Loading...
HomeMy WebLinkAbout20220827 Richard Ave Subdivision Submittal Checklist 221006 CITY OF SARATOGA SPRINGS PLANNING BOARD . CITY HALL-474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 `- www.sat-atoga-spnngs.org PRELIMINARY/ FINAL SUBDIVISION APPROVAL REQUIRED SUBMITTAL CHECKLIST Checklist Prepared By: Advance Engineering &Surveying, PLLC Date: 08/08/22 Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs' Subdivision Regulations. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: b" R s ALL Vi teri CHECK EACH ITEM 1. Completed Subdivision Application 1 a. Conservation Subdivision Checklist if required 2. SEQR Environmental Assessment Form-short or long form as required by action. 3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than I =50 feet). One digital version (PDF) of all submittal items printable to scale 4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary ✓ 7. Complete Streets Checl<list 8. Project Cost Estimate for Letter of Credit (utilize City template) REQUIRED ITEMS ON SUBDIVISION PLAT, AS APPLICABLE: 1. Name of Subdivision 2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey with all corners set and marl<ed on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. 3. North arrow and map scale City of Saratoga Springs Subdivision Checklist 1 4. Location of proposed home on each lot including finish floor elevation to nearest tenth foot. 5. Parcel tax map number 6. Site location map (with title block and snap key) 7. Site vicinity map (all features within 300 feet of property) 8. Identification of current zoning district with corresponding area and bulk requirements 9. Building setback lines, either listed or shown on plans 10. Title block with subdivision name; name and address of applicant; and name and address of property owner (if different) I 1. Name, address and phone number of subdivision surveyor and/or engineer 12. Names of all adjacent property owners within 300 feet (include both sides of street) 13. Identification of size, material,elevations, and slopes of all existing and proposed utilities within 400 ft of site. 14. Parcel street address (existing and any proposed postal addresses) 15. Incorporate the City's standard engineering details. Yes No N/A 16. Identification of existing or proposed easements, covenants or legal rights-of-way on this property 17. References to all prior variances or special use permits 18. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary ❑ ❑ 19. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains, rock outcroppings, etc. ❑ ❑ 20. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition) ❑ ❑ 21. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) 22. Location and distance to fire hydrant 23. Erosion and sediment control plan —including designated concrete truck washout area 24. Approximate location, dimensions and areas for proposed lots and proposed public recreational land 25. Proposal for utility systems and lateral connections 26. Location and width of proposed streets City of Saratoga Springs Subdivision Checldist 2 2021 LAND USE BOARD FEE WORKSHEET OPED Fees Type 2021 Fee Application to Zoning Board of Appeals[1][2] TOTAL #VARIANCE Use Vari ance $1100+$50/app Area Variance-Residential $275/var+$50/app+$125 each add'I variance Area Variance-Multi-Family,Comm,Mixed-Use $660/var+$50/app+$200 each add'I variance Interpretations $550+$50/app Post-Work Application Fee Add 50%App fee+$50/app Variance extensions 50%ofAppfee+$50/app Application to Design Review Commission[1] TOTAL #STRUCTURE Demolition $385 Residential Structures Principal $55 Accessory $55 Extension $35 Modification $55 Multi-Family,Comm,Mixed-Use Structures Sketch $165 Principal $550 Extension $200 Modification $330 Multi-Family,Comm,Mixed-Use Accessory,Signs,Awnings Principal $140 Extension $75 Modification $140 Post-Work Application Fee Add 50%App fee Application to Planning Board[1] TOTAL #STRUCTURE Special Use Permit[2] $990+$50/app Special Use Permit-extension $330 Special Use Permit-modification[2] $450+$50/app Site Plan Review-incl.PUD: Sketch Plan $330 Residential $330+$200/unit Residential-extension $200 Residential-modification $400 Non-residential $660+$130/1000sf Non-Residential-extension $300 Non-Residential-modification $650 Subdivision-incl.PUD: TOTAL #LOTS Sketch Plan $330 Preliminary Approval[2] Residential:1-5 lots 2030 3 $660+$50/app Residential:6-10 lots $990+$50/app Residential:11-20 lots $1320+$50/app Residential:21+lots $1650+50/app Residential-extension $330 Final Approval[2] Residential $1320+$175/lot+$50/app Non-Residential $2000/lotA-$50/app Final Approval Modification[2) Residential $330+$50/app Non-Residential $550+$50/app Final Approval Extension Residential $135 Non-Residential $330 Other: TOTAL #LOT/ACRE Post-Work Application Fee Add 50%App fee Lot Line Adjustment $350 Letter of Credit-modification or extension $440 Letter of Credit-collection upto 1%ofLoC Recreation Fee $2000/lotorunit Land Disturbance $660+$55/acre SEQRA EIS Review(Draft&Final) TBD Legal Noticing if PB requires Public Hearing $50/app [1] Fees are based on per structure,except where noted. $2,030.00 TOTAL DUE [2] Legal ad required;includes City processing and publishing For Administrative Use Total Paid at Intake Revised Fee Balance Due ___J�_Balance Paid Staff approval