Loading...
HomeMy WebLinkAbout20200735 Excelsior Ave. Apartments Site Plan NOD � �'����a���Y� � ' C ITY O F SARATOGA S P RI N GS MARK TORPEY, Chair .�.�;.,.. ��� ��- �, �� � ;.. �� M A R K P I N G E L, Vi ce C hair � ������ ��� ��� PLANNING BOARD TODD FABOZZI � ti - .�� `. �� ���' KE RRY MAYO � � �-='� ':' � �.� �'� - � CHUCK MARSHALL � �� - City HaII -474 Broadway �� ���� BILL MCTYGUE � �}f3T�' �r��'�, ,�r . ��. ..�,�_�,�k Saratoga Springs, New York I 2866 SHAWNA JENKS,Alternate , .. �i Tel:5 I 8-587-3550 fax:5 I 8-580-9480 ��� � �. ����������-� � www.saratoga-springs.org NOTICE OF DECISION In the matter of the application #20200735 Excelsior Avenue Apartments Excelsior Avenue Saratoga Springs, NY I 2866 WH EREAS, Beacon Communities, LLC (Applicant) made a Site Plan Application concerning property located on Excelsior Avenue in the Excelsior Park Project within the City of Saratoga Springs seeking to pursue construction of its Excelsior Apartments Project ("Project"); and WH EREAS, the Project is part of the Excelsior Park Project, a mixed-use development in the City of Saratoga Springs ("City")which was the subject of a special use permit application made on September I 9, 200 I by Excelsior Park, LLC; and WH EREAS, pursuant to the State Environmental Quality Review Act ("SEQRA"), the Planning Board identified the project as a Type I Action under SEQRA, declared itself Lead Agency and conducted coordinated review pursuant to SEQRA; and WHEREAS, after analyzing all potential environmental impacts, the Planning Board adopted a Positive Declaration which resulted in the preparation of a Draft Environmental Impact Statement; and WHEREAS, the Planning Board's SEQRA Review culminated in adoption of a Final Environmental Impact Statement and Statement of Findings on October I 6, 2002; and WH EREAS, Excelsior Park, LLC submitted a new special use permit application on November I 8, 20 I 7, seeking to increase development parameters; and WHEREAS, between February 20 I 8 and April 202 I, the Planning Board, again serving as Lead Agency, conducted numerous public hearings, received and reviewed updated SEQRA materials from Excelsior Park, LLC, engaged a third- party designated environmental and engineering consultant to review the updated technical and environmental materials, Page I of 5 reviewed and commented on various submissions and environmental studies (including an updated traffic impact study by GPI Engineering), and received and reviewed public comments on the application and the updated SEQRA record; and WHEREAS, following this extensive review, the Planning Board issued an Amended Statement of Findings pursuant to SEQRA on April 26, 2021 ("Amended Statement of Findings"), determining that a Supplemental Environmental Impact Statement would not be required, and granted the special use permit application on May I 3, 202 I ("202 I Special Use Permit") which authorized a total of I 79 residential units and 147,600 square feet of non-residential use, as an addition to what had already been constructed; and WH EREAS, the Applicant now seeks to develop the Project as part of the latest phase of the overall Excelsior Park development project; and WHEREAS, as originally proposed, this Project consisted of a mixed-use building fronting on Excelsior Avenue with commercial space on the first floor for a daycare facility and 48 one-, two-, and three-bedroom apartments on the remaining three floors; ten, three-bedroom townhouses fronting on Whistler Court; a two-lot subdivision; and a satellite parking area; and WHEREAS, based on the public's concerns raised before the Planning Board, the Applicant modified the Project to eliminate the two buildings which were proposed to house the ten townhouses on Whistler Court; removed the daycare facility in the mixed-use building on Excelsior Avenue; adjusted the apartment bedroom sizes to allow for a total of 52 apartment units without changing the building size or footprint; and eliminated the satellite parking area; and WHEREAS, as a result of these project modifications, the Applicant submitted the pending Site Plan Application on January 3 I, 2022 and submitted a subdivision application on February 24, 2022, which was granted by the Planning Board on June 23, 2022; and WHEREAS, at this Board's June 23, 2022 and September 29, 2022 meetings, the Applicant presented the updated Project design and,while no Public Hearing is mandated, the Planning Board received comments from the public including concerning the current conditions in the neighborhood concerning the width and sufficiency of the access road, sufficiency of on-street parking and general dissatisfaction concerning possible future inhabitance of the proposed apartments including units to be made available to domestic abuse survivors through the Wellspring organization; and WH EREAS, the Planning Board referred this Application to the Saratoga County Planning Board and received a recommendation dated June 23, 202 I that the Project will have no County-wide impact or intercommunity impacts; and WHEREAS, despite adoption of the City's Uniform Development Ordinance, the