Loading...
HomeMy WebLinkAbout20181013 2018.104 Engineering Report 1-21-19LC.1 The LA GROUP Landscape Architecture & Engineering P.C. People. Purpose. Place. Engineering Report Water and Sanitary Sewer For 318 West Ave. Mixed Use Building 318 West Avenue SARATOGA SPRINGS, NEW YORK Planning Board # Prepared For: Cassier Smith Real Estate Holdings, LLC 32 Clinton Street Saratoga Springs, NY 12866 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 November 19, 2018 Rev. January 21, 2019 40 Long Alley Saratoga Springs NY 12866 p; 518-587-8100 f 518-587-0180 www.thelagroup.com I. Project Description The 318 West Avenue project consists of a proposed office building and apartments on a lot currently occupied by a single-family residence. As a part of the work, the new office portion is expected to have 25 employees. Additionally, there will be one 2 -bedroom and one 1 -bedroom apartment. II. Existing Water and Sanitary Sewer Utilities The existing residence has a 4 -inch PVC sanitary lateral that connects to the nearby Saratoga County Sewer District sewer main that bisects the property. The Sewer District sewer main is 36" diameter with a 25' wide easement over the property. The existing residence currently has water service from the City of Saratoga Springs. The water service is planned to be turned off at the corporation stop and pipe abandoned. There is an existing 6" diameter City of Saratoga Springs waterline along the west side of West Avenue. A hydrant flow test was completed on a fire hydrant nearest to the point of connection on January 4, 2019. The flow test indicated a static water pressure of 85 psi, with residual pressure of 80 psi flowing at 444 gpm. The theoretical available flow at 20 psi was calculated to be 1,774 gpm. According to Saratoga County assessment data the existing residence has 3 bedrooms, which would equate to 330 gallons of water demand and wastewater flow per day. III. Projected Water and Wastewater Flows The table below provides information on the anticipated wastewater flow rates for the project: Description Apartments 110 gpd/bdrml 330 gpd Office (15 Staff) Total Use Rate Total Use 15 gpd/employee' 225 gpd 555 gpd Average daily flow for wastewater is estimated to be 0.8 gallons per minute (gpm) based on a 12 -hour day. Estimated peak hourly flow is 3.4 gpm (4.2 x average).2 Average daily demand for water is estimated to be approximately equal to the wastewater flow or 0.8 gpm. For the purposes of input into the City of Saratoga Springs water model, we offer the following estimated water demands for the project: • Average Day Demand is 0.8 gallons per minute (GPM) over the 12 -hour period. • Max Day Demand is 1.6 gallon per minute (GPM) based on twice the average. • Peak Hourly Demand is 3.4 gallons per minute (GPM) based on 4.2 times the average. • Fire Flow Demand is 1,000 gallons per minute (GPM) per ISO guidelines. IV. Proposed Water and Wastewater Utilities Proposed Water Utilities To service the project the existing municipal water main will be wet tapped and a 6 -inch waterline will be installed to service the building. It is anticipated that the building will have fire protection via a fire sprinkler system. The new 6 -inch waterline will provide combined fire and domestic service to the building mechanical room where the domestic line will tee off and be metered. The outside shut-off valve will be in the green space between the curb and sidewalk of West Avenue. The nearest fire hydrant is located 250 -feet north on West Avenue. For a building protected by an automatic fire sprinkler system, the ISO states: "The NFF for commercial occupancies protected by an automatic fire sprinkler system installed in accordance with the general criteria of NFPA 13R, Standard for the Installation of Sprinkler Systems, is the demand at the base of the automatic sprinkler riser" and inside/outside hose stream. Using the formula given by ISO, the NFF for this facility is 1,000 gpm. Hydrant flow test data indicates approximately 1,774 gpm available at 20 psi. Based on this information, there is adequate fire protection water supply available at the site. Connections and appurtenances, including mechanical joints, tees, isolation valves, thrust blocks, trenching, bedding, service connections, as well as testing and disinfection will all be specified in accordance with City of Saratoga Springs and AWWA standards. Proposed Wastewater Utilities As a part of the work, the existing lateral is planned to be removed from the building to the sanitary connection point. The building will have a new 6 -inch PVC sanitary lateral which will connect to the Saratoga County Sewer District manhole. The project proposes modifying this manhole to accept this new sanitary lateral. The lateral will be installed at a minimum 2.0% slope to ensure adequate pipe cleansing. Lateral and construction permits will be submitted to the Saratoga County Sewer District No. 1. Notes 1. From Table B-3 NYSDEC Design Standards for Intermediate Sized Wastewater Treatment Systems. 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q = (18 + P h) - (4 + P'h) where P = population in thousands 1to't4 Ead.e 7&e Placer:0a Stemd lac, P.O. BOX 508 BURNT HILLS, N.Y. 12027 (518) 885-1115 FAX (518) 885-0526 HYDRANT FLOW TEST REPORT LOCATION: 318 West Ave — Saratoga Springs, NY 12866 TEST BY: Cary Stewart (NEF), Andrea Howard (NEF), Bill Benton (B&B) Witnessed by: Matt Zeno (City of Saratoga Springs DPW) DATE: 01-04-19 TIME: 9:30 AM TARGET HYD. LOCATION (B) 285 West Ave (See Sketch) TEST RESULTS: STATIC PRESSURE (B) 85 PSI RESIDUAL PRESSURE (B) 80 PSI WITH 444 GPM FLOWING AT (A) RESIDUAL PRESSURE (B) PSI WITH GPM FLOWING AT (A) FLOW HYD. LOCATION (A) 395 West Ave (See Sketch) 1) PORT FLOWED (A) 444 DIAMETER 2 1/2" 2) PORT FLOWED (A) DIAMETER 3) PORT FLOWED (A) DIAMETER 1) PITOT WITH DIFFUSER READING (A) 7 PSI AT 444 GPM 2) PITOT or FLOW METER READING (A) PSI AT GPM 3) PITOT or FLOW METER READING (A) PSI AT GPM OUTLET COEFFICIENT USED 0.90 (smooth 0.90) (square & sharp 0.88) (projecting into barrel 0.77) ESTIMATED FLOW AT 20 PSI 1774 GPM LOCATION SKETCH ATTACHED ? YES X NO