HomeMy WebLinkAbout20180432 18.031 153SouthBWay_Water Sewer Engineering ReportThe LA GROUP
Landscape Architecture & Engineering P.C.
40 Long Alley
Saratoga Springs
NY 12866
Engineering Report
Water and Sanitary Sewer
For
F. 518-587-8100
f 518-587-0180
www.thelagroup.com
South Broadway Redevelopment
Saratoga Springs, New York
PB #18.XXX
Prepared For:
KCG Development, LLC
11555 N. Meridian Street, Suite 400
Carmel, IN 36032
Prepared By:
The LA Group, P.C.
40 Long Alley
Saratoga Springs, New York 12866
May 3, 2018
South Broadway Development
2016036
PROJECT DESCRIPTION
The project proposes a mixed-use building at the southwest intersection of South Broadway and
Canfield Street in the City of Saratoga Springs, NY. Access to the site is from South Broadway
and Union Street to the west. The site was formally occupied by the Spa City Diner. Included is
an internal parking structure on two levels with approximately 244 parking spaces. The building
is proposed to have 110 affordable housing units, 21,000 square feet of commercial office, 7,000
square feet of retail, and 7,500 square feet for an eating and drinking establishment.
There will be a mix of one and two-bedroom apartments in the buildings. For this study, the
breakdown is 66 two-bedroom and 44 one -bedroom units for a total of 176 bedrooms.
The restaurant and bar will have a capacity of 48 seats. In addition to the restaurant, there will be
a total of 28,000 square feet of commercial and retail space.
EXISTING CONDITIONS
Water Distribution — A 12 -inch ductile iron water main is present along the west side of South
Broadway. A hydrant flow test was conducted on March 27, 2018 at the corner of South
Broadway and Adelphi Street. The flow test indicated static pressures of 73 psi and a residual
pressure of 63 psi with the hydrant flowing at 1,060 gallons per minute. The theoretical available
fire flow at 20 psi is 2,607 gallons per minute. See Attachment A for hydrant flow test
information.
Sanitary Sewer — An existing 10 -inch sanitary sewer main runs along the sidewalk to the east of
South Broadway and flows to the north, then west down Canfield Street where it picks up flows
from Union Street and continues north along Union Street. The City gravity collection system
eventually takes the wastewater to the Saratoga County Sewer District Pump Station at High
Rock Avenue and Warren Street. From there the wastewater is pumped to County trunk lines and
the treatment plant in Mechanicville.
SEWER AND WATER USAGE
The table below provides information on the anticipated average potable water use and
wastewater flow rates for the project. Water use and wastewater flow are estimated to be equal
for this study.
1
South Broadway Development
2016036
Table - Average Daily Flow (ADF)
Restaurant: (48 seats) x (35 gpd/seat)1 =
Commercial: (28,000 square feet) x (0.10 gpd/sf)1 =
Apartments: (176 bedrooms) x (110 gpd/ bedroom)1 =
Total =
Summary of Design Flows
1,680 gpd
2,800 gpd
19,360 gpd
23,840 gpd
Average daily flow for wastewater is estimated to be 22.1 gallons per minute (gpm) based on an
18 -hour day. Estimated peak hourly flow is 89.9 gpm (4.07 x average).2
Average daily demand for water is estimated to be approximately equal to the wastewater flow
or 22.1 gpm. Instantaneous peak demand is estimated at 548 gpm based on the table below:
Restaurant: (48 seats) x (1 gpm/seat)3 =
Commercial: (28,000 square feet) x (0.01 gpm/s03 =
Apartments: (110 residences) x (2 gpm/residence)3=
Total =
48 gpm
280 gpm
220 gpm
548 gpm
For the purposes of input into the City of Saratoga Springs water model, we offer the following
estimated water demands for the project:
• Average Day Demand is 22.1 gallons per minute (GPM) over the 18 -hour period.
