HomeMy WebLinkAbout20220045 145 Union Area Variance Lot Coverage Revision SDATELIER
ARCHITECTURE �.�.C.
511 BROADWAY,2ND FLOOR SARATOGA SPRINGS,N.Y.12866
P.H.518 587 3385/FAX 518 3�6 6048 SDATELIER.COM
To : City of Saratoga Springs Date : March 28, 2022
Zoning Board
Attn: Susanna Combs
and Aneisha Samuels
Re: 2021-64 Renovation for Kate Amello
145 Union Ave, Saratoga Springs, NY 12866
Existinq Conditions:
Lot Size: 5600+/-sq. ft.
Lot width -40 ft
Existing Bldg.Area: 1540.07 sq ft - 27.50%
Garage 360 sq ft 6.43% access bldg.
Maximum Bldg.Area: 25% allowed and 15% access bldg. = 40% total
Proposed:
Lot Size: 5600 +/-sf
Building Area with new addition: 1705+/-sf.
2 condensers and generator: 27 sf
Proposed Bldg. + Utilities Area: 1732 sf= 31%
Variance Request
Requirement Required Existinq Proposed Relief requested
Front Yard Setback— 25 6'-4" Existing n/a
Rear Yard Setback - 25 75'-2" Existing n/a
Side Yard Set Back 20' 1.3' 1.3 ' 18.7'
Total Side Yard Setback 45' 9.5" 9.5' 35.5'
Principal Building
Coverage— 25% 27.50% 31% 6%
Garage Building
Coverage— 15% 6.434% 0% n/a
Parking requirements UR-4 1.5 none requested
Requirement is for lot size to be 3,000 sf and minimum width to be 100. Lot is sub-standard by 60ft
SD ATELIER—Architecture, L.L.C.,has been providing a high quality of professional Architectural service for over 26 years.