previous Zoning Ordinance still applies to this Application and, the Planning Board reviewed the Site Plan Application pursuant to the evaluation criteria set forth in Article 7 of the City Zoning Ordinance; and WHEREAS, the Applicant has provided a Stormwater Pollution Prevention Plan ("SWPPP") and drainage designs demonstrating that the Project meets the most recent New York State Department of Environmental Conservation guidelines; and WHEREAS, the Planning Board has considered the 2020 Traffic Impact Study performed by GPI which included certain mitigation to offset traffic-related impacts including extension of the westbound left turn lane from I 00 feet to 325 feet of storage length along Route 50, construction of a northbound right turn lane I 00 feet in length on Veteran's Way to provide for turning onto Route 50 and optimizing signal timing for the new lane geometry; and WH EREAS, the Planning Board has received guidance from the City Designated Engineers, Department of Public Works, Saratoga Springs Fire Department, Saratoga Springs Police Department and Department of Public Safety; and WH EREAS, the Planning Board has received comments from the public concerning road width and access-related issues along the boulevard entrance; and WH EREAS, the Planning Board has also received comments from the public concerning the proposed inhabitance of the residential units to be constructed in the multi-use building; and WH EREAS, the Planning Board has considered all comments and materials submitted in relation to this Project and all materials related to the 20 I 7 special use permit application and SEQRA Review Record; and WH EREAS, the Planning Board has received, reviewed, and considered the Site Plan Application, the presentations by the Applicant, and the comments submitted by the public. NOW, THEREFORE, BE IT RESOLVED that the City of Saratoga Springs Planning Board hereby makes the following findings: I. The proposed Site Plan comports with the Excelsior Park SEQRA Amended Findings Statement adopted by this Board on April 8, 202 I, including all thresholds, limitations and mitigation measures set forth therein and that no new or different impacts will result which have not already been identified, analyzed and addressed during the previous SEQRA Review process. 2. The proposed Site Plan comports to the evaluation criteria set forth in Section 7.2.4 of the City Zoning Law: a. The location, arrangement, size, design, and general site compatibility of the Project are satisfactory, particularly given the modification of the Project by the Applicant following receipt of public comments regarding density of development as well as parking and traffic issues. b. Vehicular traffic access and circulation at the Project site are adequate, except where stated otherwise below. While public comments were received concerning the width and sufficiency of emergency access, this Board also received comments from the City Fire Department that the Site Plan causes no issues. In addition, Board Members have individually visited the site and have not witnessed the conditions complained of. However, in an urban environment, sometimes stopped or standing vehicles temporarily impact two-way traffic, requiring drivers to "take turns". This is not viewed as a condition which should prevent project advancement. In addition, modifications to the Project design have been made to address these concerns to the greatest extent practicable. While the Applicant has demonstrated that it is providing a sufficient number of parking spaces for its residents, the Board is concerned that by charging residents a separate and voluntary fee for parking, those residents may opt to park on the street which would either cause or unreasonably exacerbate on-street parking issues. This concern is consistent with the comment raised by the City Police Department. In addition, based upon the 2020 Traffic Impact Study performed by GPI, the Project will have avoidable and undesirable impacts upon the intersection of Route 50 and Veteran's Way/Gick Road. Absent mitigation, the circumstances noted in the Traffic Impact Study would render vehicular access inadequate. With appropriate conditions imposed by this Resolution,vehicular traffic access and circulation at the Project site are adequate. c. The Applicant has demonstrated that off-street parking and loading at the Project is sufficient, and there has been no reliable demonstration to the contrary. d. Pedestrian traffic access and circulation at the Project is more than adequate as the Project design will ensure walking paths. Sidewalks are available for pedestrian access and the Spring Run Trail will not be negatively impacted by the Project. In addition, the Downtown Connector, which is part of the larger Saratoga Greenbelt network, will soon be accessible and will provide greater pedestrian access to and from this development. e. The stormwater and drainage facilities at the Project are adequate based upon drainage design and the Stormwater Pollution Prevention Plan submitted in reference to this Project. It is noted that the Project