Loading...
HomeMy WebLinkAbout20220240 110-114 Nelson Final Subdivision SEQR Long Form Full Envi�onmental Assessment Fo�m Pc�rt 1 -P�oject and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and,when possible,generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A&B. In Sections C,D&E,most items contain an initial question that must be answered either"Yes"or"No". If the answer to the initial question is"Yes",complete the sub-questions that follow. If the answer to the initial question is"No",proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part lis accurate and complete. A.Project and Applicant/Sponsor Information. Name of Action or Project 110-114 Nelson Avenue Project Location(describe,and attach a general location map): 110-114 Nelson Avenue Brief Description of Proposed Action(include purpose or need): The proposed action consists of subdividing an existing parcel into four lots on Nelson Avenue.Three lots will have single family residential homes and the fourth lot will be left open and undisturbed for possible future development. It is anticipated that an additional 9 building lots will be developed in the future for a total of 12 lots upon project completion. Name of ApplicanbSponsor: Telephone:�51s)5s�-4��3 JW Hemmingway,LLC E-Mall: . �witt@wittconstruction.com Address:563 North Broadway Clty/PO:Saratoga Springs State:NY Zlp COde:12866 Project Contact(if not same as sponsor;give name and title/role): Telephone:�518)587-4113 John Witt E-Mall:• �witt@wittconstruction.com Address: Same Ciry/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: �518)238-3045 CRND Properties E-Mall: trober427@gmail.com Address: 21 Sutherland Drive Ciry/PO: State: Zip Code: Watervliet NY 12189 Page 1 of 13 B.Government Approvals B.Government Approvals,Funding,or Sponsorship. ("Funding"includes grants,loans,t�relief,and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. Ciry Counsel,Town Board, ❑Yes�No or Village Board of Trustees b. City,Town or Village �Yes❑No Subdivision Approval Planning Board or Commission c. Ciry, Town or ❑Yes�No Village Zoning Board of Appeals d. Other local agencies ❑Yes�No e.COunty agenCles �Yes❑NO Saratoga County Planning,Advisory Opinion f.Regional agencies ❑Yes�No g. State agencies �Yes❑No NY SHPO h.Federal agencies ❑Yes�No i. Coastal Resources. i. Is the project site within a Coastal Area,or the waterfront area of a Designated Inland Waterway? ❑Yes mNo ii. Is the project site located in a communiry with an approved Local Waterfront Revitalization Program? ❑YesmNo iii. Is the project site within a Coastal Erosion Hazard Area? ❑YesmNo C.Planning and Zoning C.1.Planning and zoning actions. Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule or regulation be the ❑YesmNo only approval(s)which must be granted to enable the proposed action to proceed? • If Yes,complete sections C,F and G. • If No,proceed to question C2 and complete all remaining sections and questions in Part 1 C.2.Adopted land use plans. a.Do any municipally- adopted (ciry,town,village or county)comprehensive land use plan(s)include the site �Yes❑No where the proposed action would be located? If Yes,does the comprehensive plan include specific recommendations far the site where the proposed action �Yes❑No would be located? b.Is the site of the proposed action within any local or regional special planning district(for example: Greenway; mYes❑No Brownfield Opportuniry Area(BOA);designated State or Federal heritage area;watershed management plan; or other?) If Yes,identify the plan(s): NYS Heritage Areas:Mohawk Valley Heritage Corridor, NYS Heritage Areas:Saratoga c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, ❑YesmNo or an adopted municipal farmland protection plan? If Yes,identify the plan(s): Page 2 of 13 C.3. Zoning a. Is the site of the proposed action located in a municipaliry with an adopted zoning law or ordinance. m Yes❑No If Yes,what is the zoning classification(s)including any applicable overlay district? UR-2; Urban Residential b. Is the use permitted or allowed by a special or conditional use permit? m Yes❑No c.Is a zoning change requested as part of the proposed action? ❑Yes�No If Yes, i. What is the proposed new zoning for the site? C.4.Exisfing community services. a.In what school district is the project site located?city