Loading...
HomeMy WebLinkAbout20210989 Stewart's Site Plan Correspondance ����� � � � �� ��� December 10, 2021 Debbie La6reche, City Engineer City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 Re: Stewa rts-4 La ke Site Pla n review- Engineering Review-first comment letter P B#20210989 PO#210456 File: 539.063.001 Dear Ms. LaBreche: Barton & Loguidice, D.P.C. (B&L) has completed a review of the following reports and information for the Stewa rts Site Pla n, prepa red by Stewa rts: • Application for Site Plan Review with Application Checklist; • Plan Set (7 Sheets). This review was conducted on behalf of the City of Saratoga Springs.The above referenced documents and information were reviewed only with respect to our scope outlined in our task order/proposal. General 1. Please provide a brief project narrative that summarizes project site plan statistics, water demand and sewer service, water service application, stormwater management system, emergency fuel spill protections/system, complete streets checklist, and other pertinent information 2. Will existing water and sewer laterals be utilized? Is a water service connection agreement with the city required? 3. The plans lack detail for grading, drainage and utilities. Please advance plans and re-submit with all information that a contractor would require to construct it. Plans seem to be in a concept phase. SEAF 1. Please provide a digital file to Barton & Loguidice to e-mail b�rantC�bartonandlo�uidice.com. T,�e ex,��ri�r�ce�� . ������ �"h�pow����a 10 Airline Drive,Suite 200,Albany,NY 12205■ Office:518-218-1801 ■Fax:518-218-1805■ BartonandLoguidice.com �����' � Debbie La6reche, City Engineer City of Saratoga Springs � December 10, 2021 �� Page 2 Water and Sanitary Sewer 1. Are existing service and lateral being utilized?Will any abandonment of existing utilities be proposed? 2. What is status of 0.367 acres of land conveyance and easements with the Andersons? 3. The narrative requested should outline the construction sequencing of the construction of the new store and parking/access/egress of existing store if planned to remain open during construction that emphasizes safety with appropriate planning and signage. 4. What is status of submission and approval of new easterly driveway orientation and signal changes by NYSDOT regarding NYS Route 29? 5. Provide a sign for refuse pick-up that prohibits refuse pick-up between the hours of 7 PM to 7AM to limit load noises to adjacent properties at night. Cost estimate for letter of Credit 1. Please provide a cost estimate for letter of credit. SWPPP 1. No SWPPP or erosion and sediment control plan were submitted. What is the proposed plan from gutters at building to discharge? Plans T-1-Title Sheet/Elevations 1. Show gutters, downspouts and ice machine on elevations. Existing Site Plan-Existing Site Plan 1. What is the status of the existing well shown near the southwest corner of the site? Is this an active well and how far is it from the proposed southerly fuel canopy? S-2-Proposed Site Plan 1. What is proposed for barrier and/or signage at new end of driveway pavement in new Anderson easement on west side of new store? 2. A separate plan to show construction sequencing is recommended. 3. Remove reference to City of Albany project in note 20 and include note that city engineer's office may wish to inspect stormwater basin. 4. Label spillways, provide elevations and reference to detail. S-6-Photometric Plan 1. Seems adequate. What KVA lighting is proposed at canopy and was that the basis for plan for this site? Debbie La6reche, City Engineer City of Saratoga Springs � December 10, 2021 �� Page 3 C-3,S-4 and S-5 1. The plan set skips sheets between S-2A and S-6. Please submit full set including grading plan. S-7—Vehicle routing Plan 1. Provide routing for refuse pick-up trucks. Please provide details for drainage proposed, handicap signage, handicap space layout/signage and dumpster enclosure/concrete slab that extends out and will support front tires of dynamic and dead loads of garbage trucks. If you have any questions, please feel free to contact our office. Sincerelyyours, BARTON &LOGUIDICE, D.P.C. - , . ! �` 4 Bradley D. Grant Senior Project Manager BDG/tms Cc: via e-mail Kari Donohue Matt Zeno