Loading...
HomeMy WebLinkAbout20220612 YMCA Site Plan Mod Eng Report Memo � The LA GR�UP Land�scape_Archi�e��ture�_Engineerinq P_C_ Y��r�,lr.Vau�•r�,�_PL;<<. �-O �,iJllC] ���E.V 5,,�.,+[c�i�a 5prinqs NY 1286v C„51�-587-�100 j`�18 `�8� Ol�n ,, . � . ,,;, June 15, 2022 Debbie LaBreche Saratoga Springs Engineering Department 474 Broadway Saratoga Springs, NY 12866 RE: YMCA Site Plan Modification—Engineering Report Memo Dear Ms. LaBreche: The YMCA Site Plan Modification is being submitted for the modification of an existing site plan approval. The original approval was split into two phases. Phase 1, which was constructed, included a new pavilion and athletic field located in the northeast corner of the lot. Phase 2 which has not been constructed included a 17,000 sf building expansion on the north face of the YMCA building and a 5,100 sf basketball court. The proposed modifications to the Phase 2 area include replacing the 5,100 sf basketball court with a building addition to expand the indoor recreation facility. The engineering report for the previously approved site plan estimated 300 users of the facility at 5 gpd/user to calculate a design wastewater flow of 1,500 gpd. The site plan modification is not anticipated to generate more than the 300 users previously assumed and therefore will not increase sanitary flow or water demand from the previously approved project. Any increases in stormwater flow as a result of the site plan modification have been accounted for in the SWPPP modification included with this submission. The SWPPP modification is to be added to Appendix E of the active Saratoga Springs YMCA Branch Expansion SWPPP. Sincerely, C��-'� Douglas B. Heller, P.E. Associate Principal Director of Civil Engineering dheller(a�thelaqroup.com G:'��Proj-2021'��2021039 F'�1C� Site Plan`�2021039�dmin��O�Reports`�2021039EngReport'�1emo