HomeMy WebLinkAbout20210755 269 Broadway Site Plan C2 Design 2022-04-07 269 Broadway Letter for Planning Board DESIGN GROUP ARCHITECTURE I MARKETING April 7, 2022 Susan B. Barden,AICP Principal Planner City of Saratoga Springs Planning Department 474 Broadway Saratoga Springs, NY 12866 RE: 269 Broadway, Saratoga Springs NY Dear Ms. Barden, C2 Architecture, PC is currently working with Terracon and Spring Line Design on the shoring and foundation system for 269 Broadway in Saratoga Springs, NY. Terracon has completed a Geotechnical Report,dated 2/1/2022,which has given the design team an understanding of the site conditions.Additional borings will be performed on-site which will be used to finalize the design for the secant wall as well as will attempt to identify any additional springs found on site.Terracon has been hired to design the secant wall,which will be installed around the entire perimeter of the property. Based on the data from the Geotechnical Report, any groundwater occurred during construction will be treated on-site and dumped into the City of Saratoga storm system on Hamilton Street. Once the secant wall is installed,excavation will begin internally on-site.This process will remove the soil within the secant shoring down to the required depth to install a mat slab. Should groundwater or a natural spring occur during this process,we will install a water migration system before any additional excavation takes place.Any groundwater will be treated and pumped off site into the City of Saratoga storm system along Hamilton Street.This system will be designed by a licensed engineer and will have dual redundancy which will be connected to the on-site generator. Not only is installation of the secant wall for the shoring system the best recommendation for this site, it will also ensure very little deformation and settlement and can support high loads for surrounding structures. During construction,a secant wall will provide less vibration during the installation process which will be monitored on-site. Supplementary information related to the installation of the secant wall will be provided to the Building Department for final review and approval. In addition to our letter, a letter from Terracon is provided under a separate letterhead. Lastly,additional information is provided by Keller,who is a contractor for installing secant wall systems. 24 AIRPORT Roao� NY 1 2302 T: 51 8.320.525❑ F: 51 5.320.8252 ' ' 269 Broadway,Saratoga Springs Project Page 2 Based on my team's experience and our knowledge of the project site,we are taking every precaution and have taken steps to ensure completion of this project and most importantly to protect the surrounding buildings. Sincerely, �''i, Michael A. Roman, RA,AIA, NCARB Principal C2 Architecture, PC Attachments: 1. Geotechnical Engineering Report dated 2/1/2022 2. Terracon Letter dated 4/7/2022 3. Keller Secant Piles SOQ