HomeMy WebLinkAbout20180533 385 Broadway Mixed Use Traffic Study 7-26-18 385 Broadway
Mixed-Use Development
TRAFFIC IMPACT STUDY
JULY 2018
Prepared for:
385 Broadway, LLC
553 Crescent Ave
Saratoga Springs,NY 12866
Prepared by:
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 300
Albany, NY 12205
GPI Project#2018088.00
TABLE OF CONTENTS
Page
I. INTRODUCTION 1
II. PROJECT DESCRIPTION 1
III. EXISTING CONDITIONS 1
A STUDY AREA DESCRIPTION 1
B. EXISTING TRAFFIC VOLUMES 4
C. BACKGROUND TRAFFIC GROWTH 4
IV. PROJECTED TRAFFIC CONDITIONS 6
A. SITE GENERATED TRAFFIC 6
B. TRIP DISTRIBUTION 7
C. BUILD CONDITION TRAFFIC VOLUMES 7
V. OPERATING CONDITIONS 10
A. CAPACITY ANALYSIS DESCRIPTION 10
B. RESULTS OF ANALYSIS 11
VI. FINDINGS AND RECOMMENDATIONS 13
APPENDICES
A—Traffic Count Data
B —Capacity Analysis Worksheets
385 Broadway Mixed-Use Development
Traffic Impact Study iGPI
July 2018
LIST OF FIGURES
Page
FIGURE 1 — Site Location Map 2
FIGURE 2 — Study Area 3
FIGURE 3—2018 Existing Peak Hour Traffic Volumes 5
FIGURE 4—Directional Distribution of New Site Trips & Trip Assignment 8
FIGURE 5—Build Condition Peak Hour Traffic Volumes 9
FIGURE 6—Optional Improvements Sketch 12
LIST OF TABLES
Page
TABLE 1 —Trip Generation Summary 6
TABLE 2 —Level of Service Criteria 10
TABLE 3 —Level of Service Summary 11
385 Broadway Mixed-Use Development
Traffic Impact Study ii GPI
July 2018
I. INTRODUCTION
Greenman-Pedersen, Inc. (GPI) has been retained to assess the traffic impacts of a proposed
mixed-use retail/residential development located at 385 Broadway in Saratoga Springs, New
York.
The following report details the analysis performed to assess the traffic impacts of the proposed
development on the adjacent roadway network within the study area. It includes a summary of
the assumptions and procedures used in the analysis, the findings of the analysis, and it presents
any necessary measures to mitigate impacts.
II. PROJECT DESCRIPTION
The proposed development will expand the existing one-story building currently located at 385
Broadway to provide a multi-story mixed use building with retail/commercial space on the first
floor and residential units on the upper levels. Pedestrian access will be provided at several
locations including along Broadway. Parking will be provided and will be accessed through an
easement through the existing parking lot reserved for "Fingerpaint" employees and connects to
Division Street opposite Woodlawn Ave. A Project Location Map showing the site's location in
relation to the area roadways is depicted in Figure 1 on the next page.
The proposed project, when completed, is expected to include 72 apartments (27 of these units
designated as "micro apartments), approximately 8,500 square feet (sf) of retail space (2,400 sf
being new retail space) and 60 parking spaces.
III.EXISTING CONDITIONS
A. STUDY AREA DESCRIPTION
A review of the adjacent roadway network and traffic data indicated that the intersection of
Division Street and Woodlawn Avenue/parking lot access was the only likely location to
possibly be significantly impacted by project traffic. An aerial photo of this intersection
depicting the lane geometry and surrounding area is shown as Figure 2— Study Area.
385 Broadway Mixed-Use Development GPI
Traffic Impact Study 1
July 2018
N
o
4 i'Ql .'' se k- ''' i
a
tl
:a
'xil6r 0. r
A.
r'J I -- "ii.
�9 Saratoga0
ror 5 ��' prin siLZ-
x .1;9 Lill 02.,
' 5'4"`
Ln
aN+� '--a-^� �~E F,5,�"°lam
1 r~
iii y 7■.+1
L7
4: ,
L --
f
Dar ' s , - -� ,-r W � ....r? 0
Oh
* e ,e- STUDY Pcir, L,.7.,„
RO
POSED SITE t I e1 1�
��� AREA41'6 4
.Yeff IL.
- -
— WASHINGTON ST_ .� , "`
Afiler rjjc,
I.r
Of ` r
his. Co nLI I- 5 Pa r�. w,.
-7 ',7) S ati
I c
a •
.6--4-
--Lm SI
50
-r
T.
.12
`' •.
IID) ....r.e a.
ri -64 . ——-- Qe' 0 Mt
e ,
Greenman-Pedersen TRAFFIC IMPACT STUDY
CONSULTING ENGINEERS
385 BROAD WAY
GPI MIXED-USE DEVELOPMENT SITE LOCATION MAP
8OWolf Road SARATOGA SPRINGS, NY 12866
Suite 300 JOB NO. SCALE: DATE: FIGURE NO.
Albany,NY 12205 2018088.00 NO SCALE JUNE 2018 1
Figure 2—Study Area
. rL•
. Ilk A.
. i7 r
. ----- ___ .:, \- -,&.- Pri. : ._ ------,---77
F� .r •:1 -. ��JJ -,ft. ___41
1
7.. �. T, r ii A
' :4!°:44-P-1,)1::.. , ,
7 r ,fit
e F'
..., .
it,, .7 ..: '0 1 - 4 1 I 0 ' .Z.' " . Aft
';i7:11 c)
• •;
A 0 . i ?:;k %'c,5,
._ g 4 STUDY AREA .',A..
�. e.+
--.
,,„s, .,...,
',. :, /Jr .,"440
rrrh470+ i n St I-ilk � L W: ril
ihi."'":- / 'L.!-, sat ot _ - -c, ' 'raw,. . iiIiip y dub -‘ ,
- ---i
---------,4 # ,.
, i--, =: - ..- , . * : ii,t,...g. - ,,,,kg,-„::7 . -,, 4;
' 4:V-- . - 0 i, - . r
'e::_ a i
/ ---' / . '
i, , __ : . i: - i ,.
- .._k„ S �.. J' st,� �'�; �, __ 'art`+,� .
/e
r •a
' tf' 4
,,efami7a 4, ' : ,i/ , j al i
/ fili
if's'
�a _ , - r�,,,,,,
t
' :,,, al ,,,
,
QJ LI
-7 , ••
...*:•,.. / ,r w : Parking`fort___________
.7
i i . .
-,,,r pr, : y _ a ai Fingerpaint ,_ : � 'rr1'iii,i
ri, ., r 4�� 1: Employees . -!
,._,,,,,,...,i,
s aCj t f� �!' -�`S { A., sr i
•r. f ' 4.,..._--z=-- ,,,---' .*_ \
r ,
-P. , • 47- L � �� ��1 '_ i fir/ i _ .. -
. Ale
_ , _ *a: :.
... _
. k,
A description of the roadways and intersections within the study area is provided below.
