Loading...
HomeMy WebLinkAbout20190299 Saratoga Golf and Polo Engineering Report The LA GROUP Landscape Architecture&Engineering P.C. Peopte.Purpose.Place. 40 Long Alley Saratoga Springs NY 12866 p:518-587-8100 1 518-587-0180 Engineering Report vvwvv.thelagroup.com Water and Sanitary Sewer For SARATOGA GOLF & POLO CLUB SITE PLAN APPROVAL 301 Church Street Saratoga Springs, New York Planning Board #19.xxx Prepared For Saratoga Golf& Polo Club 301 Church Street Saratoga Springs, NY 12866 Contact: Ron Ireland Prepared By The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 kEK, ec\- ,.0 ‘,. \-4# February 18, 2019 Engineering Report Saratoga Golf& Polo Club Saratoga Springs, New York 2018074 I. Project Description The Saratoga Golf and Polo Club is proposing the expansion of its member amenities. Specifically, a new golf and tennis pro shop, two platform tennis courts and a revised pool cabana with a warming room for the platform tennis, expanded parking area, and landscape improvements are proposed. Both the pro shop and cabana buildings will need water and sanitary sewer services. The pro shop will have two toilet rooms, a drinking fountain and a utility sink. The cabana will have one toilet room, a kitchen sink and a bar sink. Municipal water and sewer exist in the vicinity and services are within the boundary of the property. II. Existing Water and Sanitary Sewer Utilities Municipal water service is currently provided by the City of Saratoga Springs. A private 8-inch diameter water main on the south side of the property currently supplies water to the main clubhouse through a 2-inch service line where a master water meter is located. Following the meter, water is supplied to the swimming pool and site hose bib system. Municipal sanitary sewer service is available from the City of Saratoga Springs at the sanitary sewer main at the intersection of Church Street and Myrtle Street. The sewer main runs east on Church Street to the truck sewer on High Rock Avenue then by gravity to the SCSD Lift Station No. 1 at the intersection of High Rock Avenue and Warren Street. Ultimately the wastewater flows for conveyance and treatment at SCSD's wastewater treatment plant in Mechanicville. III. Projected Water and Wastewater Flows The table below provides information on the anticipated wastewater flow rates for the project: Description Note 1 Use Rate' Total Use (gpd) Existing Condition: Country Club 200 rounds 20 gpd/ea 4,000 Tennis Courts 200 users 10 gpd/ea 2,000 Swimming Pool 100 users 10 gpd/ea 1,000 Restaurant 100 seats 35 gpd/ea 3,500 1 Engineering Report Saratoga Golf& Polo Club Saratoga Springs, New York 2018074 Existing Condition(cont.): Banquet 200 seats 10 gpd/ea 2,000 Employees 25 each 15 gpd/ea 375 Total 12,877 1. Rounds of golf, restaurant seats,pool users, etc. are estimated based on provided data. 2. From Table B-3, NYSDEC 2014 Design Standards for Wastewater Treatment Systems. Average daily flow for wastewater is estimated to be 9 gallons per minute (gpm) based on a 24- hour day. Estimated peak hourly flow is 37.1 gpm(4.16 x average).3 Average daily demand for water is estimated to be approximately equal to the wastewater flow or 9 gpm. Peak hourly demand is estimated to be approximately equal to the peak hourly wastewater flow or 37.1 gpm. Peak instantaneous demand is calculated at 280 gallons per minute (gpm)based on country club use of 0.6 gpm per member and restaurant use of 1 gpm per seat.4 For the purposes of input into the City of Saratoga Springs water model, we offer the following estimated water demands for the project: • Average Day Demand is 9 gallons per minute (GPM) over the 24-hour period. • Max Day Demand is 18 gallons per minute (GPM) based on twice the average. • Peak Hourly Flow is 37.1 gallons per minute (GPM) based on 4.16 times the average. V. Proposed Water and Wastewater Utilities Proposed Water Utilities A new water service is proposed to serve the new pro shop building. The existing 8-inch private water main will be tapped to provide this service. A new water meter will be provided at the restroom utility closet. The new water service is proposed to be 1-inch copper. The new cabana building will be served from the existing clubhouse. Water use at the new cabana will be measured through the existing clubhouse meter. The new line from the clubhouse to the cabana is proposed to be 1-inch copper. Connections and appurtenances, including tapping sleeves and valves, mechanical joints, tees, isolation valves, thrust blocks, trenching, bedding, service connections, as well as testing and disinfection will all be specified in accordance with City of Saratoga Springs standards. 