Loading...
HomeMy WebLinkAbout20220236 131 Excelsior Ave. Site Plan B&L Review Letter i rton o 'dice 1 May 12, 2022 Debbie LaBreche, City Engineer City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 Re: North Spring Run Site Plan Review 131 Excelsior Avenue, Saratoga Springs, NY Engineering Review-first comment letter PB#20220236 PO#220358 File: 539.064.001 Dear Ms. LaBreche: Barton & Loguidice, D.P.C. (B&L) has completed a review of the following reports and information for the 131 Excelsior Ave. site plan, prepared by the LA Group. • Application for Site Plan Review with Application Checklist, dated March 10, 2022; • Engineering Report for North Spring Run, Excelsior Avenue dated March 16, 2022; • Complete Streets Checklist, dated March 10, 2022 ; • Short Environmental Assessment Form (SEAF), dated March 10,2022; • Cost Estimate for Letter of Credit, dated 3-21-2022; • Stormwater Pollution Prevention Plan (SWPPP), dated March 16,2022; • Traffic Evaluation as prepared by Creighton Manning, dated January 06, 2020; • Water Service connection Agreement and Application form; • Plan Set (10 Sheets). Architectural sheets by Clarke Caton Hintz This review was conducted on behalf of the City of Saratoga Springs.The above referenced documents and information were reviewed only with respect to our scope outlined in our task order/proposal. General 1. The plan seems well designed and balanced. We suggest careful attention is paid to executing signage location and landscaping away from ingress and egress pavement and Excelsior Avenue to avoid impacting site distance. The experience to is en. SM 10 Airline Drive-Suite 200-Albany,New York 12205 e. Telephone:518-218-1801-Facsimile:518-218-1805-www.BartonandLoguidice.com The power to c VOT T v Debbie LaBreche, City Engineer Alt..0j, City of Saratoga Springs May 12, 2022 Page 2of4 2. Are there any demolition wastes requiring special environmental attention like transformers or other sensitive materials?We suspect that brewery operation did not have many materials of concern if any. Incorporate any requirements in plan notes involving certified personnel for removals if applicable.The same notes that address this in the SWPPP could be repeated on the plans where contractors are more likely to see. 3. How many bicycle storage spaces are available inside the structures? 4. Was a green roof considered for part of the rooftop areas?The stormwater planters provide RRv for the project but rooftop greenery and green infrastructure could appeal to much of the environmentally minded clientele likely to dwell here. 5. Given the urban setting we recommend another two EV stations for a total of six or at least the conduit and service accommodations to provide more easily in the future and not require disturbed pavement. SEAF 1. No comments. Water and Sanitary Sewer 1. Confirm number of connections to the Excelsior Avenue 12-inch water main.The plansindicate one six-inch service and did not seem to have a tap for the easterly building or a connecting pipe between the buildings. Please clarify. 2. We recommend a secondary means of thrust restraint on the 6-inch water main service with two 45 degree bends because that area may be disturbed by other future utility maintenance or subsurface operations.Thrust blocks in such areas would benefit by either retainer glands or restrained joint pipe and fittings in addition to the thrust blocks. Static pressure is pretty high at this location. A significant leak near the building(s) is worth the added restraint. 3. Coordinate fire protection system design with city building and fire services. Cost estimate for Letter of Credit 1. With quantity of striping we recommend a higher unit cost for crosswalks, parking areas and related. 2. Confirm light pole costs incorporate large concrete piers. Unit cost plus the decorative fixtures seems low. 3. The unit cost for the two dumpsters seems low as a concrete slab and enclosure is also included. 4. The unit cost for sanitary sewer installed seems low as it includes imported backfill materials. 5. The unit cost of the hydrodynamic separator seems low and should include installation, imported materials. 6. Construction unit costs have been impacted by elevated inflation and some unit costs seem low by 15-20% due to recent trends. Debbie LaBreche, City Engineer Alt..0j, City of Saratoga Springs May 12, 2022 Page 3of4 SWPPP 1. The system for stormwater management includes stormwater planters, underground pipe detention and a hydrodynamic separator, Discharge is to existing stormwater infrastructure and conveyances. 2. Confirm hydrodynamic separator unit selected can treat peak inflow rate of water quality storm storm and has an internal bypass capacity to pass the 100 year peak inflow rate. Plans Survey sheet by Northeast 1. This plan seems to not include the area being developed and covers land west of the L-1.0-Site Preparation, Erosion & sediment Control Plan 1. Show short term demolition and soil stockpiling for prompt removals and stabilization, respectively. Consider wind erosion of piles with notes for covering or temporary seeding. L-2.0-Layout and Materials Plan 1. Consider adding two additional EV stations. See general notes. L-3.0-Grading and Drainage Plan 1. Show line of north finished floor elevation across building representing 272.50. 2. We recommend moving the discharge structure closer to CB-3 and pipe to CB-3 in lieu of the wye connection to allow easier cleaning if ever necessary. 3. The easterly slope could likely be graded to droughty sands. A deeper depth of topsoil and premium tackifier with hydroseed and/or other stabilization means will help reduce erosion/rills and repairs during emergent period of vegetation establishment. Existing and undisturbed vegetated areas that are sparse may need fertilization to blend with new landscaping. L-4.0 Site Utilities Plan 1. How is easterly building served with water, see general comments. 2. See previous comments regarding truck traffic and pavement thickness. 3. A detail for an asphalt curb is shown but could not find where applied on the plans. L-7.1 —Site Details 1. We recommend addition of protective coating such as bitumastic or equivalent as a barrier between aluminum posts in fence detail and concrete where embedded. Aluminum reacts in contact with concrete. Debbie LaBreche, City Engineer Alt..0j, City of Saratoga Springs May 12, 2022 Page 4of4 If you have any questions, please feel free to contact our office. Sincerely yours, BARTON & LOGUIDICE, D.P.C. f ` J14-44- Bradley D. Grant Senior Project Manager BDG/bdg Cc: via e-mail- Debbie LaBreche - Matt Zeno Doug Heller, LA Group