Intersection of Division Street and Woodlawn Ave. / Site Access — This 4-legged intersection
is two-way stop controlled with stop signs located on the Woodlawn Ave. and site entrance
(parking lot access) approaches. There are pedestrian crosswalks across the west Division Street
leg and the north Woodlawn Ave. leg. The sidewalk extends across the driveway to the
Fingerprint parking lot. The Division Street crosswalk additionally has pedestrian warning signs
facing both eastbound and westbound at the crossing. All approaches at this intersection include
a single lane from which all movements (left, through & right) are taken. The intersection is
located approximately 200 feet east of the signalized intersection at Railroad Place and 300 feet
west of the signalized intersection at Broadway.
Division Street—A two-lane urban street with parallel parking along both sides of the roadway.
The posted speed limit is 30 mph, which is the Citywide speed limit. There are sidewalks on both
sides of the street to accommodate pedestrians.
Woodlawn Avenue — This roadway is 2-lane urban street that runs perpendicular to Division
Street. It has a parking lane adjacent to the northbound travel lane and provides access to a large
municipal parking garage on the northeast corner of the Division Street and Woodlawn Ave.
Intersection. There are sidewalks on both sides of the street to accommodate pedestrians and the
posted speed limit is 30 mph.
385 Broadway Mixed-Use Development
Traffic Impact Study 3 GPI
July 2018
B. EXISTING TRAFFIC VOLUMES
Existing traffic operating conditions were determined through field reconnaissance and traffic
counts performed by GPI at the intersection of Division Street and Woodlawn Ave / Site Access
as previously mentioned.
Vehicular turn movement data as well as pedestrian activity was collected by GPI during the
hours of 7:00 — 9:00 AM and 4:00 — 6:00 PM on Thursday April 31, 2018. Based on the count
data, it was determined that the weekday morning peak hour for roadway traffic is 8:00 to 9:00
AM and the afternoon peak hour is 4:30 to 5:30 PM. The traffic count data sheets are included
in Appendix A of this report. Additionally, GPI reviewed NYSDOT seasonal adjustment factors
to determine how the count data compared to average annual conditions. The adjustment factor
for April, when the counts were performed, is 1.016, which indicates April traffic is typically
1.6% higher than average annual conditions. Because April traffic is similar and slightly higher
than average annual condition, no seasonal adjustment was made to the traffic count data to
conservatively estimate the average annual peak hour traffic volumes.
The 2018 existing peak hour traffic volumes used in the analysis are depicted on Figure 3 on the
next page.
It should be noted when reviewing the diagrams for the existing traffic volumes that pedestrian
crossing volumes are not only listed for the three marked and legal intersection crossings, but for
the fourth leg (no crosswalk) and for a diagonal crossing movement as well. With a large office
building on the southwest corner of the intersection and a heavily used parking garage located on
the northeast corner of the intersection, many pedestrians appear to take the most direct path
between them when possible, which results in a significant number of pedestrians making this
diagonal movement in the existing condition.
C. BACKGROUND TRAFFIC GROWTH
Since the Estimated Time of Completion (ETC) for this project is projected to be within
approximately one year and the development is located within a fully built up downtown area, it
is unlikely that any significant growth will occur before construction is completed. As such, no
background growth was applied to the existing traffic volumes and it is assumed that the existing
volumes will also be the volumes in place for the future No-Build condition (volumes during the
ETC timeframe if the development was not constructed).
385 Broadway Mixed-Use Development
Traffic Impact Study 4 GPI
July 2018
N
WOODLAWN AVE
I
G0 C0 M I�
7
(74)
55 z
'� AL 37 z
122 �/ t-88 2
32 I" "I 23 U)
l l
(26)
+IT r'
N N
TO PROJECT
PARKING
AM PEAK HOUR VOLUMES
NOTE:
- (PEDESTRIANS)
* NO CROSSWALK LOCATED IN THIS AREA
N
WOODLAWN AVE
1 M
ti ti
AT
(106)
29 AL1
27 z
164 (1'1>' 0 t-88 2
8 I`-' `.I 8 5
cn
l l
(50)
+I T r'
ti M
CO N
TO PROJECT
PARKING
NOTE: PM PEAK HOUR VOLUMES
-► (PEDESTRIANS)
* NO CROSSWALK LOCATED IN THIS AREA
Greenman-Pedersen TRAFFIC IMPACT STUDY
CONSULTING ENGINEERS
385 BROAD WAY
GPI 2018 EXISTING CONDITION
MIXED-USE DEVELOPMENT PEAK HOUR TRAFFIC VOLUMES
80 Wolf Road SARATOGA SPRINGS, NY 12866
Suite 300 JOB NO. SCALE: DATE: FIGURE NO.
Albany,NY 12205 2018088.00 NO SCALE JUNE 2018 3
IV.PROJECTED TRAFFIC CONDITIONS
A. SITE GENERATED TRAFFIC
Once completed the project will consist of a total of 72 rental units and 8,533 sf of first floor
commercial space. The project also includes the addition of 60 parking spaces to support the
needs of the residents. These spaces will be accessed through the existing driveway easement
that connects to Division Street opposite Woodlawn Ave.
The current use of the site provides 6,136 sf of commercial space. Although a 2,397 sf increase
retail space is proposed, this is not expected to correlate to a direct increase in traffic, as no
parking is proposed to support this increase in retail use and being sited in an urban area (with a
walk score of 98) this increase in space should not directly correlate to an increase in traffic, as it
is expected that patrons will already be within the downtown area and any trips for the new
commercial space will be walking pass-by trips along Broadway that would be downtown
shopping regardless of whether this development was in place or not. However, the residential
component will have direct access to 60 dedicated parking spaces and will generate additional
traffic for the development. As such, it is appropriate to provide estimates of the additional
traffic that would be generated by the new 72 rental units proposed.
The project sponsor has provided the program Number
information shown to the right concerning the proposed Apartment Type of Units
apartments. 1 Bedroom 1 Bath 34
2 Bedroom 2 Bath 1
Micro apartments are new trend in rental products that 2 Bedroom 2.5 Bath 11
are generally studio apartments of approximately 500 sf. Micro Apartmentsartments 26
that typically appeal to young single persons.
Total 72
Trip Generation forecasts are typically estimated using the Trip Generation Manual published by
the Institute of Transportation Engineers (ITE). For this project, the ITE Land Use Code 231
"Mid-Rise Residential with first floor commercial" was primarily used. However, since ITE
does not provide a micro apartment category, a study of micro apartments from Kirkland
Washington was used to develop traffic generation estimated for the 26 units that fit into that
category. The resulting trip generation estimated for this project are presented in Table 1 below.
TABLE 1
TRIP GENERATION SUMMARY
AM Peak Hour PM Peak Hour
Apartment Type In Out Total In Out Total
46 Standard 4 10 14 12 5 17
(Trip Rate) * 0.30 0.36
26 Micro 1 3 4 1 2 3
(Trip Rate) * 0.14 0.13
Total New Trips 5 13 18 13 7 20
* Trip rate for standard apartments are from ITE,trip rate for micro apartments are from Kirkland,WA study
The walk score for the site location and referenced trip generation information from the Kirkland
study are provided in Appendix A.
