Loading...
HomeMy WebLinkAbout20220358 3 Ohonte Way Subdivsion Review Application **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** [FOR OFFICE USE1 �pAT°GA SryA� CITY OF SARATOGA SPRINGS (Application#) r © PLANNING BOARD r CITY HALL-474 BROADWAY (Date received) SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 �cDRP°anT�o 95 www.saratoga-springs.org (Project Title) Staff Review APPLICATION FOR: SITE PLAN REVIEW (INCLUDING PUD) **Application Check List-All submissions must include completed application check list and all required items.** Property 3 Ohonte Way y Tax Parcel #: 191 •-2-43.13 Zoning District. (for example: 165.52-4-37) Project Description: &W4 ^ -T !3MI ur r^ c% i ^ nn^ " — I CA I I I I I Y-1 V�-� %3 1 %.A ILf I I %.J ILf Date special use permit granted (if any): Date zoning variance granted (if any): Has a previous application been filed with PB for this property?: FINO ✓ YES If YES, include Application TYPE Subdivision Approval and DATE: 6/10/15 Is property located within (check all that apply)?: ❑ Historic District ❑ Architectural Review District Q 500' of a State Park, city boundary, or county/state highway APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT Name Ryan McLaughlin Jesse Boucher Address 4545 Center Blvd, Apt 2920 11109 PO Box 657 12866 Phone (516) 776-5944 518-281 -7967 Email ryanpmclaughlinl2@gmail.com Jesse@KodiakofSaratoga.com Identify primary contact person: ❑ Applicant ❑ Owner III Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Revised 1/2021 City of Saratoga Springs-Site Plan Review Application 1 REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital copy of ALL materials Application Fee: Make checks payable to the "Commissioner of Finance". REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Check City's website (www.saratoga-springs.org)for meeting dates. Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO . If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan Review by the Planning Board for the identified property above. I agree to meet all requirements under Section 240-7.2 of the Zoning Ordinance of the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Applicant Signature: / Date: 04/11/2022 If applicant is not current owner, owner must also sign. Owner Signature: Date: City of Saratoga Springs-Site Plan Review Application 2 �P NTOG_q CITY OF SARATOGA SPRINGS f PLANNING BOARD 7 CITY HALL-474 BROADWAY v .• SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 ORPORAM �9 www.saratoga-springs.org SITE PLAN REVIEW SUBMITTAL CHECKLIST Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Zoning Ordinance Appendix B. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital copy of ALL materials CHECK EACH ITEM © 1. Completed Site Plan Application (3 hard copies-*1 w/original signature - and 1 digital) and Fee V1 2. SEAR Environmental Assessment Form- short or long form as required by action. © 3. Set of plans including: (3) large scale plans (sheets must be 24"x 36", drawn to a scale of not more than 1"=50 feet). One digital version (PDF) of all submittal items printable to scale 4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242. ❑ 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary 7. Complete Streets Checklist ❑ 8. Project Cost Estimate for Letter of Credit (Utilize City Template) REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: 1. Property line survey prepared by a licensed land surveyor. Site plan must reference such V1 survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. © 2. North arrow and map scale V1 3. Parcel tax map number 4. Site location map (with title block and map key) 5. Incorporate the City's standard engineering details City of Saratoga Springs Site Plan Checklist 1 6. Site vicinity map (all features within 300 feet of property) © 7. Identification of zoning district with corresponding area requirements 8. Building setback lines, either listed or shown on plans. 9. Title block with project name; name and address of applicant; and name and address of property owner(if different) 10. Project Name 11. Name of all adjacent property owners within 300 feet (Include both sides of street) Q 12. Parcel street address (existing and any proposed postal addresses) Yes No NSA 13. Identification of all existing or proposed easements, covenants or legal rights-of-way on this 0 �❑ 0 property 1 14. References to all prior variances or special use permits 0 FE] F—�] 15. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary 0 IF-1 F� 16. Identification of all spoil, borrow, storage, or staging areas © 17. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains, rock outcroppings, etc. 0 JF� F1 18. Erosion and sediment control plan —including designated concrete truck washout area 19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition) 20. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) ® 21. Location and distance to fire hydrant 0 Jr-1 FJ 22. Identify size, material, elevations and slopes of all existing and proposed utilities with 400' of site 11 11 0 23. Parking lot layout plan and identification of all loading areas (number all spaces) 0 JEJ 0 24. Parking demand calculations �❑ 0 25. Identification of parking spaces and access points for physically impaired persons ® 26. Location and screening plan for dumpster or recycling bins 27. Location, design, type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site including finish floor elevations to nearest tenth foot. ® 28. Identification of storage of any potentially hazardous materials 29. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. 30. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures Checklist prepared by.JeSSe Boucher Date.04/11 /22 City of Saratoga Springs Site Plan Checklist 2 2021 LAND USE BOARD FEE WORKSHEET OPED Fees Type 2021 Fee Application to Zoning Board ofAppeals[1][2] TOTAL #VARIANCE Use Variance $1100+$50/app Area Variance-Residential $275/var+$50/app+$125 eachadd'I variance Area Variance-Multi-Family,Comm,Mixed-Use $660/var+$50/app+$200 each add'I variance Interpretations $550+$50/app Post-Work Application Fee Add 50%App fee+$50/app Variance extensions 50%ofApp fee+$50/app Application to Design Review Commission[1] TOTAL #STRUCTURE Demolition $385 Residential Structures Principal $55 Accessory $55 Extension $35 Modification $55 Multi-Family,Comm,Mixed-Use Structures Sketch $165 Principal $550 Extension $200 Modification $330 Multi-Family,Comm,Mixed-Use Accessory,Signs,Awnings Principal $140 Extension $75 Modification $140 Post-Work Application Fee Add 50%App fee Application to Planning Board[1] TOTAL #STRUCTURE Special Use Permit[2] $990+$50/app Special UsePermit-extension $330 Special UsePermit-modification[2] ,450+$50/app Site Plan Review-Intl.PUD: Sketch Plan $330 Residential $330+$200/unit Residential-extension $200 Residential-modification 400 1 $400 Non-residential S66U+,s130/1000sf Non-Residential-extension $300 Non-Residential-modification $650 Subdivision-incl.PUD: TOTAL #LOTS Sketch Plan $330 Preliminary Approval[2] Residential:1-5 lots $660+$50/app Residential:6-10 lots $990+$50/app Residential:11-20lots $1320+$50/app Residential:21+lots $1650+50/app Residential-extension $330 Final Approval[2] Residential $1320+$175/lot+$50/app Non-Residential $2000/lot+$50/app Final Approval Modification[2] Residential $330+$50/app Non-Residential $550+$50/app Final Approval Extension Residential $135 Non-Residential $330 Other: TOTAL #LOT/ACRE Post-Work Application Fee Add 50%App fee Lot Line Adjustment $350 Letter of Credit-modification or extension $440 Letter of Credit-collection up to 1%ofLoC Recreation Fee $2000/lotorunit Land Disturbance $660+$55/acre SEQRA EIS Review(Draft&Final) TBD Legal Noticing if PB requires Public Hearing $50/app [1] Fees are based on per structure,except where noted. $400.00 TOTAL DUE [2] Legal ad required;Ind udes City processing and publishing For Administrative Use Total Paid at Intake Revised Fee Balance Due ��_Balance Paid Staffapproval