Loading...
HomeMy WebLinkAbout20210737 74 Mitchell Site Plan Modification-Application **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** �FOR OFFICE USE� `'�'�' ' CITY OF SARATOGA SPRINGS �Application#) .4'� ��'r f `~ w� � ; pLANNING BOARD � A � f- (Date received) — ,� � CITY HALL-474 BROADWAY ��,�r,�� .`- SARATOGA SPRINGS, NEW YORK 12866-2296 ��, - 'gl�,' TEL: 518-587-3550X2533 - www.saratoga-springs.org (Project Title) Staff Review APPLICATION FOR: SITE PLAN REVIEW (INCLUDING PUD) **Application Check List-All submissions must include completed application check list and all required items.** Property 74 Mitchell Street Address/Location: Tax Parcel #: 166.70-1-17 Zoning District:UR-3 (for example: 165.52-4-37) Project Description: . Site Plan review for Private Club with Pool and garden for HOA Members. Date special use permit granted (if any): 03/24/22 Date zoning variance granted (if any): Has a previous application been filed with PB for this property?: �NO ✓�YES If YES, include Application TYPE Special Use Permit and DATE: 3/24/22 Is property located within (check all that apply)?: ❑ Historic District ❑ Architectural Review District ❑ 500' of a State Park, city boundary, or county/state highway APPLICANT(S)* OWNER(S) (If nOt appllCant) ATTORNEY/AGENT Name Jay Hanley Saratoga Parking Services, ��c. The LA Group Address 9 Eastgate Ln. Hingham, MA. 02043 12 Fifth Ave, SS, NY 12866 40 Long Alley, SS, NY 12866 Phone 508-228-5543 518-587-1189 518-587-8100 Email 1ay@hanleydevelopment.com mingersoll@thelagroup.com Identify primary contact person: ❑ Applicant ❑ Owner 8 Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Revised 1/2021 City of Saratoga Springs-Site Plan Review Application 1 REQUIRED ITEMS: �3 nard copies (1 wloriginal signature), 1 digital copy of ALL ma#erials Applicatian Fee: Make checks payable to the "Commissianer af Finance°. REFER TO THE CURR�NT FEE WORKSHEET INCLUDED IN THI� DOCUMENT. Check Ci#y's website (www.sarata�a-sqrings.org} for meeting dates. Daes any City officer, �mployee or family member thereof have a financial interest (as defined by �eneral Municipal Law Sectian 809) in this applicatian7 YES NO x . If YES, a statement disclasing the nam�, residence, nature and extent af this interest must be fiied with this application. I, tl�e undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan Re�iew by #he Planning Board for the identified property abo�e. I agree to meet all requirements under Section 240-7.2 of the Zoning Qrdinance of t#�e City of Saratoga Springs. Fur�hermore, I hereby authorize memb�rs of the Planning 8oard and designated City staff to enter the property associated with this application for purposes of conducting any Recessary site inspections relating to #his application. Applicant Signature: _ Date: �b � � � � If applicant is not current owner, owner must also sign. Owner Signature; Date: f���S�� � -.����°`'�' ����- CITY OF SARATOGA SPRINGS � � � f�:: � ,; PLANNING BOARD ,� ! CITY HALL-474 BROADWAY - y'�;�r 1� .'� SARATOGA SPRINGS, NEW YORK 12866-2296 �%,�` � " ��,' TEL: 518-587-3550 X2533 '"�oRAT�o �q www.saratoga-springs.org SITE PLAN REVIEW SUBMITTAL CHECKLIST Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Zoning Ordinance Appendix B. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital copy of ALL materials CHECK EACH ITEM � 1. Completed Site Plan Application (3 hard copies - *1 w/original signature - and 1 digital) and Fee � 2. SEQR Environmental Assessment Form- short or long form as required by action. � 3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet). One digital version of all submittal items (pd� shall be provided. � 4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242. � 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system � 6. Engineering Report for Water and Sanitary � 7. Complete Streets Checklist � 8. Project Cost Estimate-Quantities of work items and estimate of costs REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: 1. Property line survey prepared by a licensed land surveyor. Site plan must reference such � survey with all corners set and marked on plan. A copy of the original property survey must also be included. � 2. North arrow and map scale � 3. Parcel tax map number � 4. Site location map City of Saratoga Springs Site Plan Checklist 1 � 5. Site vicinity map (all features within 300 feet of property) � 6. Identification of zoning district with corresponding area requirements � 7. Building setback lines, either listed or shown on plans. � 8. Title block with project name; name and address of applicant; and name and address of property owner (if different) � 9. Topography data tied to NGVD 1929 datum � 10. Name of all adjacent property owners � 11. Parcel street address (existing and any proposed postal addresses) Yes rro rr/a 12. Identification of all existing or proposed easements, covenants or legal rights-of-way on this ] � � property � � � 13. References to all prior variances or special use permits � � � 14. Existing and proposed contours and spot grades (at 2 foot intervals) � � � 15. Identification of all spoil or borrow areas � � � 16. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains, rock outcroppings, etc. � � � 17. Location of proposed storage � � � 18. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition of existing sidewalks) � � � 19. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) � � � 20. Location and distance to fire hydrant � � ❑� 21. Location, size, and material of all existing and proposed utility services � � � 22. Parking lot layout plan and identification of all loading areas (number all spaces) � � � 23. Parking demand calculations ] [❑ � 24. Identification of parking spaces and access points for physically impaired persons � � � 25. Location and screening plan for dumpster or recycling bins � [ � 26. Location, design, type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site � � � 27. Identification of storage of any potentially hazardous materials � [ � 28. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. � � � 29. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures � � � 30. Erosion and sediment control plan — including designated concrete truck washout area Checklist prepared by: Mattll@W BI"ObStOf1 Date: 3�29�22 City of Saratoga Springs Site Plan Checklist 2