385 Broadway Mixed-Use Development
Traffic Impact Study 6 GPI
July 2018
B. TRIP DISTRIBUTION
Based on existing traffic patterns and potential commuter routes, it is assumed that the new site
trips will be distributed to the roadway network based on the following distribution:
• 25% to/from the North via Woodlawn Ave.
• 50% to/from the East via Division St.
• 25% to/from the West via Division St.
The traffic generated to and from the proposed site was split relatively evenly between the three
possible directions with most of traffic coming to/from the east due to the location of Broadway,
a significant north-south thoroughfare.
The trip distribution is depicted in more detail on Figure 4.
Applying this distribution to the projected trip generation for the site results in the AM and PM
peak hour trip assignments shown which is also shown on Figure 4.
C. BUILD CONDITION TRAFFIC VOLUMES
The build condition peak hour traffic volumes used for analysis were developed by combining
the No-Build condition traffic volumes with the trips generated by the proposed development.
The resulting Build Condition Peak Hour Traffic Volumes are illustrated on Figure 5.
It should be noted when reviewing the Build condition volumes that the illegal pedestrian
movements across Division Street were removed, and the pedestrian traffic making those
movements were shifted to the legal crosswalks. This was done to provide the most conservative
estimate of pedestrian delay for the analysis (as higher pedestrian volumes at a single crosswalk
would yield the highest delay for that movement). It is possible that a new crosswalk facility
could be constructed across the eastern leg of the intersection, which would split pedestrian
traffic between two Division Street crossings. If this occurs, operations at the two crossings
would be statistically better than that reported for a single crossing with more pedestrian traffic.
385 Broadway Mixed-Use Development
Traffic Impact Study 7 GPI
July 2018
N
WOODLAWN AVE
25%
H
co
z
O
25%77 ,F 50%
E
+IT 1÷
0 0 0
I I o
CO CO I')
TO PROJECT
PARKING
NOTE:
-* INBOUND TRIPS TRIP DISTRUBUTION
- OUTBOUND TRIPS
N
WOODLAWN AVE
+1(+3)
IF
F-
co
z
0
+1(+3) - +-+3(+7) 5
0
1
N N M
+ + +
MMI`
+ + +
TO PROJECT
PARKING
NOTE:
AM (PM) NEW SITE TRIPS
AM: 5 IN / 13 OUT TRIP ASSIGNMENT
PM: 13 IN / 17 OUT
Greenman-Pedersen TRAFFIC IMPACT STUDY
CONSULTING ENGINEERS
385 BROADWAY
GPI MIXED-USE DEVELOPMENT TRIP DISTRIBUTION Et
TRIP ASSIGNMENT
80 Wolf Road SARATOGA SPRINGS, NY 12866
Suite 300 JOB NO. SCALE: DATE: FIGURE NO.
Albany,NY 12205 2018088.00 NO SCALE JUNE 2018 4
N
WOODLAWN AVE
I
CO N-Cr,
li vi, I�
7
(86)
55 tAL 37 z
122—) lot
ot t—88
33 +—26
4 o
(27)
+IT 1÷
TO PROJECT
PARKING
AM PEAK HOUR VOLUMES
NOTE:
- (PEDESTRIANS)
N
WOODLAWN AVE
COI`M
ti ti
1-1 viv 1-.
(138)
29—+ 27 z
164— H 4-88 0
11 I" 15 7)
4' E
4—(58)
+I T r'
. co
CO N
TO PROJECT
PARKING
NOTE: PM PEAK HOUR VOLUMES
4 -► (PEDESTRIANS)
Greenman-Pedersen TRAFFIC IMPACT STUDY
CONSULTING ENGINEERS
385 BROAD WAY
GPI MIXED-USE DEVELOPMENT BUILD CONDITION
PEAK HOUR TRAFFIC VOLUMES
80 Wolf Road SARATOGA SPRINGS, NY 12866
Suite 300 JOB NO. SCALE: DATE: FIGURE NO.
Albany,NY 12205 2018088.00 NO SCALE JUNE 2018 5
V. OPERATING CONDITIONS
A. CAPACITY ANALYSIS DESCRIPTION
The operating conditions of transportation facilities are evaluated based on the relationship of
existing or projected traffic volumes to the theoretical capacity of the highway facility. Various
factors affect capacity including traffic volume, travel speed, roadway geometry, grade, number
and width of travel lanes and intersection control. The current standards for evaluating capacity
and operating conditions are contained in the Highway Capacity Manual(HCM 2010), published
by the Transportation Research Board. The procedures describe operating conditions in terms of
Level of Service (LOS). In general, "A" represents the best operating condition with unrestricted
flow and little or no delay per vehicle, and "F" represents the worst, with congested conditions,
long delays and poor traffic operations. LOS C or better is generally desirable, but LOS D for
signalized locations and LOS E for unsignalized are generally acceptable during peak periods as
long as the volume to capacity ratio (v/c) is below 1.0.
Table 2 below presents the LOS criteria for both unsignalized intersections and for pedestrian
crossing movements.
TABLE 2
LEVEL OF SERVICE CRITERIA
Unsignalized Intersection Pedestrian LOS
LOS Control Delay
Delay Per Vehicle(sec.)
(sec./pedestrian)
)
A < 10.0 < 5.0
B
> 10.0 and< 15.0 > 5.0 and < 10.0
C >15.Oand <25.0 >10.Oand <20.0
D
> 25.0 and< 35.0 > 20.0 and< 30.0
E
> 35.0 and< 50.0 > 30.0 and<45.0
F > 50.0 >45.0
It should be noted that the LOS criteria for an unsignalized intersection is reported for the side
street approaches and mainline left turn movement only, as the uncontrolled through and right
turn movements along the mainline are assumed to have a theoretical delay of zero in the HCM
methodology. For the pedestrian level of service, LOS is reported for the uncontrolled crossings
only and assumes random pedestrian arrivals and an even directional and lane distribution. As
vehicles are required to stop for pedestrians when a stop sign is present, pedestrian crossings are
assumed to have a zero delay on stop-sign controlled approaches.
385 Broadway Mixed-Use Development
Traffic Impact Study 10 GPI
July 2018
B. RESULTS OF ANALYSIS
To determine the impact of the proposed development on the operations of the adjacent
transportation system, traffic operations were analyzed for the AM and PM peak hours under
both existing and Build conditions. The traffic operations within the study area for these
conditions are summarized in Table 3 and computation worksheets for each of the analyses are
provided in Appendix B.