2 Engineering Report Saratoga Golf& Polo Club Saratoga Springs, New York 2018074 Proposed Wastewater Utilities Sanitary service will be provided from the cabana and pro-shop buildings by installing new 6- inch PVC gravity sewer laterals and connecting to the existing 8-inch PVC sewerline that currently serves the main clubhouse building. The new lines will be installed at a minimum slope of 1.0% to provide adequate cleansing velocity in the pipe. An interior grease trap is proposed for the cabana kitchen waste line. This device will intercept grease, oil and fat from the kitchen sink and dishwasher prior to discharge into the sanitary lateral pipe. A portion of the existing 8-inch sewerline in the southeast portion of the property has been identified to contain a minor dip or belly. The applicant proposes to replace this portion of the sewerline as needed to correct the slope deficiency. Manholes, cleanouts, pipe, trenching, bedding, service connections, and testing will be specified in accordance with City of Saratoga Springs minimum standards. Notes 3. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q= (18 +P%)±(4 +P%)where P=population in thousands 4. From Tables XV and XVI, Community Water Systems Source Book,Ameen. Attachments Attachment A Water Demand Calculations Attachment B Sanitary Sewer Use Calculations 3 ATTACHMENT A WATER DEMAND CALCULATIONS SARATOGA GOLF POLO CLUB 2/18/2019 SARATOGA SPRINGS, NY DETERMINE DAILY AVERAGE AND PEAK HOURLY DEMANL EXISTING CONDITION: COUNTRY CLUB: NO. OF ROUNDS 200 EA DESIGN FLOW = 20 GPD/EA (NYSDEC) Qa = 4, 000 GPD TENNIS COURTS: NO. OF USERS 200 EA DESIGN FLOW = 10 GPD/EA (NYSDEC) Qb = 2, 000 GPD SWIMMING POOL: NO. OF USERS 100 EA DESIGN FLOW = 10 GPD/EA (NYSDEC) Qc = 1, 000 GPD RESTAURANT: NO. OF SEATS 100 EA DESIGN FLOW = 35 GPD/EA (NYSDEC) Qd = 3,500 GPD BANQUET (WEDDING) : NO. OF SEATS 200 EA DESIGN FLOW = 10 GPD/EA (NYSDEC) Qe = 2, 000 GPD EMPLOYEES: NO. OF EMPLOYEES 25 EA DESIGN FLOW = 15 GPD/EA (NYSDEC) Qf = 375 GPD EXISTING SUBTOTAL 12, 875 GPD (Qa thru Qf) AVG. DAILY DAMAND, Qav = 9 GPM (24 HRS) MAX. DAILY DAMAND, Qmax = 18 GPM (TWICE THE AVG. ) EQUIVALENT POPULATION 180 EA (10-STATE STDS. PAGE PEAKING FACTOR, Qp/Qav 4 .16 10-5, FIG. 1, BASED ON PEAK HOURLY FLOW, Qp = 37 .1 GPM 75 GPD/PERSON) * NYSDEC 2014 DESIGN STANDARDS TABLE B-3 "Typical Per-Unit Loading Rates' 1 Attachment A SARATOGA GOLF POLO CLUB 2/18/2019 SARATOGA SPRINGS, NY DETERMINE INSTANTANEOUS DEMAND COUNTRY CLUB: NO. OF MEMBERS 300 EA DESIGN FLOW = 0. 6 GPM/UNIT (AMEEN TABLE XVI) * Qa = 180 GPM RESTAURANT: NO. OF SEATS 100 EA DESIGN FLOW = 1 GPM/SEAT (AMEEN TABLE XV) ** Qb = 100 GPM TOTAL INSTANTANEOUS 280 GPM (Qa thru Qb) * AMEEN TABLE XVI "Instantaneous Water Demands for Institutions" ** AMEEN TABLE XV "Instantaneous Water Demands for Commercial Areas" 2 Attachment A ATTACHMENT B SANITARY SEWER USE CALCULATIONS SARATOGA GOLF POLO CLUB 2/18/2019 SARATOGA SPRINGS, NY DETERMINE DAILY AVERAGE AND PEAK HOURLY FLOW EXISTING CONDITION: COUNTRY CLUB: NO. OF ROUNDS 200 EA DESIGN FLOW = 20 GPD/EA (NYSDEC) Qa = 4, 000 GPD TENNIS COURTS: NO. OF USERS 200 EA DESIGN FLOW = 10 GPD/EA (NYSDEC) Qb = 2, 000 GPD SWIMMING POOL: NO. OF USERS 100 EA DESIGN FLOW = 10 GPD/EA (NYSDEC) Qc = 1, 000 GPD RESTAURANT: NO. OF SEATS 100 EA DESIGN FLOW = 35 GPD/EA (NYSDEC) Qd = 3, 500 GPD BANQUET (WEDDING) : NO. OF SEATS 200 EA DESIGN FLOW = 10 GPD/EA (NYSDEC) Qe = 2, 000 GPD EMPLOYEES: NO. OF EMPLOYEES 25 EA DESIGN FLOW = 15 GPD/EA (NYSDEC) Qf = 375 GPD EXISTING SUBTOTAL 12, 875 GPD (Qa thru Qf) AVG. DAILY FLOW, Qav = 9 GPM (24 HRS) EQUIVALENT POPULATION 180 EA (10-STATE STDS. PAGE PEAKING FACTOR, Qp/Qav 4.16 10-5, FIG. 1, BASED ON 75 GPD/PERSON) PEAK HOURLY FLOW, Qp = 34.5 GPM 1 Attachment B