Loading...
HomeMy WebLinkAbout20200483 269 Broadway New Mixed-Use Revised Drawings 269 Broadway Saratoga Springs Design Review Committee January 03, 2022 Project Team 269 Broadway LLCC2 Architecture, PC M.J. Engineering Applicant ArchitectCivil Engineer Gerard Moser Michael RomanAlison Yovine Michael Toohey Project Information Project Lot (Blue Rectangle) 269 Broadway: Tax Parcel: 165.75-1-7 (Red Rectangle) South Extent of Saratoga Central Catholic High School: Tax Parcel: 165.75-1-7 Combined Lots (Orange Rectangle) Open Space: 31% of combined lots Individual LotsCombined Lots Built Space: 69% of combined lots Site Section Site Analysis | Surrounding Site Property Built Percentage Project Site Park Place Condo Directly across the street±69% of lot is building; ±31% is civic space/open ±90% of lot is building Site Analysis | Surrounding Site Drone Analysis Drone Fly-over at site and surrounding site context Analyzed relationships of buildings within about a mile radius of project location and compared those relationships to the project site Each height noted is elevation heights taken at each building location Determinations Within a ¼ mile radius from the project site, there were 6 locations that had a similar relationship to neighboring buildings https://3d.idacq.com/projects/mj987_04/video/lo cation1/ https://3d.idacq.com/projects/mj987_04/video/lo cation2/ Site Analysis | Surrounding Site Drone Analysis Drone Fly-over at site and surrounding site context 260 Broadway = 24.61 at Front at middle next to Congress Park next to 260 Broadway at back Site Analysis | Surrounding Site Drone Analysis Drone Fly-over at site and surrounding site context Congress Park Centre Site Analysis | Surrounding Site Drone Analysis Drone Fly-over at site and surrounding site context Site Analysis | Surrounding Site Drone Analysis Drone Fly-over at site and surrounding site context StonequistApts Gaslight Apts Site Analysis | Surrounding Site Drone Analysis Drone Fly-over at site and surrounding site context Site Analysis | Surrounding Site Site Elevation Standing on Broadway, looking west toward project site Site Analysis | Surrounding Site Site Elevation Standing on Broadway, looking east toward Congress Park Site Analysis | Surrounding Site Site Elevation Standing on Hamilton, looking east toward project site Site Analysis | Surrounding Site Site Elevation Cross elevation from Hamilton to Broadway Site Analysis | Surrounding Site Site Elevation Standing on Broadway looking toward 385 Broadway Site Analysis | Surrounding Site Site Elevation Looking toward Embassy Suites Site Analysis | Surrounding Site Site Elevation Standing on W. Circular Street looking down Federal St Building Plans Design Considerations Site Primary entrance for retail off Broadway and Hamilton Two-story open entry off Broadway Secondary entrance off south façade for upper floors PRIMARY ENTRY Retail Space Conditioned Space: 13,470 SF Building Support Space Outdoor Space: 2,180 SF Lobby/Hallway: 3,995 SF Civic Space SECONDARY Additional land provided city ENTRY with large amphitheater style open area for the public Built-in seating along walkway and building Planting to create privacy from adjacent properties Building Plans Design Considerations Green roof around perimeter Solar panels Building Section Building Materials Copper Brick Detail Brick Glen-GeryFacebrick Steel Black Granite Clear Fire Resistive Glazing (North Elevation) SAFTI First Glazing Systems Project Design Progression APRIL 2021 JANUARY 2020 SEPTEMBER 2020 SEPTEMBER 2021 Building Design Building Design Building DesignBuilding Design Building DesignBuilding Design Building Design Building Design Building DesignBuilding Design Building DesignBuilding Design Building DesignBuilding Design Q & A SESSION & Q A THANKS FOR LISTENING QUESTIONS?