ot saratoga springs school District b.What police or other public protection forces serve the project site? City of Saratoga Springs Police Department c.Which fire protection and emergency medical services serve the project site? City of Saratoga Springs Fire Department d.What parks serve the proj ect site? East Side Recreation Fields(226 Lake Avenue,Saratoga Sprinqs� D.Project Details D.1.Proposed and Potential Development a.What is the general nature of the proposed action(e.g.,residential,industrial,commercial,recreational;if mixed,include all components)? Residential Subdivision b. a.Total acreage of the site of the proposed action? �.�6 acres b.Total acreage to be physically disturbed? o.so acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 2.16 acres c.Is the proposed action an expansion of an existing project or use? ❑Yes�No i. If Yes,what is the approximate percentage of the proposed expansion and identify the units(e.g.,acres,miles,housing units, Squal'e feet)? % Units: 3 single family homes d.Is the proposed action a subdivision,or does it include a subdivision? �Yes❑No If Yes, i. Purpose or type of subdivision?(e.g.,residential,industrial,commercial;if mixed,specify types) Residential; single family detached ii. Is a cluster/conservation layout proposed? ❑Yes�No iii. Number of lots proposed? 4 iv. Minimum and m�imum proposed lot sizes? Minimum 6601 SF M�imum 6809 SF (building lot) e.Will the proposed action be constructed in multiple phases? �Yes❑No i. If No,anticipated period of construction: months ii. If Yes: • Total number of phases anticipated � • Anticipated commencement date of phase 1 (including demolition) 9 month �� year • Anticipated completion date of final phase �2 month 28year • Generally describe connections or relationships among phases,including any contingencies where progress of one phase may determine timing or duration of future phases: The first phase of the prolect will commence later this year.A sewer line constructed durinq the first phase will be extended to the rear of the parcel durinq the second phase to service the additional,approved building lots. Page 3 of 13 £Does the project include new residential uses? �Yes❑No If Yes,show numbers of units proposed. One Familv Two Familv Three Familv Multible Familv four or more Initial Phase 3 At completion of all phases �� g.Does the proposed action include new non-residential construction(including expansions)? ❑Yes�No If Yes, i.Total number of structures ii. Dimensions(in feet)of largest proposed structure: height; width; and length iii. Appro�mate extent of building space to be heated or cooled: square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any ❑Yes�No liquids,such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment,the principal source of the water: ❑ Ground water❑Surface water streams ❑Other specify: iii. If other than water,identify the rype of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure(e.g.,earth fill,rock,wood,concrete): D.2. Project Operations a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,or both? ❑Yes�No (Not including general site preparation,grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i.What is the purpose of the excavation or dredging? ii. How much material(including rock,earth,sediments,etc.)is proposed to be removed from the site? • Volume(specify tons or cubic yards): • Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged,and plans to use,manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? ❑Yes❑No If yes,describe. v. What is the total area to be dredged or excavated? acres vi. What is the m�imum area to be worked at any one time? acres vii. What would be the m�imum depth of excavation or dredging? feet viii. Will the excavation require blasting? �Yes�No ix. Summarize site reclamation goals and plan: b.Would the proposed action cause or result in alteration of,increase or decrease in size of,or encroachment �YesONo into any existing wetland,waterbody,shoreline,beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic description): Page 4 of 13 ii. Describe how the proposed action would affect that waterbody or wetland,e.g. excavation,fill,placement of structures,or alteration of channels,banks and shorelines. Indicate extent of activities,alterations and additions in square feet