RE: YMCA Site Plan Modification—Engineering Report Memo
Dear Ms. LaBreche:
The YMCA Site Plan Modification is being submitted for the modification of an existing site plan approval. The original
approval was split into two phases. Phase 1, which was constructed, included a new pavilion and athletic field located in
the northeast corner of the lot. Phase 2 which has not been constructed included a 17,000 sf building expansion on the
north face of the YMCA building and a 5,100 sf basketball court. The proposed modifications to the Phase 2 area include
replacing the 5,100 sf basketball court with a building addition to expand the indoor recreation facility.
The engineering report for the previously approved site plan estimated 300 users of the facility at 5 gpd/user to calculate a
design wastewater flow of 1,500 gpd. The site plan modification is not anticipated to generate more than the 300 users
previously assumed and therefore will not increase sanitary flow or water demand from the previously approved project.
Any increases in stormwater flow as a result of the site plan modification have been accounted for in the SWPPP
modification included with this submission. The SWPPP modification is to be added to Appendix E of the active Saratoga
Springs YMCA Branch Expansion SWPPP.
Sincerely,
C��-'�
Douglas B. Heller, P.E.
Associate Principal
Director of Civil Engineering
dheller(a�thelaqroup.com
G:'��Proj-2021'��2021039 F'�1C� Site Plan`�2021039�dmin��O�Reports`�2021039EngReport'�1emo