Loading...
HomeMy WebLinkAbout20200735 Excelsior Ave. Apartments Labella fourth review letter Par�ere�b�r p��tn�rsh�p, ... /� �`'6���'�r�rR� 'd.i r �A � , `�,e. �rt:.. ��� , ,;''�a,��^ �f� �'t,�^��t, March 21, 2a22 ...�,���� �,,,� Mr. Michael B. Vei�ch Business Manager �ity of Saratoga Springs 474 Broadway Saratoga Springs, New York 22�66 RE: City �esign�ted Engineer Services for Site Plan a�plication and SWPPP Review - 4th S�bmittal Excelsior Avenue Apartments Excelsior Avenue., City of Sarataga Springs,Saratoga County,New York City Project No. PB#2020a735, 2020Q736 Project No. 2221175,02 De�r Michael: L�Bella Associates have completed our review of the followir�g mater�als received: • W��er and Sanitary Sewer�ngineering Rep�rt prepared by The LA Group, dated October 14, 2�2a, revised December 22, 2Q21. .� • Cost Estimate for Lett�r of Credit, prepared by Th� lA Group, dated December 27, 2Q21. • Sto�mwater Pallution Prevent�on Plan, prepared by The LA Group,dated actaber 14, 2�2a, revised December 21, 2��1. * Site arawings entitled "Excelsior Park Apartments", prepared by The I..,A Graup, unless atherwise noted, dated Qct�ber 14, 2020, revis�d Janu�ry 21,2�22, car�sisting of the following 15 she�ets: o Cover Sheet o S-1 Survey prepared by Thompson Fleming, Land Surveyars, P.C. dated September ��6, 2�32D. o L-1.0 Site Preparation, Erosion &Sediment Gontrot Plan o L-2.0 Site Layou�& Mat�rials P1an o L-3,4 Site Grading Plan o L-3.1 Site Drainage Plar� o L-3.2 Site Ac�essibility P1an o L-4.4 S ite Uti I iti es P!�n o L-5.Q Site Landscape &� Light�ng Pl�n o L-6:� �it�Detai�s - - - o L-6.1 S ite D eta i!s a L-�.2 Site netails o L-�.3 Site Utt I�ty Deta i Is o L-6.4 S ite �Iti I ity Deta i Is a L-6.5 S ite Uti I ity Deta i Is Please no�e tha�althQugh this projec� has been revi�wed by our office�nd all technical comments were previously addressed, due to recent design modification,th�e C�ty h�s requested �hat our office 4 Br�ti��Am�rican ��v�� �.����m, �J�'22��.0 � p���8� ,27�-�3��5 ���.�����������r�� �� complete an add�tionai review of the reuised mater�als.Th�e following are our observations/comments: S�te Pla ns: 1, Please pr+ovide a si�ned and sealed copy of the boundary, topo�raphic and utility surv�y. 2. Please show the limits of the existing easements on all sheets, It appears that wo�k including erosion contral me�sures, paving, pro�c�sed catch basins, and grading, may be proposed on Lot 4, owned by Excelsior Park, which is outside of the exi�ting cross-lot and parking easement. Please identify any additional easements that may be required to accammodate th i�wo rk. 3. Please provi��a signed and seal�ed copy of the S�ubdivision Map. 4. The Limit of Work on Sh�et L-1.� should be expanded to include the Gonnectian of the prc�posed sani�ary�ewer to the existing sanitary sewer system. 5. A note sh�uld be added to the Site Preparatiara, Erc�sion &Control �'lan stating that soil stockpile areas shou�d be an adequate distance from infilt�ation areas to prevent sedim�n�ation of�rea, 6. l� note shou�d be added to the plans �also pro�ided in the sequence af constructi�n}that indicates infrltration areas be protected from heavy con�tructian equ;pment traffic �and not , connected to the starm system until the completion of canst�uction and the fin�l stabilization ' of a I I u pstrea m a reas. 7. T�e "Na Parking" and "Van Accessible"sign� called �ut on the Accessible Parking Layout detair sh�uld be added �o the Si�n Sche�dule. a, Additi�nally, the notes for the "f�o Parking" �nd "Van Accessible" signs for tk�e Acce�si ble Pa rki ng Layout deta i l a ppea r to b�switch�d. Please cl�rify. �3. A 2"x 12" p�essure treated ticnber shall be used for the leuel spre�der,as shown in Figure 3.? of the 1VYS Stan�dards and Specifications for Erosion and Sediment Control, November 2�16. �etail 7, Sheet L-6.4 currently shows 6"x6"timber; ple�se revise. 