or acres: iii.Will the proposed action cause or result in disturbance to bottom sediments? ❑Yes❑No If Yes,describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? ❑Yes❑No If Yes: • acres of aquatic vegetation proposed to be removed: • expected acreage of aquatic vegetation remaining after proj ect completion: • purpose of proposed removal(e.g.beach clearing,invasive species control,boat access): • proposed method of plant removal: • if chemicaUherbicide treatment will be used,specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c.Will the proposed action use,or create a new demand for water? mYes❑No If Yes: i. Total anticipated water usage/demand per day: �,32o gallons/day ii. Will the proposed action obtain water from an existing public water supply? mYes❑No If Yes: • Name of district or service area: city ot saratoga sPrings • Does the existing public water supply have capaciry to serve the proposal? m Yes❑No • Is the project site in the existing district? m Yes❑No • Is expansion of the district needed? ❑Yes�No • Do existing lines serve the project site? m Yes❑No iii. Will line extension within an existing district be necessary to supply the project? ❑Yes�No If Yes: • Describe extensions or capaciry expansions proposed to serve this project: • Source(s)of supply for the districr iv. Is a new water supply district or service area proposed to be formed to serve the project site? ❑ Yes�No If,Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • Proposed source(s)of supply for new district v. If a public water supply will not be used,describe plans to provide water supply for the project vi.If water supply will be from wells(public or private),wl�at is the maximum pumping capacity: gallons/minute. d.Will the proposed action generate liquid wastes? m Yes❑No If Yes: i. Total anticipated liquid waste generation per day: �,32o gallons/day ii. Nature of liquid wastes to be generated(e.g.,sanitary wastewater,industrial;if combination,describe all components and approximate volumes or proportions of each): Sanitary sewer iii. Will the proposed action use any existing public wastewater treatment facilities? �Yes❑No If Yes: • Name of wastewater treatment plant to be used: saratoga county sewer�istrict Na � • Name Of d1StnCt: City of Saratoga Springs • Does the existing wastewater treatment plant have capaciry to serve the project? �Yes❑No • Is the project site in the existing district? �Yes❑No • Is expansion of the district needed? ❑YesmNo Page 5 of 13 • Do existing sewer lines serve the project site? �Yes❑No • Will a line extension within an existing district be necessary to serve the project? ❑Yes�No If Yes: • Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater(sewage)treatment district be formed to serve the project site? ❑Yes�No If Yes: • Applicant/sponsar for new district: • Date application submitted or anticipated: • What is the receiving water for the wastewater discharge? v. If public facilities will not be used,describe plans to provide wastewater treatment far the project,including specifying proposed receiving water(name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture,recycle or reuse liquid waste: e.Will the proposed action disturb more than one acre and create stormwater runoff,either from new point ❑Yes�No sources(i.e.ditches,pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point source(i.e.sheet flow)during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres(impervious surface) Square feet or acres(parcel size) ii. Describe rypes of new point sources. iii. Where will the stormwater runoff be directed(i.e.on-site stormwater management faciliry/structures,adjacent properties, groundwater,on-site surface water or off-site surface waters)? • If to surface waters,identify receiving water bodies or wetlands: • Will stormwaterrunoff flow to adjacentproperties? ❑Yes❑No iv. Does the proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater? ❑Yes❑No £ Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel ❑Yes�No combustion,waste incineration,or other processes or operations? If Yes,identify: i.Mobile sources during project operations(e.g.,heavy equipment,fleet or delivery vehicles) ii. Stationary sources during construction(e.g.,power generation,structural heating,batch plant,crushers) iii. Stationary sources