TABLE 3
PEAK HOUR LEVEL OF SERVICE SUMMARY
Existing Condition Build Condition
AM
Approach Peak PM Peak AM Peak PM Peak
Intersection (Movement) Hour Hour Hour Hour
Eastbound Left A(8.2) A(8.2) A(8.2) A(8.3)
Westbound Left A(7.8) A(7.9) A(7.7) A(7.8)
Division Street and Northbound B C16.2 B (13.3) C (16.5)
) ( )
Woodlawn Ave/ (13.3)
Site Access Southbound C (21.9) C (15.7) C (22.4)
15.5
( )
Pedestrians
A(4.1) B (5.9) A(4.1) B (5.9)
(West Leg xwalk)
Note: X(XX.X)=Level of Service(delay in seconds per vehicle or pedestrian)
A summary of operations at the studied intersection is as follows:
Division Street and Woodlawn Ave/Site Entrance:
Under existing conditions, this two way stop-controlled intersection operates with the side street
approaches (Woodlawn Ave & Parking Access) both operating at LOS C or better in each of the
peak hours, and with left turns off Division Street operating at LOS A. This continues under the
Build condition (with the proposed development in place). The added traffic from the proposed
development does not cause a change in level of service. As such, no roadway or traffic control
improvements are necessary at this location to maintain acceptable vehicular traffic operations
with the new development.
For pedestrians, the HCM 2010 methodology shows the Division Street crossing at the west leg
of the intersection to operate at LOS A in the morning and LOS B in the evening peak hour for
both the existing and Build conditions. Again, no change in level of service for pedestrians is
expected. It should be noted in the Build condition analysis that all pedestrians crossing Division
Street were assumed to cross only at the west leg crosswalk, even though existing traffic counts
show several illegal crossings both diagonally and across the east leg that has no crosswalk. This
was done to determine the worst-case pedestrian level of service if all people followed the rules
of the road. However, comparing the pedestrian level of service of the existing condition
385 Broadway Mixed-Use Development
Traffic Impact Study 11 GPI
July 2018
VI. FINDINGS AND RECOMMENDATIONS
This study includes an evaluation of the potential traffic impacts caused by the addition of a
mixed-use commercial/residential development at 385 Broadway in the City of Saratoga Springs,
New York. The development is anticipated to consist of 72 rental units, and a first floor
commercial space totaling 8,533 sf. (only 2397 sf that would be new). Findings and
recommendations derived from the analysis include the following:
➢ It is estimated that the proposed development will generate 18 new AM peak hour trips (5
entering & 13 exiting) and 20 new PM peak hour trips (13 entering & 7 exiting), based on
information from ITE's Trip Generation Manual, 10th Edition and other resources.
➢ Level of service analyses were performed at the intersection of Division Street and
Woodlawn Ave / Site Access. These analyses showed that the traffic added due to the
new development produces no change in level of service under build conditions and an
acceptable level of service is maintained in both the AM and PM peak hour with the
development in place.
➢ Field observations noted that there were pedestrians crossing the study area intersection
where there was no defined crosswalk. Adding a second crosswalk on Division Street,
across the east leg on the intersection would help alleviate these illegal pedestrian
crossing maneuvers. This improvement could be made with or without bulbouts to
shorten the crossing distance.
Overall, the analysis indicates that the proposed multi -use development could be added to the
area with parking lot access to Division Street with minimal traffic impacts. The existing
roadway and adjacent intersection can accommodate the proposed development traffic with
no change in geometrics or traffic control being necessary.
385 Broadway Mixed- Use Development
Traffic Impact Study 13
July 2018 GPI
APPENDIX A
TRAFFIC COUNT DATA
385 Broadway Mixed- Use Development
Traffic Impact Study 14 GPI
July 2018
Greenman -Pedersen, Inc.
80 Wolf Road, Suite 300
Albany, NY 12205
518.453.9431
File Name : Division Street at Woodlawn Ave - AM Peak 0700-0900
Site Code : 2018088
Start Date : 5/31/2018
Page No : 1
C'rni inc Printarl- C.ar-q - Tri irkc
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Pack Hni it fnr Pntira Intarcartinn Raninc nt nR-nn Ann
Int. Total
08:00 AM
Woodlawn Ave
From North
Woodlawn Ave
Parking Lot
From South
Division Street
From West
Division Street
Left Th ru Right Peds App.Total
Left Th ru Ri ht Peds App.Total
Parking Lot
Left Th ru Right Peds App. Total
32
Division Street
0
1
4
5
From North
30
3
From
East
119
08:15 AM
From South
1
0
From West
24
7
Start Time
Left
Th ru
Right
Peds
App. Total
Left
Th ru
Right
Peds
App. Total
Left
Th ru
Right
Peds
App. Total
Left
Th ru
Right
Peds
App. Total
Int. Total
07:00 AM
4
0
4
6
14
2
14
5
0
21
1
0
0
3
4
4
22
3
4
33
72
07:15 AM
2
0
6
8
16
1
14
5
0
20
0
0
0
3
3
4
35
2
8
49
88
07:30 AM
5
1
5
13
24
2
11
8
0
21
3
0
3
5
11
5
26
1
11
43
99
07:45 AM
6
0
4
11
21
2
23
12
2
39
1
0
2
6
9
10
41
1
10
62
131
Total
17
1
19
38
75
7
62
30
2
101
5
0
5
17
27
23
124
7
33
187
390
08:00 AM
4
0
2
15
21
3
20
9
0
32
0
0
1
4
5
12
30
3
16
61
119
08:15 AM
2
1
0
21
24
7
14
12
0
33
1
1
0
3
5
8
29
8
15
60
122
08:30 AM
3
2
2
17
24
6
18
11
1
36
1
1
2
11
15
18
25
6
23
72
147
08:45 AM
4
3
2
21
30
7
36
5
0
48
0
0
1
8
9
17
38
15
25
95
182
Total
13
6
6
74
99
23
88
37
1
149
2
2
4
26
34
55
122
32
79
288
570
Grand Total
30
7
25
112
174
30
150
67
3
250
7
2
9
43
61
78
246
39
112
475
960
Apprch %
17.2
4
14.4
64.4
12
60
26.8
1.2
11.5
3.3
14.8
70.5
16.4
51.8
8.2
23.6
Total %
3.1
0.7
2.6
11.7
18.1
3.1
15.6
7
0.3
26
0.7
0.2
0.9
4.5
6.4
8.1
25.6
4.1
11.7
49.5
Cars
29
7
24
110
170
30
146
66
3
245
7
2
8
42
59
77
233
39
111
460
934
% Cars
96.7
100
96
98.2
97.7
100
97.3
98.5
100
98
100
100
88.9
97.7
96.7
98.7
94.7
100
99.1
96.8
97.3
Trucks
1
0
1
2
4
0
4
1
0
5
0
0
1
1
2
1
13
0
1
15
26
% Trucks
3.3
0
4
1.8
2.3
0
2.7
1.5
0
2
0
0
11.1
2.3
3.3
1.3
5.3
0
0.9
3.2
2.7
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Pack Hni it fnr Pntira Intarcartinn Raninc nt nR-nn Ann
Int. Total
08:00 AM
Woodlawn Ave
From North
Division Street
From East
Parking Lot
From South
Division Street
From West
Start Time
Left Th ru Right Peds App.Total
Left Th ru Ri ht Peds App.Total
Left Th ru Riht Peds App. Total
Left Th ru Right Peds App. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Pack Hni it fnr Pntira Intarcartinn Raninc nt nR-nn Ann
Int. Total
08:00 AM
4
0
2
15
21
3
20
9
0
32
0
0
1
4
5
12
30
3
16
61
119
08:15 AM
2
1
0
21
24
7
14
12
0
33
1
1
0
3
5
8
29
8
15
60
122
08:30 AM
3
2
2
17
24
6
18
11
1
36
1
1
2
11
15
18
25
6
23
72
147
08:45 AM
4
3
2
21
30
7
36
5
0
48
0
0
1
8
9
17
38
15
25
95
182
Total volume
13
6
6
74
99
23
88
37
1
149
2
2
4
26
34
55
122
32
79
288
570
% App. Total
13.1
6.1
6.1
74.7
15.4
59.1
24.8
0.7
5.9
5.9
11.8
76.5
19.1
42.4
11.1
27.4
PHF
.813
.500
.750
.881
.825
.821
.611
.771
.250
.776
.500
.500
.500
.591
.567
.764
.803
.533
.790
.758
.783
Divi siren St an d Wood I awn Ave
Start Time Diagonal Peds
7: 00 A M
7:15 AM 4
7:30 AM 4
7:45 AM 1
8: 00 A M
8:15 AM
8:30 AM
8:45 AM 2
2
Greenman -Pedersen, Inc.
