HomeMy WebLinkAbout20220873 PDT Market UPDATED DRC APPSCOPE DOCUMENT: THIS PRELIMINARY DRAWING INDICATES THE GENERAL SCOPE OF THE PROJECT IN TERMS OF DESIGN CONCEPT. AS SCOPE DOCUMENTS THE DRAWINGS DO NOT NECESSARILY DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIRMENTS OF THE CONTRACT DOCUMENTS. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. DECISIONS OF THE DESIGNER AS TO THE ITEMS OF WORK INCLUDED WITHIN THE SCOPE OF THIS DOCUMENT SHALL BE FINAL AND BINDING ON THE CONTRACTOR AND THE OWNER. DESIGNER IS NOT AN ENGINEER OR ARCHITECT. DESIGNER CANNOT BE RESPONSIBLE FOR PLANS, SPECIFICATIONS OR OTHER INSTRUMENTS IN ORDER TO SECURE BUILDING PERMITS OR OTHER APPROVALS. CLIENT IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS38 LEFFERTS STREETSARATOGA SPRINGS NY 12866PROJECT ADDRESS:PDT55 RAIL ROAD PLACESARATOGA SPRINGS, NY 12866DRAWING TITLE:ISSUE DATE:NAME OF CONTRACTORBONACIO CONSTRUCTION INC.Sept. 30th, 2022PERMIT SETNO.REVISIONDATE0PERMIT SET08/18/2022EXTERIOR ELEVATIONSK01ASCALE:SCALE:SCALE:SCALE:1/16" = 1'1/16" = 1'1/16" = 1'1/16" = 1'----0"0"0"0"1111EXISTING OVERALL ELEVATIONEXISTING OVERALL ELEVATIONEXISTING OVERALL ELEVATIONEXISTING OVERALL ELEVATIONSCALE:SCALE:SCALE:SCALE:1/4" = 1'1/4" = 1'1/4" = 1'1/4" = 1'----0"0"0"0"2222ENLARGED EXISTING CONDITIONSENLARGED EXISTING CONDITIONSENLARGED EXISTING CONDITIONSENLARGED EXISTING CONDITIONSSCALE:SCALE:SCALE:SCALE:1/4" = 1'1/4" = 1'1/4" = 1'1/4" = 1'----0"0"0"0"3333EXISTING CONDITIONS IMAGESEXISTING CONDITIONS IMAGESEXISTING CONDITIONS IMAGESEXISTING CONDITIONS IMAGES
SK02A2SK02A2EXISTING DECORATIVE STEEL COL.NEW AUTOMATIC SLIDING DOOR.NEW STUCCO FINISH.NEW AUTOMATIC SLIDING DOOR.NEW STUCCO FINISH.EXISTING AUTOMATIC SLIDING DOOR.EXISTING VERTICAL AND HORIZONTAL MULLIONS TO BE PAINTED WHITE.EXISTING VERTICAL AND HORIZONTAL MULLIONS TO BE PAINTED WHITE.SCOPE DOCUMENT: THIS PRELIMINARY DRAWING INDICATES THE GENERAL SCOPE OF THE PROJECT IN TERMS OF DESIGN CONCEPT. AS SCOPE DOCUMENTS THE DRAWINGS DO NOT NECESSARILY DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIRMENTS OF THE CONTRACT DOCUMENTS. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. DECISIONS OF THE DESIGNER AS TO THE ITEMS OF WORK INCLUDED WITHIN THE SCOPE OF THIS DOCUMENT SHALL BE FINAL AND BINDING ON THE CONTRACTOR AND THE OWNER. DESIGNER IS NOT AN ENGINEER OR ARCHITECT. DESIGNER CANNOT BE RESPONSIBLE FOR PLANS, SPECIFICATIONS OR OTHER INSTRUMENTS IN ORDER TO SECURE BUILDING PERMITS OR OTHER APPROVALS. CLIENT IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS38 LEFFERTS STREETSARATOGA SPRINGS NY 12866PROJECT ADDRESS:PDT55 RAIL ROAD PLACESARATOGA SPRINGS, NY 12866DRAWING TITLE:ISSUE DATE:NAME OF CONTRACTORBONACIO CONSTRUCTION INC.Sept. 30th, 2022PERMIT SETNO.REVISIONDATE0 PERMIT SET08/18/2022PROPOSED EXTERIORSTUCCO ELEVATIONSK02ASCALE:SCALE:SCALE:SCALE:1/16" = 1'1/16" = 1'1/16" = 1'1/16" = 1'----0"0"0"0"1111OVERALL PROPOSED STUCCO ELEV.OVERALL PROPOSED STUCCO ELEV.OVERALL PROPOSED STUCCO ELEV.OVERALL PROPOSED STUCCO ELEV.SCALE:SCALE:SCALE:SCALE:1/4" = 1'1/4" = 1'1/4" = 1'1/4" = 1'----0"0"0"0"2222PROPSED STUCCO ELEV.PROPSED STUCCO ELEV.PROPSED STUCCO ELEV.PROPSED STUCCO ELEV.SCALE:SCALE:SCALE:SCALE:12" = 1'12" = 1'12" = 1'12" = 1'----0"0"0"0"3333INSPIRATION STUCCO IMAGESINSPIRATION STUCCO IMAGESINSPIRATION STUCCO IMAGESINSPIRATION STUCCO IMAGES