during operations(e.g.,process emissions,large boilers,electric generation) g.Will any air emission sources named in D2.f(above),require a NY State Air Registration,Air Faciliry Permit, ❑Yes�No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the proj ect site located in an Air qualiry non-attainment area? (Area routinely or periodically fails to meet ❑Yes❑No ambient air qualiry standards for all or some parts of the year) ii. In addition to emissions as calculated in the application,the project will generate: • Tons/year(short tons)of Carbon Dioxide(COz) . Tons/year(short tons)of Nitrous Oxide(Nz0) . Tons/year(short tons)of Perfluorocarbons(PFCs) • Tons/year(short tons)of Sulfur Hexafluoride(SF6) • Tons/year(short tons)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs) • Tons/year(short tons)of Hazardous Air Pollutants(HAPs) Page 6 of 13 h.Will the proposed action generate or emit methane(including,but not limited to, sewage treatment plants, ❑Yes�No landfills,composting facilities)? If Yes: i. Estimate methane generation in tons/year(metric): ii.Describe any methane capture,control or elimination measures included in project design(e.g.,combustion to generate heat or electriciry,flaring): i.Will the proposed action result in the release of air pollutants from open-air operations or processes,such as ❑Yes�No quany or landfill operations? If Yes:Describe operations and nature of emissions(e.g.,diesel exhaust,rock particulates/dust): j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial �Yes�No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected(Check all that apply): ❑Morning ❑Evening ❑Weekend ❑Randomly between hours of to ii. For commercial activities only,projected number of truck trips/day and type(e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? ❑Yes❑No v If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe: vi. Are public/private transportation service(s)or facilities available within'/z mile of the proposed site? �Yes�No vii Will the proposed action include access to public transportation or accommodations for use of hybrid,electric ❑Yes❑No or other alternative fueled vehicles? viii.Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing ❑Yes❑No pedestrian or bicycle routes? k.Will the proposed action(for commercial or industrial projects only)generate new or additional demand ❑Yes�No for energy? If Yes: i. Estimate annual electriciry demand during operation of the proposed action: ii. Anticipated sources/suppliers of electriciry for the project(e.g.,on-site combustion,on-site renewable,via grid/local utiliry,or other): iii. Will the proposed action require a new,or an upgrade,to an existing substation? �Yes❑No L Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: • Monday-Friday: �am-10 pm . Monday-Friday: 24 hours • SatuTday: 8 am-5 pm • SatuTday: 24 hours • Sunday: none • Sunday: 24 hours • Holidays: none • Holidays: 24 hours Page 7 of 13 m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, �Yes❑No operation,or both? If yes: i. Provide details including sources,time of day and duration: During construction;qradinq equipment,deliveries,and construction site noise ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? ❑Yes�No Describe: n.Will the proposed action have outdoor lighting? m Yes❑No If yes: i. Describe source(s),location(s),height of fixture(s),direction/aim,and proximiry to nearest occupied structures: Typical outdoor liqhtinq for residential homes,and city street liqhtinq as required. ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ❑Yes�No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? ❑Yes�No If Yes,describe possible sources,potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum(combined capacity of over 1,100 gallons) ❑Yes�No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s)to be stored ii. Volume(s) per unit time (e.g.,month,year) iii. Generally,describe the proposed storage facilities: q.Will the proposed action(commercial,industrial and recreational projects only)use pesticides(i.e.,herbicides, ❑Yes �No insecticides)during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the ro osed action use Inte ated Pest Mana ement Practices? ❑ Yes ❑No r.Will the proposed action(commercial or industrial projects only)involve or require the management or disposal ❑ Yes �No of solid waste(excluding hazardous materials)? If Yes: i. Describe any solid waste(s)to be generated during construction or operation of the faciliry: • Construction: tons per (unit of time) • Operation: tons per (unit of time) ii. Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste: • Construction: • Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site: • Construction: • Operation: Page 8 of 13 s.Does the proposed action include construction or modification of a solid waste management faciliry? ❑ Yes� No If Yes: i. Type of management or handling of waste proposed for the site (e.g.,recycling or transfer station,composting,landfill,or other disposal activities): ii. Anticipated rate of disposal/processing: • Tons/month,if transfer or other non-combustion/thermal treatment,or • Tons/hour,if combustion ar thermal treatment iii. If landfill,anticipated site life: years t.Will the proposed action at the site involve the commercial generation,treatment, storage,or disposal of hazardous❑Yes�No waste? If Yes: i. Name(s)of all hazardous wastes or constituents to be generated,handled or managed at faciliry: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization,recycling or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste faciliry? ❑Yes�No If Yes:provide name and location of faciliry: If No:describe proposed management of any hazardous wastes which will not be sent to a hazardous waste faciliry: E.Site and Setting of Proposed Action E1.Land uses on and surrounding the project site a.Existing land uses. i. Check all uses that occur on,adjoining and near the project site. ❑ Urban ❑ Industrial ❑ Commercial � Residential(suburban) ❑ Rural(non-farm) ❑ FOI'est ❑ AgnCultul'e ❑ AquatlC � Othel'(SpeClfy): Saratoga Race Track and associated barns ii. If mix of uses,generally describe: b.Land uses and covertypes on the project site. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres+/-) • Roads,buildings,and other paved or impervious surfaces o 0.2 +0.2 • Forested o 0 0 • Meadows,grasslands or brushlands(non- o 0 0 agricultural,including abandoned agricultural) • Agricultural o 0 0 (includes active orchards,field,greenhouse etc.) • Surface water features (lakes,ponds,streams,rivers,etc.) o 0 0 • Wetlands(freshwater or tidal) o 0 0 • Non-vegetated(bare rock,earth or fill) o 0 0 • Other DeSCnbe:grass cover with small gravel areas 2.16 1.96 -0.2 Page 9 of 13 c.Is the project site presently used by members of the coimnunity for public recreation? ❑Yes✓❑No i. If Yes: explain: d.Are there any facilities serving children,the elderly,people with disabilities(e.g.,schools,hospitals,licensed ❑Yes�No day care centers,or group homes)within 1500 feet of the project site? If Yes, i. Identify Facilities: e.Does the project site contain an existing da�n? ❑Yes�No If Yes: i. Dimensions of the dam and impoundment: • Dam heighr feet • Dam length: feet • Surface area: acres • Volume impounded: gallons OR acre-feet ii. Dam's existing hazard classification: iii. Provide date and summarize results of last inspection: f.Has the project site ever been used as a municipal,commercial or industrial solid waste management faciliry, ❑Yes�No or does the project site adjoin property which is now,or was at one time,used as a solid waste management faciliry? If Yes: i. Has the faciliry been formally closed? ❑Yes❑ No • If yes,cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management faciliry: iii. Describe any development constraints due to the prior solid waste activities: g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin ❑Yes�No property which is now or was at one time used to commercially treat,store and/or dispose of hazardous waste? If Yes: i. Describe waste(s)handled and waste management activities,including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any ❑Yes� No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site ❑Yes❑No Remediation database? Check all that apply: ❑ Yes—Spills Incidents database Provide DEC ID number(s): ❑ Yes—Environmental Site Remediation database Provide DEC ID number(s): ❑ Neither database ii. If site has been subject of RCRA corrective activities,describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? ❑Yes�No If yes,provide DEC ID number(s): iv. If yes to(i),(ii)or(iii)above,describe current status of site(s): Page 10 of 13 v. Is the project site subject to an institutional control limiting property uses? ❑YesmNo • If yes,DEC site ID number: • Describe the rype of institutional control(e.g.,deed restriction or easement): • Describe any use limitations: • Describe any engineering controls: • Will the project affect the institutional or engineering controls in place? ❑Yes❑No • Explain: E.2. