Loading...
HomeMy WebLinkAbout20200735 Excelsior Ave. Apartments Chazen review letter TH� CAPITAL DISTRICT OFFICE �ivil Er���ne�r� 547 River Street Lan��ur�r��rc�rs Pl�nr�ers Tr'oy, NY 12180 �,������E��� Er��rir�nm�ntaM���f�ty Pra���s.si�n�l� P: 518.273.0055 or 888.539.9073 La r��d���p��1r�h i���t� ����,����,��,��,��,�,���,,��,�� ���r,���rt�t�c�r,����,�,�����,������ www.chazencompanies.com Mr. Michael 6. Veitch Business Manager City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 November 17, 2020 Delivered via email: michael.veitch�sarato�a-sprin�s.or� Re: City Designated Engineer Services for Site Plan application and SWPPP Review—1St Submittal Excelsior Avenue Apartments Excelsior Avenue., City of Saratoga Springs, Saratoga County, New York City Project No. PB#20200735, 20200736 Chazen Project No. 32004.05 Dear Michael: The Chazen Companies (Chazen) have completed our review of the following materials received: � Cover Letter prepared by The LA Group dated October 14th, 2020. � Subdivision application package containing: o Application for Subdivision Review dated October 5th, 2020. o Subdivision Checklist dated October 14th, 2020. � Site Plan application package containing: o Application for Site Plan Review(including PUD) dated October 5th, 2020. o Site Plan Review Submittal Checklist dated October 14th, 2020. o Complete Streets Checklist dated October 14th, 2020. o Water Service Connection Agreement dated October 5th, 2020. o Cost Estimate for Letter of Credit dated October 14th, 2020. � Stormwater Pollution Prevention Plan (SWPPP) prepared by the LA Group, dated October 14th, 2020. � Engineering Report prepared by the LA Group dated October 14th, 2020. � Site Drawings entitled "Excelsior Park Apartments", dated October 14th, 2020, prepared by the LA Group unless noted otherwise, consisting of the following 15 sheets: o Cover Sheet o S-1 Survey prepared by Thompson Fleming, Land Surveyors, P.C. dated September 16, 2020. o L-1.0 Site Preparation, Erosion &Sediment Control Plan o L-2.0 Site Layout& Materials Plan o L-3.0 Site Grading Plan o L-3.1 Site Drainage Plan o L-4.0 Site Utilities Plan o L-5.0 Site La ndsca pe & Lighti ng Pla n o L-6.0 Site Details o L-6.1 Site Details HUDSON VALLEY•CAPITAL DISTRICT• NORTH COUNTRY•WESTCHESTER • NASHVILLE,TN Chazen Engineering, Land Surveying& Landscape Architecture Co., D.P.C. (New York) Chazen Engineering Consultants, LLC(Tennessee) Excelsior Avenue Apartments—PB#20200735,20200736-1St Submittal Review November 17t",2020 Page 2 of 6 o L-6.2 Site Details o L-6.3 Site Utility Details o L-6.4 Site Utility Details o L-6.5 Site Utility Details Note that there were no SEQR Materials received with the application materials. Following are our observations/comments: General: 1. The City's project numbers of 20200735 and 20200736 should be added to all site plan application and all supporting documents. 2. The applicant states that bicycle-safe catch basin grates will be installed onsite, however,the provided details do not specify the grates to be bicycle-safe. Please clarify. Water/Sewer En�ineerin�Report: 3. The applicant has submitted hydrant flow testing throughout the Excelsior Avenue area performed from 1991 to 2014. Please perform hydrant testing at the hydrants nearest to the project site and submit results to the City to confirm current available pressures and flows to support the basis of design. Typically, hydrant flow testing shall be no older than six (6) months unless it has been deemed that no changes to the supply or transmission of water within that area have occurred since the test was performed. 4. The Engineering Report calculates the anticipated wastewater generated by the proposed apartments as 58 bedrooms x 110 gpd / bedroom, yielding 6,380 gpd. However, the narrative and submitted application materials indicate that 58 apartment units are proposed,which will be a mix of one-, two-, and three-bedroom units. Please clarify the total number of bedrooms proposed and update the wastewater calculations and Engineering Report accordingly. 5. The Water Service Connection Agreement lists the anticipated water demand as 679,250 cubic feet of water per year (5.08 million gallons). The Engineering Report lists the anticipated water demand as 6,660 gallons per day(2.43 million gallons). Please clarify the proposed water demands and update the Engineering Report and Water Service Connection Agreement accordingly. Project Cost Estimate: 6. The applicant proposes an 18" HDPE storm sewer going to the isolator row in SMP-2 as shown in Detail 2, Sheet L-6.5 and the utility plan which is omitted from the Cost Estimate for Letter of Credit. Please revise. Site Plans: 7. Please provide a signed and sealed copy of the boundary, topographic and utility survey. Excelsior Avenue Apartments—PB#20200735,20200736-1St Submittal Review November 17t",2020 Page 3 of 6 8. The site plans show work to be performed south of the project site near Lot 4, owned by Excelsior Park Condominiums, including erosion control measures, paving, sidewalk installation, a new catch basin, and grading. It is unclear if all of this work is located fully within the cross-lot and parking easement identified between existing Lot 4 and proposed Lot 6 as shown on Sheet S-1, or if additional easements will be necessary to complete the work as shown. Please show the cross-lot easement on all sheets to verify its boundaries with respect to proposed work and identify if additional easements will be necessa ry. 9. The applicant shows the sanitary sewer connection to an existing sanitary sewer main southeast of the site. Sheet L-4.0 shows an existing sewer main extending northwest from an existing manhole to proposed SMH#1.This pipe is not shown on the survey. Please clarify if this pipe is existing or proposed. If existing, is there an existing manhole in the location of proposed SMH#1? 