80 Wolf Road, Suite 300
Albany, NY 12205
518.453.9431
File Name : Division Street at Woodlawn Ave - PM Peak 1600-1800
Site Code : 201088
Start Date : 5/31/2018
Page No : 1
('rni inc Prinfind- (;arc - Tri irkc
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
PAak Hni it fnr Pntira Intimmortinn Rarninc at nA.-gn PKA
Int. Total
04:30 PM
Woodlawn Ave
From North
Woodlawn Ave
Parking Lot
From South
Division Street
From West
Division Street
Left Th ru Right Peds A . Total
Left Th ru ERi ht Peds App.Total
Parking Lot
Left Th ru Right Peds App. Total
36
Division Street
1
6
7
18
From North
37
1
From
East
175
04:45 PM
From South
1
10
From West
45
2
Start Time
Left
Th ru
Right
Peds
App. Total
Left
Th ru
Right
Peds
App. Total
Left
Th ru
Right
Peds
App. Total
Left
Th ru
Right
Peds
App. Total
Int. Total
04:00 PM
15
1
22
30
68
0
27
5
3
35
4
0
5
4
13
10
37
6
24
77
193
04:15 PM
9
3
10
18
40
3
12
7
3
25
4
1
4
9
18
10
37
5
11
63
146
04:30 PM
22
1
18
23
64
2
24
9
1
36
4
1
6
7
18
4
37
1
15
57
175
04:45 PM
14
1
10
20
45
2
20
7
4
33
2
2
4
7
15
8
51
4
21
84
177
Total
60
6
60
91
217
7
83
28
11
129
14
4
19
27
64
32
162
16
71
281
691
05:00 PM
23
1
24
36
84
2
26
4
2
34
6
2
8
18
34
9
52
2
26
89
241
05:15 PM
14
1
18
27
60
2
18
7
1
28
5
1
5
18
29
8
24
1
20
53
170
05:30 PM
10
0
8
26
44
2
26
7
2
37
3
0
3
18
24
5
26
1
17
49
154
05:45 PM
14
0
22
18
54
9
17
5
0
31
5
2
4
32
43
7
28
5
13
53
181
Total
61
2
72
107
242
15
87
23
5
130
19
5
20
86
130
29
130
9
76
244
746
Grand Total
121
8
132
198
459
22
170
51
16
259
33
9
39
113
194
61
292
25
147
525
1437
Apprch %
26.4
1.7
28.8
43.1
8.5
65.6
19.7
6.2
17
4.6
20.1
58.2
11.6
55.6
4.8
28
Total %
8.4
0.6
9.2
13.8
31.9
1.5
11.8
3.5
1.1
18
2.3
0.6
2.7
7.9
13.5
4.2
20.3
1.7
10.2
36.5
Cars
121
8
132
194
455
22
170
51
16
259
33
9
39
106
187
61
291
25
147
524
1425
% Cars
100
100
100
98
99.1
100
100
100
100
100
100
100
100
93.8
96.4
100
99.7
100
100
99.8
99.2
Trucks
0
0
0
4
4
0
0
0
0
0
0
0
0
7
7
0
1
0
0
1
12
% Trucks
0
0
0
2
0.9
0
0
0
0
0
0
0
0
6.2
3.6
0
0.3
0
0
0.2
0.8
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
PAak Hni it fnr Pntira Intimmortinn Rarninc at nA.-gn PKA
Int. Total
04:30 PM
Woodlawn Ave
From North
Division Street
From East
Parking Lot
From South
Division Street
From West
Start Time
Left Th ru Right Peds A . Total
Left Th ru ERi ht Peds App.Total
Left Th ru Riht Peds App. Total
Left Th ru Right Peds App. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
PAak Hni it fnr Pntira Intimmortinn Rarninc at nA.-gn PKA
Int. Total
04:30 PM
22
1
18
23
64
2
24
9
1
36
4
1
6
7
18
4
37
1
15
57
175
04:45 PM
14
1
10
20
45
2
20
7
4
33
2
2
4
7
15
8
51
4
21
84
177
05:00 PM
23
1
24
36
84
2
26
4
2
34
6
2
8
18
34
9
52
2
26
89
241
05:15 PM
14
1
18
27
60
2
18
7
1
28
5
1
5
18
29
8
24
1
20
53
170
Total volume
73
4
70
106
253
8
88
27
8
131
17
6
23
50
96
29
164
8
82
283
763
% App. Total
28.9
1.6
27.7
41.9
6.1
67.2
20.6
6.1
17.7
6.2
24
52.1
10.2
58
2.8
29
PHF
.793
1.00
.729
.736
.753
1.00
.846
.750
.500
.910
.708
.750
.719
.694
.706
.806
.788
.500
.788
.795
.791
Division St and Wood Iawn Aleve
Start Time Diagonal Peds
4:00 PM 5
4:15 PM
4:30 P M 7
4:45 P M 4
5:00 PM 5
5:15 PM g
5:30 P M
5:45 P M 2
7
h t- p s..,..'-Qvwvr.wa Iksco•re.com/scolre/385a-broladway-saratoga-springs-ny-12966
385 Broadway
IF'P
'.07
Saratoga Springs, New York, 12866
C o m rn ute to Down -tow n Sara -toga Sp r ings
eQ6 I rn i n 2 min Vb I rain, 3 min LutesView tes
8
IZ)- Favorite [IIJ M a p Q� Nearby Apartments I
Looking for a home r -sale in Saratoga Springs? 9
r- Walk, Scure -)I Walker's Paradise
911 Daily errands do not require a
car_
I ITrau:,g -Sc are, Some Transit
34 A few nearby public
L... transportation options_
Aboutyour score
Add scores to your site
Dc- r� R C- tes with Le n d i ngTree Novi oP
About this Location
pan -0
Googli
385 Broadway has a Walk Score of 98 out of
100- This location is a Walker's Paradise so
daily �rrands do not regU ire a car.
