Loading...
HomeMy WebLinkAbout20220339 120 S. Broadway Site Plan Correspondance (2) 9/14/22,5:43 PM Zimbra Zimbra susan.barden@saratoga-springs.org Re:PB#20220339-120 S.Broadway Site Plan From:AI Flick<al.flick@saratoga-springs.org> Wed,Sep 14,2022 03:37 PM Subject:Re: PB#20220339-120 5. Broadway Site Plan To:Brien Ragone<bragone@edpllp.com> Cc:Susan Barden<susan.barden@saratoga-springs.org>,Debbie LaBreche<deborah.labreche@saratoga-springs.org>, rtitus<rtitus@labergegroup.com>,Steve Lashomb<steve.lashomb@saratoga-springs.org>,Kate Halliday <kate.halliday@saratoga-springs.org> External images are not displayed. Display images below Brien- The City Arborist has reviewed the Landscape Plan for 120 S. Broadway and has no comments. Thank you. From:"al flick"<al.flick@saratoga-springs.org> To:"Brien Ragone"<bragone@edpllp.com> Cc:"Susan Barden"<susan.barden@saratoga-springs.org>,"Debbie LaBreche"<deborah.labreche@saratoga-springs.org>,"rtitus" <rtitus@labergegroup.com> Sent:Wednesday,September 14,2022 2:44:27 PM Subject: Re: PB#20220339-120 S.Broadway Site Plan Hello Brien- I reviewed your revised Site Plans dated 8/9/22 for 120 S. Broadway project and have the following comments: 1)Sheet 2-Existing Conditions&Survey Map -Include a note below TP#1 results stating additional test pit(s)to be performed prior to construction per EDP's direction. 2)Sheet 4-Site Plan -Extend granite curb installation so that it ends opposite northerly property line. -Provide a detail for retaining wall to be located at rear of Bldg.#1. 3)Sheet 6-Utility Plan -New water connection by way of TS/V,therefore valve will be adjacent to 12"main, not at property line as shown. -Water service(to Bldg.#5)typically not be fed from a hydrant lead. Hydrant valve typically located directly off tee at supply line. -Replace 10"VCP sewer from exist.MH to exist. MH using 12"SDR26 PVC since existing upstream sewer is 12". -Tie-in catch basin should reference City Detail ST-4 on Sheet 11 as City will O/M. Provide separate detail for catch basins on private property,if so desired. -Plan calls out 6'dia.drywell while detail shows 4'dia. Provide T/F elevations for both drywells on the plan. 4)Sheet 7-Planting Plan -City Arborist comments forthcoming. 5)Foot Candle Analysis(d.April 11,2022) -Perhaps this drawing should be included in plan set as separate Lighting Plan and show light locations and schedule? 6)General Engineers Narrative -The attached hydrant flow data was obtained from DPW records. EDP shall determine if addYl hydrant flow test is needed for engineering design purposes. EST DATE LOCATION NOZZLE(IN.) PITOT(P.5.1.) NOZZLE COEFF. GPM STATIC(P.5.1 4/24/13 BROADWAY(135 SO.BROADWAY)-----------------------------------------------------�2.5 42 1 1100 79 """"""""""""""""""""""""""""""""""""""""""""' 3/27/18 BROADWAY(ADELPHI AND CANFIELD) 2.5 40 1060 73 Please let me know if anyone has questions or would like to discuss.Thank you. https://m.saratoga-springs.org/h/printmessage?id=65614&tz=America/New_York 1/3 9/14/22,5:43 PM Zimbra From:"Brien Ragone"<bragone@edpllp.com> To:"al flick"<al.flick@saratoga-springs.org> Cc:"Susan Barden"<susan.barden@saratoga-springs.org>,"Debbie LaBreche"<deborah.labreche@saratoga-springs.org>,"rtitus" <rtitus@labergegroup.com> Sent:Wednesday,July 6,2022 928:23 AM Subject: Re: PB#20220339-120 S.Broadway Site Plan CAUTION:This email originated outside of the City network.Please contact IT Support if you need assistance determining if it's a threat before opening attachments or clicking any links. Good Morning AI, Please see our comment responses in red below. Also attached is the Laberge comment response letter and a new set of pdf plans,stormwater narrative,and SWPPP with the revisions requested by the City and Laberge. If these files are too big for anyone to receive and/or you would like hard copies,please let me know and I will get them to you ASAP. Also,Please let me know if you have any questions or if you require any additional information,and please add this information to the City's project files. Thank you. Brien Ragone,R.L.A.LEED BD+C Landscape Architect On Thu,Jun 30,2022 at 4:03 PM AI Flick< I.fla ick(a�saratog� ring,s.Qrg>wrote: Hi Susan- I have reviewed the Site Plan submittal for PB#20220339-120 S. Broadway and offer the following comments on behalf of the City Engineers Office: 1)Sheet 2-Existing Conditions&Survey Map - Exist.water main on S. B'way shown in wrong location. Main is located in roadway approx. 