Loading...
HomeMy WebLinkAbout20220011 143 W. Circular Subdivision Cost Estimate for Letter of Credit Cost Estimate for Letter of Credit Planning Board No.: Project: Subdivision of Lands of Willard F.Chamberlin,Jr Location: 143 West Circular Street Saratoga Springs, NY Date: 12/10/2021 Firm Name&Preparer: The Environmental Design Partnership, LLP Page 1 of 2 On Site (All infrastructure &amenities on private property) Item# Item/Remarks Quantity Unit Unit Cost Subtotal %Complete Reduced $ Site Preparation and Gradinq 1 Clearing &Grubbing 0.15 AC $9,000.00 $1,350.00 0% $1,350.00 2 Silt Fence 360 LF $2.50 $900.00 0% $900.00 3 Construction Entrance 1 EA $500.00 $500.00 0% $500.00 4 Misc. Erosion Control Measures 1 EA $1,500.00 $1,500.00 0% $1,500.00 Hard Scape 7 Stone Subbase 60 CY $25.00 $1,500.00 0% $1,500.00 8 AsphaltPavement 1,600 SF $3.00 $4,800.00 0% $4,800.00 Site Water 9 3/4"Type K Copper Water Service 17 LF $20.00 $340.00 0% $340.00 Page 2 of 3 Item# Item/Remarks Quantity Unit Unit Cost Subtotal %Complete Reduced $ Site Sanitarv 10 6"SDR-26 Sanitary Line&Stone 16 LF $20.00 $320.00 0% $320.00 11 cleanouts 1 Ea $50.00 $50.00 0% $50.00 Landscapinq 12 Topsoil/Seed/Mulch 5 CY $3,000.00 $15,000.00 0% $15,000.00 Total onsite Work $26,260.00 $26,260.00 Total onsite X.25 $6,565.00 $6,565.00 LOC City Infrastructure.xlsx Off Site (All infrastructure &amenities to be dedicated to the City) Item# Item/Remarks Quantity Unit Subtotal %Complete Reduced $ Road Construction 13 Stonel Subbase 2 CY $25.00 $50.00 0% $50.00 14 Asphalt Pavement(Binder) 50 SF $3.00 $150.00 0% $150.00 15 Asphalt Pavement(Top) 50 SF $3.00 $150.00 0% $150.00 17 Concrete Sidewalk 50 SF $8.00 $400.00 0% $400.00 Off Site Water 21 3/4" Corp,WSO and Type K water service to PL 13 LF $20.00 $260.00 0% $260.00 Page 3 of 3 Item# Item/Remarks Quantity Unit Subtotal %Complete Reduced $ Site Sanitarv 22 SDR-35 6" Sanitary Service to PL&Stone 19 LF $20.00 $380.00 0% $380.00 23 Connection to existing sewer 1 EA $1,500.00 $1,500.00 0% $1,500.00 Landscapinq 24 Topsoil/Seed/Mulch 0.1 CY $3,000.00 $300.00 0% $300.00 25 StreetTrees 2 EA $600.00 $1,200.00 0% $1,200.00 Misc. 26 As-built Drawing 1 LS $2,000.00 $2,000.00 0% $2,000.00 Total offsite Work $6,390.00 $6,390.00 Total OnSite Work X25% $6,565.00 Total OffSite work $6,390.00 Total LOC Amount= $12,955.00 *New LOC Reduced Amount= $12,955.00 City LOC Approval/Date City LOC Reduction Approval/Date *LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75%_ $3,238.75 LOC City Infrastructure.xlsx