Loading...
HomeMy WebLinkAbout20190187 Allen Drive Apts Correspondance THEen Ch CAPITAL DISTRICT OFFICE iil Engineers 547 River Street L,r� �rve��r� Troy,Planner Y, NY 12180 COMPANIES Environmental&Safety Professionals P: 518.273.0055 or 888.539.9073 Landscape Architects Proud t to be Employee Owned Transportation Planners&Engineers www.chazencompanies.com April 5, 2019 Ms. Susan B. Barden, AICP Principal Planner City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 Delivered via email: susan.barden@saratoga-springs.org Re: City Designated Consulting Services for Allen Drive Apartments Traffic Assessment Review— 1st submittal review 14 Tait Lane, Saratoga Springs, Saratoga County, New York City PB#2019.187 Chazen Project No. 31904.03 Dear Susan: The Chazen Companies (Chazen) have completed our review of the Traffic Assessment prepared by Creighton Manning Engineering, dated March 1, 2019. Following are our observations/comments: 1. The trip generation calculations,trip distribution percentages, and trip assignments are acceptable. 2. The sight distance evaluation and its conclusions are acceptable. 3. The figure numbering scheme does not match that of the text. This should be corrected for the record copy. 4. Table 3 and Figures illustrating Phase 2 trips are not representative of Phase 2 but rather a combination of Phase 1 and Phase 2.The table and figures should be corrected for clarity and for the record copy. 5. The first major signalized intersection on Route 9N east of the site is Church Street at West Avenue.This intersection was subject of extensive analysis for developments proposed/approved in the West Avenue area such that traffic signal timing improvements were necessary to mitigate impacts. The traffic analysis for the Allen Drive Apartment project should evaluate this intersection as well since 70% of its traffic is projected to pass through the intersection. The analysis should determine if the signal timing improvements are sufficient to accommodate traffic from the Apartment project, or if additional improvements are necessary. 6. There are level of service drops to the D level for the Allen Drive and Sunnyside Garden Driveway approaches; discussions of potential mitigation improvements are not provided.The assessment should indicate if the level of service drops can be mitigated, such as adding a turn lane on the minor street approaches. New York: Hudson Valley• Capital District• North Country•Westchester Tennessee: Nashville • Chattanooga Oregon: Portland Chazen Engineering, Land Surveying& Landscape Architecture Co. DPC(NY) • Chazen Engineering Consultants, LLC(TN/OR) Allen Drive Apartments—City No.20190187—1st submittal review April 5,2019 Page 2 of 2 In order to expedite and simplify the review of revised materials we would appreciate if the next submission be accompanied by a response letter that describes the revised materials and how our comments were/were not integrated. If you have any comments, questions or need additional information, please do not hesitate to contact this office at 518-273-0055. Sincerely, L r/L T omas R. Johnson, P. PTOE Transportation Services Manager cc: Kari Donohue,Administrative Assistant, City Engineering (via email) Michael Veitch, Saratoga Springs (via email) Jim Connors, P.E. Chazen File Z:\projects\31900-31999\31904-XX_Saratoga Springs\31904.03-Allen Drive Apartments PB#2019.187\Correspondance\1st Submittal\Sent\31904_03-Allen Dr Apartments TIS Review-1st Review- 2019-04-05.docx