This location i s i n Sa ratoga Sp ri ngs. Nearby
Darks include Congress Park, West Side
Recreation Sa ratoga Sp ri ngs Ny and H igh
Rock Park.
CMMW�t
ul#
d VC
'Hill A
dd. 4 A- rq
k
M :PC LPI
-4
C- °$•f
Dc- r� R C- tes with Le n d i ngTree Novi oP
About this Location
pan -0
Googli
385 Broadway has a Walk Score of 98 out of
100- This location is a Walker's Paradise so
daily �rrands do not regU ire a car.
This location i s i n Sa ratoga Sp ri ngs. Nearby
Darks include Congress Park, West Side
Recreation Sa ratoga Sp ri ngs Ny and H igh
Rock Park.
Excerpt below is from the Traffic Impact Study conducted for the Plaza Residential Mixed -Use
Development, 330 4t" Street, Kirkland, WA, prepared by Transportation Solutions, Inc., February 2017
Trip Generation
Micro -Apartment Land Use; Arete Trip Generation
Trip generation for the proposed micro -apartment use was forecast using existing vehicle trip
generation information collected at the neighboring Arete site. Kirkland staff approved the scope of
the data collection and methodology.
Arete, located adjacent to the Project, includes 228 micro -apartments (also known as residential
suites), 62 apartment units and 8,500 square feet of commercial space. A post -occupancy resident
and visitor vehicle trip generation study was documented in August 2016 for Arete as a basis to
compute the Arete's traffic impact fees and a follow-up analysis was completed in January 2017 to
forecast trip generation for the Project's micro -apartments.
Vehicle trips in and out of Arete were collected by Traffic Count Consultants, Inc. from Tuesday to
Thursday (August 2 -August 4, 2016) between 4 and 6 PM, from Tuesday to Thursday (January 24 -
January 26, 2017) between 7 and 9 AM, and on Wednesday, January 25, 2017 between 4 and 6 PM.
In August 2016 vehicle trips were collected at Arete's lower -garage off 4th Ave. For the January 2017
counts, vehicle trips were collected at Arete's lower -garage and upper -garage off Central Way. The
site's upper -garage, off Central Way, was not open during the August 2016 data collection.
Arete's tenants are required to sign an affidavit to register their vehicle(s) and are required to park on
site. Vehicles are issued either a "blue" sticker, for resident tenants, or a "green" sticker, for
commercial employees, to place on their vehicle(s). Tenant parking for both residents and commercial
employees is in the lower -garage. The upper -garage is for commercial visitors. The Applicant manages
their onsite parking by: providing tenants ORCA cards, outsourcing with Diamond Parking to identify
parking violations in the neighborhood, and issuing citations for tenant parking violations.
Visitor trips (vehicles with no sticker) vary from day to day. Visitor trips are included with the
total resident trip generation data summarized in Table 1. Visitors trips were not tracked to
determine whether they were a resident -visitor or commercial -visitor.
Table 1: Trip Generation Study; Summary of Data
Collection
Count Date
8/2/2016 8/3/2016 8/4/2016 1/24/2017 1/25/2017 1/26/2017
AM Peak Trips
- - - 40 39 36
Occu pa n cy2
- - - 95.5% 95.5% 95.5%
AM Average
- 37
PM Peak Trips
33 38 29 - 36 -
Occupancy2
92.4% 92.4% 92.4% - 95.5% -
PM Average
33 36
1. Resident trips plus Visitor trips
2. Resident unit (apartments and micro -apartments) occupancy at the time of the study, from Arete Management
3. 3 -day average AM and PM peak hour trips
Page 1 of 2
Table 2 summarizes methodology used to forecast trip rate for the micro -apartment land use.
Micro- apartments generate: 0.14 AM peak hour trips per unit and 0.13 PM peak hour trips per unit.
Table 2: Residential Suite Land Use Trip Rate
1. Resident unit occupancies provided by Arete Management
2. Peak hour vehicle trip data from Table 2. AM data was not collected in the 2016.
3. Trips assigned to the apartment and micro -apartment uses based on the ratio of occupied units.
4. Trips adjusted for full occupancy of the site
5. (Micro -Apartment adjusted trips) = (228 total residential units)
The daily rate for micro -apartments is based on the average ratios of (ITE) daily low-rise apartment
trip rate to (ITE) AM Low -Rise Apartment trip rate multiplied by the AM micro -apartment trip rate
and (ITE) daily low-rise apartment trip rate to (ITE) PM Low -Rise Apartment trip rate multiplied by
the PM micro- apartment trip rate and. The daily micro -apartment trip rate is forecast as 1.74 daily
trips per unit (_ ((6.59: 0.46 x 0.14) + (6.59: 0.58 x 0.13)) . 2).
Page 2of2
Total
Units
2016
Occupied
Units'
2016
Trip
Count2-3
Trip Adjust.
for Unit
Occupancy4
2017
Occupied
Units'
2017
Trip
Count 2,3
Trip Adjust.
for Unit
Occupancy
Total
290
272
37
40
Apartments
62
52
7
8
Resident Suite
1 228
220
30
31
Resident Suite AM Trip Rates
0.14
Total 290
268
33
36
272
36
38
Apartments 62
55
7
8
52
7
8
Resident Suite 1 228
213
26
28
220
29
30
Resident Suite PM Trip Rates
0.12
1
1 0.13
1. Resident unit occupancies provided by Arete Management
2. Peak hour vehicle trip data from Table 2. AM data was not collected in the 2016.
3. Trips assigned to the apartment and micro -apartment uses based on the ratio of occupied units.
4. Trips adjusted for full occupancy of the site
5. (Micro -Apartment adjusted trips) = (228 total residential units)
The daily rate for micro -apartments is based on the average ratios of (ITE) daily low-rise apartment
trip rate to (ITE) AM Low -Rise Apartment trip rate multiplied by the AM micro -apartment trip rate
and (ITE) daily low-rise apartment trip rate to (ITE) PM Low -Rise Apartment trip rate multiplied by
the PM micro- apartment trip rate and. The daily micro -apartment trip rate is forecast as 1.74 daily
trips per unit (_ ((6.59: 0.46 x 0.14) + (6.59: 0.58 x 0.13)) . 2).