9. Slapes�nd cross s�opes should �e provided for all proposed �ccessible routes. Note th�t previous submissions did indicate slopes betwe��t�e praposed play�ro�nd and accessib�e p�rk�n,g_sp�ces and those have been removed on the cur�ent submission; please add. _ SWPPP: 1U.City Code Chapter 24-2 re�uires lor�g-term maintenance of the storrr�water managemen� pract�ces. The foflowing notes need to be ad�de�to the SWPPP under Post--Construc�ion Qperatian and M��ntenance of Stormwater Control Devices: � � a. "All post-construction stormwater man�gement faciiities must be inspected �nnu�l�y by a qualified profes�ional, a r�port p��epared and submitted to the C�ty En�ineer documenting the inspections as w�ll as�he maintenance acti�ities that were comp�eted during the prior year." b. "The C�ty of Saratog� Springs sha�l appro�e a formal maintenanc� and inspection agreement �n accord�ance with City Code Ghapter 242 far storrnwater managerr�ent fa�il�ties to ensure the practices will be properly operated and maintained in accordance with the long-terr� operation and maintenance pla�s.This agreement shall be binding on all subsequent landowners and recorded in the office of the County Clerk as a deed restriction on th� property." �1. Per Table 5.8 of�he NYS DEC Stormwater Design Manuai �SMDM} a gravel diaphragm shall be installed at the top of the firter strip and a permeable berm shall be ir�stalled at the toe of the fi Iter stri p. 12,�he depth of the filter strip depressio� shown on the Levef Spreader detail �12 inches)and used in HydroCAD �6 inches} conflict. Please re�rise. 13.The final SWPPP shauld: �. Be�ign+ed by a responsible co�porate officer, gen�ral partner, proprietor, prhncipal executive officer, ra�king elected official, or duly authorized r�presentative; and b. Include a �igned copy of the Noti�e of Intent. y 14.A seq�uence of construction, including all relative required elernents per the NYS Standard� and Specifications far Erosion and Sedimer�t Cor�trol, �lavember 2+D16 �see page 2.15), shall be included in t�e SWPPP. �.5.Section 4.4 c�f t�e SWPPP, Erosion and Sediment Control Practice Maintena�nce, should be update�d to ir�c�ude apprapria�e req�irements addressing maintenance of the concrete washout and inlet pr�tectior�. 16,Section 6.1 of the SWPPP, Maintenance to be Performed,shauld include �pprapr�ate requiremer�ts addressing rr�aintenance of the filter strip. 17.The time af concentratian flow paths shoul� be included an the drainage maps. 18.Attachment D of the Stormwater M�r�agement Repart presents WQv calculations. The requ�red WQv for t'�e project rnus� be calculated us�ng the ent��re cor�tributing area of the site; r�rr�n���tctrla-tions anly address the �rnpervious �rea�c�f th�-�-�-�e:P�e��e-revt� . - 19. Per Section 5.3 �see page 5-5�} of the SMDM filter stri�ps are an area r�duction practice and are not to be used for water quality reduction. The WQv calculations presente+d in Attachment C� of the Stormwater Management Report app�y a �IIQv reduction for the filter strips which is �not appropr�ate; please revise. 20.As it is proposed th�t Su�catchm�nt Ar�a P3 will co�nnect�o an underground infiftration system ir�stalled fo�the Excelsior Park Condomir�iums pro}ect,please provide the fallowing informa�ion. 3 � a. Dra i nage eas�ment perm itting th�e d ischa rge af stormwate r to th is practice. Respect�ully submitted, LaBella Associates � � ��� Jennifer I�echamen, PE Senior Civil Engineer � � _ � �