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? Greater than 10 feet b.Are there bedrock outcroppings on the project site? ❑YesmNo If Yes,what proportion of the site is comprised of bedrock outcroppings? % c.Predomlllant soll type(s)present on project site: Deerfield loamy fine sand 20 % Windsor loamy sand 80 % % d.What is the average depth to the water table on the proj ect site? Average: >s feet e.Drainage status of project site soils:� Well Drained: �oo%of site ❑ Moderately Well Drained: %of site ❑ Poorly Drained %of site f.Approximate proportion of proposed action site with slopes: � 0-10%: �oo %of site ❑ 10-15%: %of site ❑ 15%or greater: %of site g.Are there any unique geologic features on the project site? ❑Yes�No If Yes,describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies(including streams,rivers, ❑Yes�No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? ❑Yes�No If Yes to either i or ii,continue. If No,skip to E2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, ❑Yes�No state or local agency? iv. For each identified regulated wetland and waterbody on the project site,provide the following information: • Streams: Name Classification � Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland Na (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water qualiry-impaired ❑Yes�[Vo waterbodies? If yes,name of impaired water body/bodies and basis for listing as impaired: i.Is the project site in a designated Floodway? ❑Yes�No j.Is the project site in the 100-year Floodplain? ❑Yes�No k Is the project site in the 500-year Floodplain? ❑Yes�No L Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? �Yes❑No If Yes: i. Nanle Of aqulfer:Principal Aquifer Page 11 of 13 m. Identify the predominant wildlife species that occupy or use the project site: Squirrels Crows Typical suburban area species n.Does the project site contain a designated significant natural communiry? ❑Yes�No If Yes: i. Describe the habitadcommunity (composition,function,and basis for designation): ii. Source(s)of description or evaluation: iii. Extent of community/habitat • Currently: acres • Following completion of project as proposed: acres • Gain or loss(indicate+or-): acres o.Does project site contain any species of plant or animal that is listed by the federal government or NYS as ❑Yes�No endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing(endangered ar threatened): p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of ❑YesmNo special concern? If Yes: i. Species and listing: q.Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing? ❑Yes�No If yes,give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a.Is the project site,or any portion of it,located in a designated agricultural district certified pursuant to ❑Yes�No Agriculture and Markets Law,Article 25-AA, Section 303 and 304? If Yes, provide counry plus district name/number: b.Are agricultural lands consisting of highly productive soils present? ❑Yes�No i. If Yes: acreage(s)on project site? ii. Source(s)of soil rating(s): c. Does the project site contain all or part of,or is it substantially contiguous to,a registered National ❑Yes�No Natural Landmark? If Yes: i. Nature of the natural landmark: ❑Biological Communiry ❑ Geological Feature ii. Provide brief description of landmark,including values behind designation and approximate size/extent: d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? ❑Yes�No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 12 of 13 e. Daes the praject site contain, or is it substantially contiguous to,a building,archaeo9ogica] site,or district 0 Yes❑No which is listed on the National or State Rcgister of Historic Places, or that has been determined by the Commissioner of Ehe NYS Office af Parks,Recreation and Historic Preservation to be eligible for listing on the State Register of Historic P�aces? If Yes: i. Nature of historic/archaeological resource: ❑Archaeologica] Site �Historic Building or Disirict ii. Name:Union Avenue Historic District iii. Brief descriptinn of attributes on which listing is based: � f. ls the project site,or any portion of it, located in ar adjacent to an area designated as sensitive for �'Yes❑No archaeological sites on the NY State Historic Preservation Office{SHPO}archaeologica] site in�entory? g. Have aclditional archaeolo�ical or historic site(s)ar resources been identified on ihe project site? DYes�No If Yes: - i. Qescribe possible r�;source(s): _ ii. Basis for identification: h. Is the project site within fives miles of any officially designated and publicly accessibie federal, state,or local ❑YesONo scenic ar aesthetic resource? [f Yes; i. �dentify resource: ir. Nature of,or basis for,designation(e.g.,established highway o�verlaok, state or local park, skate historic trail or scenic byway, etc.}: iii. Dista�nce between project and reso�rce: miles. ' i. Is the project site located within a designated river carridor under the Wild, Scenic and Recreational Rivers ❑Yes�No Program 6 NYCRR b6b7 [f Yes: " i. Edentily the name of the river and its designation: r. ri. 3s the activity consistent with develop�nent restrictions contained in 6NYCRR Part 666? ❑YesONo F. Additional Informatian • Attach any additional information which may be needed to clarify your projeci. If you ha�e ident3fiec�any adverse impacts which could be associated with your proposal,please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verifica�ion =- - •.� . I certify that Ehe informatian provided is true`���e best of my knowledge. �� 31� 11 �-- Applicantl'Sponsa ame .�ohn Witt � Date � _ � � �• �k,��`� ~>.�`�`°�. , � Signature �`°, ` '� '�� Title President,JW Hemmingway, LLC g, � \ PRINT FORM Pa�;e 13 of 13 EAF Mapper Summary Report Monday, November 8, 2021 10:36 AM DiSCleimel': The EAF Mapper is a screening tool intended to assist __ = -- �:, project sponsors and reviewing agencies in preparing an environmental I .. I�::;�� -�-'I � '' - assessment form(EAF).Not all questions asked in the EAF are '' I .��;.�7 �-��I��:� �i-�-5 � ��:7+ � � � i answered by the EAF Mapper.Additional information on any EAF 71 ���}�-'���'� } I_�j I question can be obtained by consulting the EAF Workbooks. Although �i}�" }�'� J the EAF Ma er rovides the most u to-date di ital data available to l 1,66.77Y�-15�'166.7��. � pp p p- 9 'I°���. -:'-'I '�`�"�.�+�_�� ' a � � � -�� DEC,you may also need to contact local or other data sources in order '` 5` ����'��-�"�������}��-�� a to obtain data not provided by the Mapper.Digital data is not a �i'`����-������•��.�7_�•1�a.-=�~ � � substituteforagencydeterminations. I °7.-a�3'-�3y '. 166*i 7=� 11 1 '��. -_�-�� I ;,--e�.__ I 3.�7-�27166.77-3,-3� '� ��'� ' � ���� �_�166 77 3 '.`� � �lalw� blcartr�al 1.66.77-3-�2� F� � ,,p; ;_�,�- , 1 66.77 3-:,i � � �I":�.-�I-�1 � � r�tc� a � rin �ss-3�-a=��—�� � � � � o �� � �ss�� #�-z�: i h �-�-�1� I �1 �-1e175"21�2-�, ��. .� �17�.-2-1 Tc.rci,sc� . .� , 5 � 1 7��2�1 � :i . 179 r-:o�h�.�lcr �� 17�.'21-2=�9 7�9�21-2�7'I 7�-21 � .:1 � I-� .�I-;�.-:; .�,�J:. r��ip� , , ',�kF�rnr I"?.21��2-�7 i I. �➢ i, �I i �-�.�'I-�}�-� , �� �tr�rl! �- � ` .B�c.t�r ��-...2:1i2�5 17�.21=2-;13�179.29 2_5U., . _ __ . y� 179-21-3-2 1 �' p ��q 4���1e79.21-2�517�3.�21 2.-1 2�� _ ��� Cl�dae��1 ����io:��r�a;r � L'��.�.'�.-�-�`�Y— Yar .1�,L Si fi r�_ .. — -= rv�r: wnr1� �1 2�I-2 'M� . ��r�.b�arc�h ,, c'nl� p�+ FI7ilaeielpltiia -3�r7ii��illS�.a�.'h-h�nrr�p,IP•]�F�E�:1FPl�'P:.P�JRsvan;Esn Jap3n,r�.qEll,Esii �vl7u7a i:Han I K��nc�i,Esii �P;1EPdT�F Pl�,�van,Esri Japan,r�.1Ell,Esri �vl7n7a �.H�n��f:.�,rn;l':Esn k��r�,�,E�ii�Tliaila�l fi; F�Ia;C�,ftii �� �75ti�?�kr1�� �,r�i�tiil,��k;�rs, ai7�_Itl7��;IS i Is�r[_,]i7}i77�ir7ih� si.i;r9O���7Sb�?akr�.la��•_��irtiil� ,rr.. i�rI��7�s;IS i_Is?r��ai7fi77�u7it�,° �: .t1-2 1��.