fax: 518-580-9480 SARA BOIVIN NOTICE OF DECISION In the matter of the application - #20190313 Skidmore College 81 5 North Broadway Saratoga Springs, NY 12 866 Involving the premises with tax parcel #152.-1 -3, in the City of Saratoga Springs, on an application for site plan for a new education support building in the INST-ED District. In accordance with 6 NYCRR Part 61 7, the Planning Board classified this request as an Unlisted Action. Issued a Negative SEQRA Declaration And, in accordance with objectives, standards and guidelines contained in the City Zoning Ordinance, chapter 240, article 7.2 "Site Plan Review", the Planning Board issues the following decision on June 6, 2019 (passed 4-0-3(recusals) in favor: Torpey, Bristol, Horton, Boivin): Approve with the following conditions: 1 . Sidewalk connection to be made from North Broadway to the Perimeter Road to connect with existing gravel path if connection not made with current Skidmore entrance project. 2. Low-level lighting to be installed at rear of building (facing North Broadway). 3. Final plans shall be provided to the satisfaction of the City's designated engineer and DPW. The applicant is required to: Page 1 of 2 1 . Deliver a letter of credit or cash escrow in the amount approved by the City Engineer to the City per Article 7.2.1 5 of the City of Saratoga Springs Zoning Ordinance. This must occur prior to final signature by the Planning Board Chair. 2. Submit one (1) mylar and two (2) paper copies of the final approved site plans for signature by the Planning Board Chair within eighteen (18) months of approval as per Article 7.2.12 of the Zoning Ordinance. Note: this approval shall expire within eighteen (18) months of the signature of final plans if the applicant has not started actual construction as per Article 7.2.14 of the Zoning Ordinance. --7/((aZ1/‹. June 1 7, 2019 Date Chair cc: Building Dept., Public Works, Public Safety, Accounts Dept., Applicant/Agent; File