CONTINUOUS BREAKFORM SILL PAN FLASHING MIN 4" UP WALL. PAINTED TO MATCH STUCCO.CONTINUOUS BREAKFORM FLASHING MIN 4" UP WALL. PAINTED TO MATCH STUCCO. HEMMED EDGES, TYP.1/4"MIN.1"5/8" GYP. BRD.6" STUDS @ 16" O.C.R-19.2 BATT INSUL.SK03A2STO COMPOSITION:STO COMPOSITION:STO COMPOSITION:STO COMPOSITION:1 -STOGUARD AIR & WATER-RESISTIVE BARRIER.2 -CONT. WEATHER BARRIER MIN. R-4.1 3 -SELF-FURRED GALV. STEEL DIAMOND MESH LATH.4 -ASTM C926 COMPLIANT STUCCO SCRATCH COAT (AS MANUFACTURED OR LISTED BY STO CORP.)5 -ASTM C926 COMPLIANT STUCCO BROWN COAT (AS MANUFACTURED OR LISTED BY STO CORP.)6 -STO PRIMER.7 -SELECTED STO FIN.5/8" GYP. BRD.R-19.2 BATT INSUL.6" METAL STUDS @ 16" O.C.5/8" GYP. BRD.R-19.2 BATT INSUL.6" TOP & BOTTOM RUNNERS.6" TOP & BOTTOM RUNNERS.EXISTING CONDITION. V.I.F.FLOOR DTL.FLOOR DTL.FLOOR DTL.FLOOR DTL.WALL DTL.WALL DTL.WALL DTL.WALL DTL.TOP DTL.TOP DTL.TOP DTL.TOP DTL.5/8" GYP. BRD.R-19.2 BATT INSUL.INSPIRATION IMAGE FOR PDT MARKET SIGNAGE. METAL LETTERS, BACK LIT ‘HALO’ ILLUMINATION.INSPIRATION IMAGE FOR PDT MARKET SIGNAGE. METAL LETTERS, BACK LIT ‘HALO’ ILLUMINATION.INSPIRATION IMAGE FOR PDT MARKET SIGNAGE. METAL LETTERS, BACK LIT ‘HALO’ ILLUMINATION.INSPIRATION IMAGE FOR PDT MARKET SIGNAGE. METAL LETTERS, BACK LIT ‘HALO’ ILLUMINATION.EXISTING DECORATIVE STEEL COL. 6' - 9" 6' - 9" 5' - 2 " 1' - 4" 8"4' - 2 3/8"5' - 7 3/4"TYP. 5 1/2"1' - 6"ARCHED SIGNAGE TO REMAIN. BACKGROUND WILL BE CHANGED FROM BLACK TO WHITE. NEW WORDS ON SIGNS. LETTERS TO REMAIN SAME SIZE AND TO BE PAINTED BLACK.SCOPE DOCUMENT: THIS PRELIMINARY DRAWING INDICATES THE GENERAL SCOPE OF THE PROJECT IN TERMS OF DESIGN CONCEPT. AS SCOPE DOCUMENTS THE DRAWINGS DO NOT NECESSARILY DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIRMENTS OF THE CONTRACT DOCUMENTS. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. DECISIONS OF THE DESIGNER AS TO THE ITEMS OF WORK INCLUDED WITHIN THE SCOPE OF THIS DOCUMENT SHALL BE FINAL AND BINDING ON THE CONTRACTOR AND THE OWNER. DESIGNER IS NOT AN ENGINEER OR ARCHITECT. DESIGNER CANNOT BE RESPONSIBLE FOR PLANS, SPECIFICATIONS OR OTHER INSTRUMENTS IN ORDER TO SECURE BUILDING PERMITS OR OTHER APPROVALS. CLIENT IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS38 LEFFERTS STREETSARATOGA SPRINGS NY 12866PROJECT ADDRESS:PDT55 RAIL ROAD PLACESARATOGA SPRINGS, NY 12866DRAWING TITLE:ISSUE DATE:NAME OF CONTRACTORBONACIO CONSTRUCTION INC.Sept. 30th, 2022PERMIT SETNO.REVISIONDATE0 PERMIT SET08/18/2022EXTERIOR DETAILSSK03ASCALE:SCALE:SCALE:SCALE:6" = 1'6" = 1'6" = 1'6" = 1'----0"0"0"0"2222SILL PAN DTL.SILL PAN DTL.SILL PAN DTL.SILL PAN DTL.SCALE:SCALE:SCALE:SCALE:3" = 1'3" = 1'3" = 1'3" = 1'----0"0"0"0"1111STUCCO DETAIL "1"STUCCO DETAIL "1"STUCCO DETAIL "1"STUCCO DETAIL "1"SCALE:SCALE:SCALE:SCALE:1/4" = 1'1/4" = 1'1/4" = 1'1/4" = 1'----0"0"0"0"6666SIGN INSPIRATION IMAGESSIGN INSPIRATION IMAGESSIGN INSPIRATION IMAGESSIGN INSPIRATION IMAGESSCALE:SCALE:SCALE:SCALE:1/2" = 1'1/2" = 1'1/2" = 1'1/2" = 1'----0"0"0"0"5555ENLARGED PROPSED STUCCO ELEV.ENLARGED PROPSED STUCCO ELEV.ENLARGED PROPSED STUCCO ELEV.ENLARGED PROPSED STUCCO ELEV.SCALE:SCALE:SCALE:SCALE:12" = 1'12" = 1'12" = 1'12" = 1'----0"0"0"0"4444PAINTED SIGNAGE ON STUCCOPAINTED SIGNAGE ON STUCCOPAINTED SIGNAGE ON STUCCOPAINTED SIGNAGE ON STUCCOSCALE:SCALE:SCALE:SCALE:12" = 1'12" = 1'12" = 1'12" = 1'----0"0"0"0"3333EXISTING ARCH SIGNAGEEXISTING ARCH SIGNAGEEXISTING ARCH SIGNAGEEXISTING ARCH SIGNAGE