5-feet from west curb line. Correct,and label as 12",on all sheets. The existing watermain has been updated on the plans. - Exist. sanitary sewer downstream of MH having TF=324.05 is vitrified clay pipe(VCP). Label as such on all sheets. The plans have been updated and now reflect this rype of pipe. -Show water&sewer service connections to existing buildings. Approximate locations of the water laterals are now shown on the existing conditions plan according to the owner. Sewer laterals are assumed in their approximate locations. Prior to construction,these service locations will need to be verified. -Test pit data provided at one site location only. Are additional test pits needed? Any additional test pit data will have to be performed once the existing pavement has been removed. If there are any discrepancies at that time,we will have to update the construction set of plans. 2)Sheet 3-Removals Plan -Show exist.water&sewer services. If services won't be reused,include note specifying removal per City requirements. Approximate locations are now shown and notes have been added to the sheet. 3)Sheet 4-Site Plan - New granite curbing proposed across old driveway entrances only. Replace all frontage curbing to match. A note has been added to the plans to match the existing granite curb. 4)Sheet 6-Utility Plan - Explain purpose for providing water main stubs for future extension at north and south property bounds of parcel. -Is there a means to connect townhomes to public sanitary sewer collectively instead of individually as proposed. This will be looked at in a future submission after coordinating with the building Architect. 5)Sheet 10-Site Details https://m.saratoga-springs.org/h/printmessage?id=65614&tz=America/New_York 2/3 9/14/22,5:43 PM Zimbra - Detail 6: Specify cast iron detectable warning strips. The detail has been updated and now reflects the City's Standard detail. 6)Sheet 11-Site Details - Detail 10: Expand detail notes to say mortared using non-shrink grout. - Detail 11: T/F elevation doesn't match Grading Plan. Porous pavement noted on detail(?) Detail 10 has been revised accordingly and detail 11 T/F has been revised to match the grading plan. 7)Sheet 12-Site Details -SCSD#1 Notes: County permit or construction requirements not applicable as sewer work involves City O/M sanitary system and will be constructed to City standards. This reference has been removed from the plans. 8)General Engineers Narrative - Page 4:An actual hydrant flow test needs to be performed close to project site to determine available pressure and flow. - Page 4: Ciry is not interested in the dedication of water or sewer infrastructure constructed as part of this project. EDP will coordinate with the city to perForm hydrant flow tests close to the project site.Water and sewer infrastructure constructed as part of this project will be privately owned and maintained. 9)Stormwater Management Narrative - Page 3: Infiltration testing and data is needed to evaluate proposed SMP's(i.e. infiltration chambers,drywell). Infiltration testing has been performed and results added to the site plans. Should anyone have questions/concerns or would like to discuss these comments,feel free to contact me.Thank you. Albert Flick Sr. Engineering Technician City of Saratoga Springs (518)587-3550 ext.2573 Confidentialiry/Privilege Notice:This e-mail communication and any files transmitted with it contain privileged and confidential information from the Ciry of Saratoga Springs and are intended solely for the use of the individual(s)or entity to which it has been addressed.If you are not the intended recipient,you are hereby notified that any disclosure,copying,distribution,or taking any other action with respect to the contents of this message is strictly prohibited.If you have received this e-mail in error,please delete it and notify the sender by return e-mail.Thank you for your cooperation. Albert Flick Sr. En�ineering Technician City of Saratoga Springs (518)587-3550 ext.2573 Albert Flick Sr. Engineering Technician City of Saratoga Springs (518)587-3550 ext.2573 Confidentiality/Privilege Notice: This e-mail communication and any files transmitted with it contain privileged and confidential information from the �ity of Saratoga Springs and are intended solely for the use of the individual(s) or entity to which it has been addressed. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or taking any other action with respect to the contents of this message is strictly prohibited. If you have received this e-mail in error, please delete it and notify the sender by return e-mail. Thank you for your cooperation. https://m.saratoga-springs.org/h/printmessage?id=65614&tz=America/New_York 3/3