HomeMy WebLinkAbout20210564 Weibel Plaza PUD Amendment Correspondance _�
� ���'�'��.�
��� ������
��� f:�.���:�:�, SARATOGA COUNTY PLANNING BOARD
��`���� - ' �'� � � ��"�' TOM L.LEWIS JASON KEMPER
rlJ}Rl� � /i �rQ � C
�. �'-�������iA�J^���[-j��.;`;..�,]�",,�...�1.�
�'` , µ* �' 1 � CHAIRMAN DIRECTOR
�:--���:, �. �
�..�-=����-��
��.. ���.
* �- �
�,�. �
�����:
��
June 6, 2 02 2
Dillon C. Moran, Commissioner of Accounts
City of Saratoga Springs City Hall
474 Broadway, Suite 14
Saratoga Springs, NY 12866
Re: SCPB Referral Review #21-96 - Legislative Zoning Text Amendment - City of
Saratoga Springs
In August of 2021, the Saratoga County Planning Board had previously reviewed (see
attached Response Letter) this referral which is now being submitted as an updated
proposed zoning text amendment for Zone B of the Weibel Plaza Commercial Planned
Unit Development of 1992.
Location: Within limits of the Weibel Commercial Plaza PUDD behind current users
(Kohl's, Hannaford, Tractor Supply, Denny's) along Louden Road and Weibel Avenue.
153.-1-18
Received from the City of Saratoga Springs City Council on May 4, 2022.
Reviewed by the Saratoga County Planning Board on May 19, 2022.
Decision: Approve
Comment: What are newly proposed as textual changes to zoning include amending
the description/definition of the overall PUDD boundary so that the boundary reflects
the current seven tax parcels within it (in contrast to what was originally comprised of
three parcel within the same bounds of the PUDD), removing Zone B's current limit on
the m�imum commercial space that is noted as office and hotel uses, to reflect a
general maximum square footage on all commercial space (as defined by
complementing the 41 principal permitted uses of Zone A and up to 3 buildings and
comprised of up to 200,000 sq. ft.), to require as part of site plan review the
consideration and incorporation of T-4 and T-5 design standards to better conform
with the City's Community Mixed Use designation as referenced in the city planning
board's advisory opinion, to amend the expiration date of the PUDD sunset clause to
July 21, 2 03 5 and, finally, to permit Warehouse, Distribution and Wholesale along
with Marijuana Dispensary and Processing as uses with the PUDD legislation.
In discussion among SCPB members and counsel representing the applicant
proposing the text amendment, there was reviewed mapping that differentiated the
PUDD's Zone A from Zone B. The subject Zone B portion of the overall PUDD was
shown along with the surrounding uses that comprise Zone A. Further clarification
was provided during discussion as to the distinction between Zones relative to the
maximum number of buildings (3) and the maximum square footage (200,000 sq. ft.)
50 WEST HIGH STREET (518)884-4705 PHONE
BALLSTON SPA, NY 12020 (518)884-4780 FAX
to be permitted for construction in Zone B (our subj ect area). The maximum build-out
limitations of the proposed PUDD, are as noted below:
• Zone B, which is comprised of the approximately 16 acres of vacant land behind
Hannaford and along the I-87 off-ramp, would be a 3-building maximum with
an aggregate total amount of commercial space of up to 200,000 square
feet. There is also a right to increase the density of use in either of the two
zones by 15% provided the overall density of the planned unit devel opment is
not increased thereby.
• Zone A, which is comprised of the remainder of the PUD D area, includes the
present uses of Hannaford, Kohls, Tractor Supply, Denny's and the additional
vacant parcels along Loudon Road. Remaining untouched by this text
amendment would be the Zone A provision for a 9-building maximum with an
aggregate total amount of commercial space of up to 300,000 square feet.
As this legislation will ultimately affect applications for site plan review to come before
the city planning board (and to be reviewed by the SCPB), we recommend noting
previous comments associated with what both of those boards would be reviewing: 1)
the mix of office uses of various types and footprint size approved for Zone B of the
PUDD, 2) the use of existing or new points of site access, and 3) the mix of vehicles
using such access points and the ease of internal traffic circulation. The project site is
in an area of the City's Greenbelt Trail for which was recently completed the Saratoga
Greenbelt-Wilton Connector Trail Plan. The future site plan(s) emanating from a Zone
B project should consider aspects of pedestrian connectivity that address the newly
endorsed Plan.
Sincerely,
���
a� �
� �
� ���— �
. i �� =���
Michael Valentine, Sr. Planner
Authorized Agent for Saratoga County
DISCLAIMER: Recommendations made by the Saratoga County Planning Board on referrals and
subdivisions are based upon the receipt and review of a"full statement of such proposed action" provided
directly to SCPB by the municipal referring agency as stated under General Municipal Law section 239. A
determination of action is rendered by the SCPB based upon the completeness and accuracy of information
presented by its staff. The SCPB cannot be accountable for a decision rendered through incomplete or
inaccurate information received as part of the complete statement.
-2-