April 5, 2Q22
Susan Barden
Principal Planner
�ity of Saratoga Springs
474 Broadway
Saratoga Spring�, NY 12866
Dear Ms. Barden:
I am writing a#the requ�s� �f Alison Yovin� of M.J. Engineering regarding the proposed project
at 269 Broadway. The new building wif� be acijacent to our Community Health Center at 24
Hamilton Stree#. The building owner has asked for our consent regarding three items:
1) Reiacation of the �lec#rical switchgear from 269 Broadway ta the southwest corner of
our parcel be#ween our parking lot and the City sidewalk. Our s4gnage at that location
would be relocat�d to a place of our c�oosing, or swapped out for bui[ding mounted
cocte carnpliant signage, the co�t of which would be borne by the awner of 269
Broadway.
2) R�mo�al and reinstallation of parking lot sigr�s along the sidewalk that runs east to
west along our southern property line.
3} Remo�al of#h� existing light fixtures along tha# same sidewalk. These �ights wilf be
reused along Broadway and in the proppsed Givic Space to the south of the new
building. The sidewalk at our south property line will be lit via wall-mounted fixtures
alang the north side of 269 Bfoadway. Th� cost of items 2 & 3 wauld also be borne
by the owner of 2fi9 Broadway.
In general, the haspital is amenable to the above changes. However, we ar� currently working
uvith our counsel and the owner's counsel to draw up apprapriate easements regarding this
wprk. IIVe would require tha#th�se easements be executed and recorded priar#o any work
begin done on the haspital's praperty.
Si �r y,
�
ngelo G. Cafbone
President & CEO
cG: A. Yovine, PLA, M.J. Engineering
B. Ste�es, Esq, Jones Stewes