will not encroach into jurisdictional wetlands or wetland buffers. f. Water supply and sanitary sewer/sewerage disposal facilities at the Project site are adequate. It is noted that the Project's estimated water consumption is within the maximum water consumption anticipated as set forth in the Amended Statement of Findings. g. The arrangement and adequacy of onsite and offsite lighting at the Project is sufficient. The Applicant has demonstrated that the Project will utilize LED lighting throughout the property with vacancy sensors and daylight timers. h. Landscaping and screening of parking areas at the Project will be adequate as the Project design includes ample green space, including landscaping around the proposed building and parking area, and the Project design will maintain the I 00-foot vegetative Northway buffer. i. Access to the Project site and other fire safety facilities for emergency vehicles is adequate. The Planning Board has taken into consideration the opinions of the City's Fire Chief, Police Department and Commissioner of Public Works. While public comments have centered around the boulevard entrance being the sole point of access and incidents in which access was limited due to lane obstruction, denial of the Application on this ground is not warranted. The Planning Board notes receipt of the Memorandum of the Commissioner of Public Works dated September 2, 202 I in which it is recommended that Planning Board Members visit the site, consider the one-access point issue, current conditions related to parking and traffic and suggests that development should proceed in accordance with a holistic approach. Planning Board Members have visited the site, have considered the point of access issue, have considered current parking needs/conditions and current traffic conditions. In addition, the Project is part of a larger, multi-year review effort and is therefore part of a detailed and thorough holistic approach to development. However, the Planning Board finds that it should not be the Applicant's obligation to address current conditions which are not being unreasonably intensified by the Project and which do not exceed any threshold established during SEQRA Review. While severe storms may very well slow emergency response times, this is the case throughout the City and is likewise the case in this specific area whether or not this Project advances. Based on all facts and circumstances specific to this Application and the larger Excelsior Park development and all related Planning Board considerations, findings and actions, the Planning Board hereby finds that access to the Project and access by emergency vehicles is adequate and further finds that it would not be appropriate to deny this Application based solely on the current road configuration over which the Applicant has no control. j. While the UDO does not apply to this Project, the Project nonetheless satisfies the evaluation criteria set forth in Article I 3 of the UDO; and be it further RESOLVED, that Site Plan 20220735 for the Excelsior Apartments Project is hereby approved subject to the following conditions: I. That the final Site Plan be modified to add the following: "On October 27, 2022, the City of Saratoga Springs Planning Board determined that these plans conform to the SEQRA Amended Findings Statement adopted by the Board on April 8, 202 I." 2. That the Applicant not charge a separate and/or voluntary fee of its residents for on-site parking. 3. That the Applicant extend the westbound left-turn lane on Route 50 at Veteran's Way from I 00 feet to 325 feet prior to issuance of any Certificate of Occupancy or Certificate of Compliance being issued. 4. That the Applicant construct a northbound right-turn lane on Veteran's Way at Route 50 prior to any Certificate of Occupancy of Certificate of Compliance being issued. 5. That the Applicant optimize signal timing for the new lane geometry. 6. That the Project meet NYSERDA new construction standards and Enterprise Green Community standards for energy efficiency. The Applicant is to copy the City Office of Planning & Economic Development on all related application submissions to NYSERDA. The foregoing Resolution was Adopted October 27, 2022 by the Planning Board of the City of Saratoga Springs by a 4-I vote (ayes: Torpey, Pingel, Fabozzi, Marshall; nay: McTygue). The applicant is required to: I. Provide documentation of conformance with all required conditions of approval. 2. Deliver a letter of credit or cash escrow in the amount approved by DPW to the City per Article 7.2.I 5 of the Zoning Ordinance. This must occur prior to final signature by the Planning Board Chair. 3. Submit one (I) mylar and two (2) paper copies of the final approved site plans for signature by the Planning Board Chair within ei�hteen (I 8) months of approval as per Article 7.2.I 2 of the Zoning Ordinance. Note: this approval shall expire within eighteen (I 8) months of the signature of final plans if the applicant has not started actual construction as per Article 7.2.I 4 of the Zoning Ordinance. October 3 I, 2022 � � Date filed with Accounts Dept. Chair