�1 �4�3�.i�i� Yv B.i.i [Coastal or Waterfront Area] No B.i.ii [Local Waterfront Revitalization Area] No C.2.b. [Special Planning District] Yes - Digital mapping data are not available for all Special Planning Districts. Refer to EAF Workbook. C.2.b. [Special Planning District- Name] NYS Heritage Areas:Mohawk Valley Heritage Corridor, NYS Heritage Areas:Saratoga E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook. E.1.h.i [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook. E.1.h.i [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook. E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] No E.2.h.ii [Surface Water Features] No E.2.h.iii [Surface Water Features] No E.2.h.v [Impaired Water Bodies] No E.2.i. [Floodway] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.j. [100 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.k. [500 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.1. [Aquifers] Yes E.2.1. [Aquifer Names] Principal Aquifer Full Environmental Assessment Form - EAF Mapper Summary Report 1 E.2.n. [Natural Communities] No E.2.o. [Endangered or Threatened Species] No E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] No E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] No E.3.e. [National or State Register of Historic Yes - Digital mapping data for archaeological site boundaries are not Places or State Eligible Sites] available. Refer to EAF Workbook. E.3.e.ii [National or State Register of Historic Union Avenue Historic District Places or State Eligible Sites - Name] E.3.f. [Archeological Sites] Yes E.3.i. [Designated River Corridor] No Full Environmental Assessment Form - EAF Mapper Summary Report 2 "�'�'���K Parlcs Recreati�n StprE vF ! i {]PRt]RTUPJITY a�d HEstaric Preserv�tian ANDREW M. CUOMO ERIK KULLESEID Governor Commissioner April 13, 2021 Brittney Ciuffo Land Development Coordinator Witt Construction, Inc. 563 North Broadway Saratoga Springs, NY 12866 Re: DEC JW Hemmingway,110-114 Nelson Avenue Saratoga Springs, NY 12866 110 Nelson Ave, Saratoga Springs, NY 12866 21 PR02146 Dear Brittney Ciuffo: Thank you for requesting the comments of the Division for Historic Preservation of the Office of Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the submitted materials in accordance with the New York State Historic Preservation Act of 1980 (section 14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are those of the Division for Historic Preservation and relate only to Historic/Cultural resources. They do not include potential environmental impacts to New York State Parkland that may be involved in or near your project. Such impacts must be considered as part of the environmental review pursuant to the State Environmental Quality Review Act (New York Environmental Conservation Law Article 8) and its implementing regulations (6 NYCRR Part 617). We note that the proposed project is located adjacent to the State and National Register listed Saratoga Racetrack, which is part of the Union Avenue Historic District. In addition, 108 Nelson Avenue is not eligible for State and National Register listing. We understand that the proposed project will include development of a residential neighborhood on a lot located between Nelson Avenue and Frank Sullivan Place. The submitted concept plan (dated March 25, 2021/ submitted to SHPO April 1St) illustrates the proposed grouping of individual houses with a few options for street configurations. The building designs appear to reflect the nineteenth- century architectural styles found in nearby neighborhoods, including the Union Avenue Historic District. Based on this review, it appears that both Options 1 and 2 would generally be appropriate to the neighboring historic district and the Saratoga Racetrack. In order for our office to fully evaluate potential impacts to historic resources, we request that you submit preliminary or pre-final plans, sample building elevations, and information pertaining to exterior building colors and cladding materials when they become available. Division for Historic Preservation P.O. Box 189,Waterford, New York 12188-0189•(518)237-8643•parks.ny.gov Documentation requested in this letter should be provided via our Cultural Resource Information System (CRIS) at https://cris.parks.ny.gov/. Once on the CRIS site, you can log in as a guest and choose "submit" at the very top menu. Go to "Other Options" and choose "submit new information for an existing project". You will need this project number and your e-mail address. If you have any questions, I can be reached at (518) 268-2164. Sincerely, � ��.-��,.��—� Weston Davey Historic Site Restoration Coordinator Weston.davey@parks.ny.gov Division for Historic Preservation P.O. Box 189,Waterford, New York 12188-0189•(518)237-8643•parks.ny.gov