Page 2of2
APPENDIX B
CAPACITY ANALYSIS WORKSHEETS
385 Broadway Mixed- Use Development
Traffic Impact Study 15 GPI
July 2018
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Exising AM Peak
Intersection
Int Delay, s/veh 2.8
Movement EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
41�
4�
4+
Traffic Vol, vehlh 55
122
32
23
88
37
2
2
4
13
6
6
Future Vol, vehlh 55
122
32
23
88
37
2
2
4
13
6
6
Conflicting Peds, #Ihr 74
0
37
26
0
85
90
0
1
12
0
79
Sign Control Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized -
-None
-
-None
-
-None
-
-None
Storage Length -
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, # -
0
-
-
0
-
-
0
-
-
0
-
Grade, % -
0
-
-
0
-
-
0
-
-
0
-
Peak Hour Factor 79
79
79
79
79
79
79
79
79
79
79
79
Heavy Vehicles, % 1
5
1
1
3
2
1
1
11
3
1
4
Mvmt Flow 70
154
41
29
111
47
3
3
5
16
8
8
_
Major/Minor Major1
Major2
Minor1
Minor2
Conflicting Flow All 243
0
0
232
0
0
642
652
224
608
649
310
Stage -
-
-
-
-
-
351
351
-
278
278
-
Stage 2 -
-
-
-
-
-
291
301
-
330
371
-
Critical Hdwy 4.11
-
-
4.11
-
-
7.11
6.51
6.31
7.13
6.51
6.24
Critical Hdwy Stg 1 -
-
-
-
-
-
6.11
5.51
-
6.13
5.51
-
Critical Hdwy Stg 2 -
-
-
-
-
-
6.11
5.51
-
6.13
5.51
-
Follow-up Hdwy 2.209
-
-
2.209
-
-
3.509
4.009
3.399
3.527
4.009
3.336
Pot Cap -1 Maneuver 1329
-
-
1342
-
-
388
388
794
406
390
725
Stage -
-
-
-
-
-
668
634
-
726
682
-
Stage 2 -
-
-
-
-
-
719
667
-
681
621
-
Platoon blocked, %
-
-
-
-
Mov Cap -1 Maneuver 1206
-
-
1325
-
-
308
317
759
342
319
609
Mov Cap -2 Maneuver -
-
-
-
-
-
308
317
-
342
319
-
Stage 1 -
-
-
-
-
-
604
574
-
628
616
-
Stage 2 -
-
-
-
-
-
621
603
-
622
562
-
Approach EB
WB
NB
SB
HCM Control Delay, s 2.1
1.2
13.3
15.5
HCM LOS
B
C
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
EBR
WBL
WBT
WBR SBLn1
Capacity (vehlh)
443
1206
-
-
1325
-
-
375
_
HCM Lane V/C Ratio
0.023
0.058
-
-
0.022
-
-
0.084
HCM Control Delay (s)
13.3
8.2
0
-
7.8
0
-
15.5
_
HCM Lane LOS
B
A
A
-
A
A
-
C
HCM 95th %tile Q(veh)
0.1
0.2
-
-
0.1
-
-
0.3
_
385 Broadway Traffic Study
Synchro 9 Report
GPI
Page 1
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Exising AM Peak
Approach
Approach Direction EB
Median Present? No
Approach Delay(s) 4.1
Level of Service A
Crosswalk
Length (ft)
38
Lanes Crossed
2
Veh Vol Crossed
210
Ped Vol Crossed
90
Yield Rate(%)
25
Ped Platooning
No
Critical Headway (s)
13.86
Prob of Delayed X-ing
0.55
Prob of Blocked Lane
0.33
Delay for adq Gap
13.48
Avg Ped Delay (s)
4.14
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 4.1
Level of Service A
Crosswalk
Length (ft)
38
Lanes Crossed
2
Veh Vol Crossed
210
Ped Vol Crossed
1
Yield Rate(%)
10
Ped Platooning
No
Critical Headway (s)
13.86
Prob of Delayed X-ing
0.55
Prob of Blocked Lane
0.33
Delay for adq Gap
13.48
Avg Ped Delay (s)
4.14
t
t
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Existing PM Peak
Intersection
Int Delay, s/veh 8.3
Movement EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
c
Traffic Vol, vehlh 29
164
8
8
88
27
17
6
23
73
4
70
Future Vol, vehlh 29
164
8
8
88
27
17
6
23
73
4
70
Conflicting Peds, #Ihr 106
0
74
50
0
130
106
0
8
32
0
82
Sign Control Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized -
-None
-
-None
-
-None
-
-None
Storage Length -
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, # -
0
-
-
0
-
-
0
-
-
0
-
Grade, % -
0
-
-
0
-
-
0
-
-
0
-
Peak Hour Factor 80
80
80
80
80
80
80
80
80
80
80
80
Heavy Vehicles, % 1
1
1
1
1
1
1
1
1
1
1
1
Mvmt Flow 36
205
10
10
110
34
21
8
29
91
5
88
_
Major/Minor Major1
Major2
Minor1
Minor2
Conflicting Flow All 274
0
0
289
0
0
656
651
316
610
639
363
Stage -
-
-
-
-
-
357
357
-
277
277
-
Stage 2 -
-
-
-
-
-
299
294
-
333
362
-
Critical Hdwy 4.11
-
-
4.11
-
-
7.11
6.51
6.21
7.11
6.51
6.21
Critical Hdwy Stg 1 -
-
-
-
-
-
6.11
5.51
-
6.11
5.51
-
Critical Hdwy Stg 2 -
-
-
-
-
-
6.11
5.51
-
6.11
5.51
-
Follow-up Hdwy 2.209
-
-
2.209
-
-
3.509
4.009
3.309
3.509
4.009
3.309
Pot Cap -1 Maneuver 1295
-
-
1279
-
-
380
389
727
408
395
684
Stage -
-
-
-
-
-
663
630
-
732
683
-
Stage 2 -
-
-
-
-
-
712
671
-
683
627
-
Platoon blocked, %
-
-
-
-
Mov Cap -1 Maneuver 1153
-
-
1237
-
-
253
308
658
317
313
540
Mov Cap -2 Maneuver -
-
-
-
-
-
253
308
-
317
313
-
Stage 1 -
-
-
-
-
-
598
568
-
626
600
-
Stage 2 -
-
-
-
-
-
522
589
-
601
565
-
Approach EB
WB
NB
SB
HCM Control Delay, s 1.2
0.5
16.2
21.9
HCM LOS
C
C
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
EBR
WBL
WBT
WBR SBLn1
Capacity (vehlh)
378
1153
-
-
1237
-
-
394
_
HCM Lane V/C Ratio
0.152
0.031
-
-
0.008
-
-
0.466
HCM Control Delay (s)
16.2
8.2
0
-
7.9
0
-
21.9
_
HCM Lane LOS
C
A
A
-
A
A
-
C
HCM 95th %tile Q(veh)
0.5
0.1
-
-
0
-
-
2.4
_
385 Broadway Traffic Study
Synchro 9 Report
GPI
Page 1
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Existing PM Peak
Approach
Approach Direction EB
Median Present? No �
Approach Delay(s) 5.9
Level of Service B
Crosswalk
Length (ft)
38
Lanes Crossed
2
Veh Vol Crossed
252
Ped Vol Crossed
106
Yield Rate(%)
25
Ped Platooning
No
Critical Headway (s)
13.86