10. Sheet L-2.0 identifies a proposed Trash Room at the southwest corner of the proposed mixed-use building. Please identify how vehicular access is provided to the trash room to accommodate trash re m ova I. 11. The Subdivision Map for Beacon Communities is shown at a scale of 1" = 100'. The required minimum scale for subdivisions per the City code is 1" = SO'. Please provide a subdivision map at the required minimum scale. 12. The parcel street address, including existing and proposed postal addresses associated with the subdivision, are not included on the site plans. Please provide. 13. Please provide a signed and sealed copy of the Subdivision Map. 14. Silt fence is shown outside the limits of work on Sheet L-1.0. Please revise. 15. Please quantify the limits of disturbance on Sheet L-1.0 and ensure that this quantity is consistent with that listed in the SWPPP and N01. 16. The proposed accessible ramp on the north side of the parcel has a rise of 36", which exceeds the maximum rise of 30" permitted by ANSI 117.1—Section 405 without a landing. Please provide additional spot elevations and detail to show compliance with ADA requirements. 17. Please identify all ADA ramps and provide same level of information (as requested in Comment 16) for all accessible ramps on the site. 18. Please provide additional grading detail (spot elevations) around the playground. 19. Please provide top and bottom wall elevations for all proposed segmental block retaining walls. 20. Please provide spot elevations around the exterior of the proposed buildings, top and bottom of stair elevations, and additional top/bottom of curb elevations throughout the parking areas. 21. Please provide elevations along the limits of paving proposed for Lot 6 where pavement will tie into pavement being installed by the developer of Lot 4. Excelsior Avenue Apartments—PB#20200735,20200736-1St Submittal Review November 17t",2020 Page 4 of 6 22. It appears that a low point will be created on the south side of the site near CB-4 and contour 291' is missing. Please revise accordingly and provide sufficient detail. 23. It appears that portions of the proposed roads and sidewalks are in excess of 5% slope. Please identify the ADA accessible routes throughout the site. 24. It is recommended that a crosswalk be installed at the entrance to the site from Excelsior Avenue. 25. Will the proposed sidewalk on the south side of Lot 6 be extended easterly across Lot 5 to Excelsior Avenue? 26. Section D105.1 of the 2015 Fire Code states "Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided."Section D105.2 of the 2015 Fire Code states"Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet(7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof." The cover sheet indicates the building will be 4-stories and 50 feet high. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. The Applicant to indicate which side of the building is proposed for use as an aerial fire apparatus access road in coordination with the fire code official. Conformance to the Fire Code will be reviewed once an answer is provided. 27. The Applicant shall provide the plans and engineering report to the Fire Department for review and comment. Please submit for the record a letter from the Fire Department indicating that they can adequately service the proposed use. 28. The provided Site Landscape & Lighting Plan does not provide illumination intensity for the two proposed Decorative Street Light Fixtures on the west side of the site. Please update the Site Landscape & Lighting Plan to include intensities from all proposed fixtures. 29. In Detail 1 on Sheet L-6.3 (water service connection), the applicant refers to a splice detail which is not included. Please provide. 30. The applicant has not provided a detail for the pavement sawcut; please provide. 31. Several of the proposed details appear to deviate from the City Standards; please revise: a. In Detail 7, Sheet L-6.0 (asphalt pavement detail), the applicant proposes a single requirement for layer thickness for both the parking lot and roadway. City Standards require different layer thicknesses for these types of pavement. b. Detail 9 on Sheet L-6.1 (decorative streetlight) shows a 64 WATT dimmable driver; the City Standard is 67 WATT.This detail also shows a tapered pole constructed from 6063-T6 structural grade aluminum.The City Standard is made form 6061-T6 structural grade aluminum.This detail further shows a 5 AMP fuse with a Ferraz Shawmut FEB-21-21 1P 600V fuse holder. The City Standard requires a 10 AMP fuse with a Bussmann HEB-AA in-line fuse holder. c. Please update Detail 3 on Sheet L-6.3 (pipe trench) to conform with the City's standard detail requirements and specifications for pipe zone bedding, pipe zone backfill, and trench backfill. Excelsior Avenue Apartments—PB#20200735,20200736-1St Submittal Review November 17t",2020 Page 5 of 6 d. Please modify Detail 9 on Sheet L-6.3 (fire hydrant) to show the connection of the fire hydrant to the water main per City Standards. e. In Detail 2, Sheet L-6.4 the applicant proposes a catch basin with exterior dimensions of 3'-6" square.The City's standard catch basin detail is a minimum of 3'-6" by 5'-0" (exterior). 