Loading...
HomeMy WebLinkAbout20210755 269 Broadway Site Plan Correspondence-Saratoga Hospital SARATC�GA HC�SPITAL �A t',LBAI�Y h�iLD Health System April 5, 2Q22 Susan Barden Principal Planner �ity of Saratoga Springs 474 Broadway Saratoga Spring�, NY 12866 Dear Ms. Barden: I am writing a#the requ�s� �f Alison Yovin� of M.J. Engineering regarding the proposed project at 269 Broadway. The new building wif� be acijacent to our Community Health Center at 24 Hamilton Stree#. The building owner has asked for our consent regarding three items: 1) Reiacation of the �lec#rical switchgear from 269 Broadway ta the southwest corner of our parcel be#ween our parking lot and the City sidewalk. Our s4gnage at that location would be relocat�d to a place of our c�oosing, or swapped out for bui[ding mounted cocte carnpliant signage, the co�t of which would be borne by the awner of 269 Broadway. 2) R�mo�al and reinstallation of parking lot sigr�s along the sidewalk that runs east to west along our southern property line. 3} Remo�al of#h� existing light fixtures along tha# same sidewalk. These �ights wilf be reused along Broadway and in the proppsed Givic Space to the south of the new building. The sidewalk at our south property line will be lit via wall-mounted fixtures alang the north side of 269 Bfoadway. Th� cost of items 2 & 3 wauld also be borne by the owner of 2fi9 Broadway. In general, the haspital is amenable to the above changes. However, we ar� currently working uvith our counsel and the owner's counsel to draw up apprapriate easements regarding this wprk. IIVe would require tha#th�se easements be executed and recorded priar#o any work begin done on the haspital's praperty. Si �r y, � ngelo G. Cafbone President & CEO cG: A. Yovine, PLA, M.J. Engineering B. Ste�es, Esq, Jones Stewes i �I-I L�lUfC�l 11(�_C�I.ti7f�ilil;,�i ��ifiil€�ti.��V 'I��il��l�--11]`�li I���' ,'1�; if��S !;d`1'? I�i�� ;��:-,i�..-,�,�-0I tilfllll���il-I��w�I�I�I�,i�Y:� _ �I 1 