Prob of Delayed X-ing
0.62
Prob of Blocked Lane
0.38
Delay for adq Gap
15.37
Avg Ped Delay (s)
5.92
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 5.9
Level of Service B
Crosswalk
Length (ft)
38
Lanes Crossed
2
Veh Vol Crossed
252
Ped Vol Crossed
8
Yield Rate(%)
10
Ped Platooning
No
Critical Headway (s)
13.86
Prob of Delayed X-ing
0.62
Prob of Blocked Lane
0.38
Delay for adq Gap
15.37
Avg Ped Delay (s)
5.92
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition AM Peak
Intersection 91
Int Delay, s/veh 3.2
Movement EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
41�
4+
4+
Traffic Vol, vehlh 55
122
33
26
88
37
5
5
11
13
7
6
Future Vol, vehlh 55
122
33
26
88
37
5
5
11
13
7
6
Conflicting Peds, #Ihr 86
0
27
27
0
86
91
0
0
0
0
91
Sign Control Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized -
-None
-
-None
-
-None
-
-None
Storage Length -
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage, # -
0
-
-
0
-
-
0
-
-
0
-
Grade, % -
0
-
-
0
-
-
0
-
-
0
-
Peak Hour Factor 79
79
79
79
79
79
79
79
79
79
79
79
Heavy Vehicles, % 1
5
1
1
3
2
1
1
11
3
1
4
Mvmt Flow 70
154
42
33
111
47
6
6
14
16
9
8
_
Major/Minor Major1
Major2
Minor1
Minor2
Conflicting Flow All 244
0
0
223
0
0
642
652
202
612
649
312
Stage -
-
-
-
-
-
342
342
-
287
287
-
Stage 2 -
-
-
-
-
-
300
310
-
325
362
-
Critical Hdwy 4.11
-
-
4.11
-
-
7.11
6.51
6.31
7.13
6.51
6.24
Critical Hdwy Stg 1 -
-
-
-
-
-
6.11
5.51
-
6.13
5.51
-
Critical Hdwy Stg 2 -
-
-
-
-
-
6.11
5.51
-
6.13
5.51
-
Follow-up Hdwy 2.209
-
-
2.209
-
-
3.509
4.009
3.399
3.527
4.009
3.336
Pot Cap -1 Maneuver 1328
-
-
1352
-
-
388
388
816
404
390
724
Stage 1 -
-
-
-
-
-
675
640
-
718
676
-
Stage 2 -
-
-
-
-
-
711
661
-
685
627
-
Platoon blocked, %
-
-
-
-
Mov Cap -1 Maneuver 1203
-
-
1352
-
-
309
318
797
336
320
607
Mov Cap -2 Maneuver -
-
-
-
-
-
309
318
-
336
320
-
Stage 1 -
-
-
-
-
-
616
584
-
620
608
-
Stage 2 -
-
-
-
-
-
610
595
-
622
572
-
Approach EB
WB
NB
SB
HCM Control Delay, s 2.1
1.3
13.3
15.7
HCM LOS
B
C
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
EBR
WBL
WBT
WBR SBLn1
Capacity (vehlh)
459
1203
-
-
1352
-
-
369
_
HCM Lane V/C Ratio
0.058
0.058
-
-
0.024
-
-
0.089
HCM Control Delay (s)
13.3
8.2
0
-
7.7
0
-
15.7
_
HCM Lane LOS
B
A
A
-
A
A
-
C
HCM 95th %tile Q(veh)
0.2
0.2
-
-
0.1
-
-
0.3
_
385 Broadway Traffic Study
Synchro 9 Report
GPI
Page 1
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition AM Peak
Approach
Approach Direction EB
Median Present? No
Approach Delay(s) 4.1
Level of Service A
Crosswalk
Length (ft)
38
Lanes Crossed
2
Veh Vol Crossed
210
Ped Vol Crossed
91
Yield Rate(%)
25
Ped Platooning
No
Critical Headway (s)
13.86
Prob of Delayed X-ing
0.55
Prob of Blocked Lane
0.33
Delay for adq Gap
13.48
Avg Ped Delay (s)
4.14
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 0.0
Level of Service A
Crosswalk
Length (ft)
0
Lanes Crossed
2
Veh Vol Crossed
210
Ped Vol Crossed
0
Yield Rate(%)
10
Ped Platooning
No
Critical Headway (s)
0.00
_
Prob of Delayed X-ing
0.00
Prob of Blocked Lane
0.00
_
Delay for adq Gap
0.00
Avg Ped Delay (s)
0.00
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition PM Peak Hour
Intersection
Int Delay, slveh
Movement
8.6
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
0
277
0 0
669
c
270
608
651
379
Stage -
-
Traffic Vol, vehlh
29
164
11
15
88
27
19
8
26
73
7
70
Future Vol, vehlh
29
164
11
15
88
27
19
8
26
73
7
70
Conflicting Peds, #Ihr
138
0
58
58
0
138
114
0
0
0
0
114
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
-
-None
5.51
-
-None
Follow-up Hdwy 2.209
-
-None
2.209
-
-None
4.009
Storage Length
-
-
-
-
-
-
-
-
-
-
-
-
Veh in Median Storage,
# -
0
-
-
0
-
-
0
-
-
0
-
Grade, %
-
0
-
-
0
-
-
0
-
-
0
-
Peak Hour Factor
80
80
80
80
80
80
80
80
80
80
80
80
Heavy Vehicles, %
1
1
1
1
1
1
1
1
1
1
1
1
Mvmt Flow
36
205
14
19
110
34
24
10
33
91
9
88 _
Major/Minor Major1
Major2
Minor1
Minor2
Conflicting Flow All 282
0
0
277
0 0
669
661
270
608
651
379
Stage -
-
-
-
- -
342
342
-
302
302
-
Stage 2 -
-
-
-
- -
327
319
-
306
349
-
Critical Hdwy 4.11
-
-
4.11
- -
7.11
6.51
6.21
7.11
6.51
6.21
Critical Hdwy Stg 1 -
-
-
-
- -
6.11
5.51
-
6.11
5.51
-
Critical Hdwy Stg 2 -
-
-
-
- -
6.11
5.51
-
6.11
5.51
-
Follow-up Hdwy 2.209
-
-
2.209
- -
3.509
4.009
3.309
3.509
4.009
3.309
Pot Cap -1 Maneuver 1286
-
-
1292
- -
373
384
771
409
389
670
Stage -
-
-
-
- -
675
640
-
709
666
-
Stage 2 -
-
-
-
- -
688
655
-
706
635
-
Platoon blocked, %
-
-
- -
Mov Cap -1 Maneuver 1135
-
-
1292
- -
244
304
732
322
308
520
Mov Cap -2 Maneuver -
-
-
-
- -
244
304
-
322
308
-
Stage 1 -
-
-
-
- -
618
586
-
601
576
-
Stage 2 -
-
-
-
- -
489
567
-
639
581
-
Approach EB
WB
NB
SB
HCM Control Delay, s 1.2
0.9
16.5
22.4
HCM LOS
C
C
Minor Lane/Major Mvmt
NBLn1
EBL
EBT
EBR WBL
WBT
WBR SBLn1
Capacity (vehlh)
379
1135
-
- 1292
-
-
391
HCM Lane V/C Ratio
0.175
0.032
-
- 0.015
-
-
0.48
HCM Control Delay (s)
16.5
8.3
0
- 7.8
0
-
22.4
_
HCM Lane LOS
C
A
A
- A
A
-
C
HCM 95th %tile Q(veh)
0.6
0.1
-
- 0
-
-
2.5
_
385 Broadway Traffic Study
Synchro 9 Report
GPI