32. Details 1 and 2 on Sheet L-6.5(underground infiltration chambers)are not consistent with the site utility plans. Please update accordingly. 33. Please add dimensions and size of the rip rap(light,medium,etc.)to the Flared End Section Detail(Detail 1 on Sheet L-6.4) based on the expected discharge velocity in the pipe outlets conforming to the City's Standards and NYS Standards and Specifications for Erosion and Sediment Control. 34. The plans identify a length of sanitary sewer main on Sheet L-4.0 where less than 4 feet of cover will be provided and call out pipe insulation. Please provide a detail for the insulated sewer main. 35. Please revise the design to include gas and electric utilities that are to service the proposed structures. Drawings should reflect the location of utility lines, points of connection and the location of ineters, transformers, etc. along with landscape screening. SWPPP: 36. The bottom of proposed SMP-1 is located at an elevation of 287.12'.Soil testing has not been performed within the footprint of this practice, but Test Pits 6 and 7 are located northeast of the practice and Test Pit 5 is located southwest of the practice. At Test Pits 6 and 7 the water table was encountered at an elevation of around 280'. At Test Pit 5, mottling suggesting the seasonable high-water elevation was observed at an elevation of 284.5'. According to the NYS Stormwater Management Design Manual, a 4' separation to groundwater must be maintained for infiltration practices. Please verify that the required groundwater separation is achieved at SMP-1. 37. Infiltration testing in accordance with Table D-1 and Appendix D of the SMDM must be performed within each proposed infiltration area. A test pit has not been performed within the limits of SMP-1. The size of the practices requires that at least two infiltration tests and test pits be performed within each proposed practice in accordance with Table D-1. Please provide required testing. 38. The SWPPP includes SHPO documentation from 2003 which does not specify that this project was part of that review. Please verify and provide supporting documentation. 39. The SWPPP includes ETR documentation from 2015 for the Phase 2 project which does not encompass this lot. Please provide ETR documentation for the project site. 40. We assume that all of the proposed buildings will have flat roofs and interior roof drains that will drain roof runoff to the proposed storm system as modeled. If this is not the case, the drainage delineation will need to be updated. 41. It appears that the northwestern portion of the proposed Subcatchment 1(including the sidewalk north of the entrance road) drains to the access road to the west and should be included with Subcatchment 2. Please clarify. Excelsior Avenue Apartments—PB#20200735,20200736-1St Submittal Review November 17t",2020 Page 6 of 6 42. It appears that a small portion of in the southern area of proposed Subcatchment 2 will not drain towards CB-4 as indicated in the HydroCAD model but will rather drain towards CB-10. CB-10 connects to an underground infiltration system installed for the Excelsior Park Condominiums project which is not modeled in the SWPPP for this project. Please confirm if the intent is to provide treatment for a portion of Subcatchment 2 using this existing practice. If so, please provide: a. Verification of available capacity in this practice to accept and treat the proposed runoff; b. Drainage easement permitting the discharge of stormwater to this practice; and c. An updated SWPPP showing this delineation of stormwater runoff and the appropriate modeling and calculations. 43. Post-development Subcatchment 7 includes a proposed impervious sidewalk. The HydroCAD model shows that this entire subcatchment will discharge directly to AP-1 without treatment. The applicant has designed the stormwater practices for this project in accordance with Chapter 9 of the SMDM requiring WQv treatment of 100% of new impervious areas and 25% of existing disturbed impervious areas. The sidewalk is a new impervious area. Please clarify how this runoff from the sidewalk will be treated. 44. Attachment D in the SWPPP states that the WQv required to be provided by SMP-1 based on its contributing drainage area is about 1,765 ft3, while the HydroCAD model indicates the actual storage volume of this practice is 1,518 ft3. Please revise the stormwater design to provide the required WQv for SMP-1. In order to expedite and simplify the review of revised materials we would appreciate if the next submission be accompanied by a response letter that describes the revised materials and how our comments were/were not integrated. If you have any comments, questions or need additional information, please do not hesitate to contact this office at 518-273-0055. Sincerely, . � Jennifer Nechamen, P.E. Project Engineer cc: James J. Connors, P.E. Chazen Alec Betancourt, Chazen File \\chazencompanies.com\chazen\projects\32000-32099\32004.xx C Saratoga Springs Master\32004-05_ExcelsiorAveApartments_PB-20200735-20200736\Submittal-1\SENT\32004- 05_ExcelsiorAveApts_PB20200735-20200736_Submittal 1_2020-11-16.docx