• Max Day Demand is 44.2 gallons per minute (GPM) based on twice the average.
• Peak Hourly Flow is 89.9 gallons per minute (GPM) based on 4.07 times the average.
• Fire Flow Demand is 1,000 gallons per minute (GPM) per ISO guidelines.
PROPOSED CONDITIONS
Water Distribution — To service the project, the existing 12 -inch main along the western portion
of South Broadway will be tapped to provide a 6 -inch combined fire protection and domestic
service lateral to the building. A combined fire protection and domestic waterline will be
brought to the building's mechanical room where the domestic line will tee off and be metered.
Fire suppression for the building will be provided by fire sprinklers. The nearest fire hydrants
are located on South Broadway just north of the intersection with Canfield Street (on the block in
front of Saratoga National Bank); on South Broadway south of the project site in front of Mavis
Tire; at the intersection of Union Street and Canfield Street and at the intersection of Union
Street and Adelphi Street.
2
South Broadway Development
2016036
The minimum needed fire flow (NFF) is 1,000 gallons per minute at 20 psi for a duration of two
hours according to the Insurance Services Office Guide for Determination of Needed Fire Flow
for residential occupancies protected by an automatic fire sprinkler system. The existing hydrant
on South Broadway in front of Mavis Tire was tested on March 27, 2018 and the estimated flow
at 20 psi was 2,607 gpm which exceeds the minimum fire flow requirement.
Connections and appurtenances, including tapping sleeves, mechanical joints, tees, isolation
valves, thrust blocks, trenching, bedding, as well as testing and disinfection will all be specified
in accordance with City of Saratoga Springs standards.
Sanitary Sewer — Sanitary sewer service for the project will be provided by the City of Saratoga
Springs sewer main along Canfield Street. A 6 -inch PVC sewer service from the proposed
building will wye into the existing 8 -inch sewer main. The existing 10 -inch main has a slope of
0.16%. The sewer lateral will maintain a minimum slope of 2%.
A grease trap will be provided for the restaurant kitchen wastewater. The interceptor will be
sized according to current NYSDEC, PDI (Plumbing and Drainage Institute) and Uniform
Plumbing Code requirements.
All sanitary sewer mains, laterals, manholes and manhole connections will be furnished, installed
and tested according to City of Saratoga Springs standards.
1. From Table B-3, NYSDEC Design Standards for Intermediate Sized Wastewater Treatment Systems,
dated March 5, 2014
2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities
Q = (18 + P %) ± (4 + P 1/2) where P = population in thousands
3. Table XIV - Ameen Community Water Systems Fifth Edition
3
ATTACHMENT A
HYDRANT FLOW TEST DATA
7ixpr.,e% Eaatf 7ze ptratectiog swe/44d Toe,
P.O. BOX 508 BURNT HILLS, N.Y. 12027 (518) 885-1115 FAX (518) 885-0526
HYDRANT FLOW TEST REPORT
LOCATION:\AJ.LY
TEST BY: PRDT P LY:AAN
DATE:
X1'2171 1 TIME: 2' P
TARGET HYD. LOCATION (B) NoELPH 1
TEST RESULTS: STATIC PRESSURE (B) PSI
RESIDUAL PRESSURE (B) C ? PSI WITH ) O(, D GPM FLOWING AT (A)
RESIDUAL PRESSURE (B) PSI WITH GPM FLOWING AT (A)
FLOW HYD. LOCATION (A)TV,/. ) SOD -1 Lam= C-41*Yr--) L•�l j
1) PORT FLOWED (A) DIAMETER 22-
2) PORT FLOWED (A) DIAMETER
3) PORT FLOWED (A) DIAMETER
1) PITOT or FLOW METER READING (A) 4D PSI AT ) C,V GPM
2) PITOT or FLOW METER READING (A) PSI AT GPM
3) PITOT or FLOW METER READING (A) PSI AT GPM
OUTLET COEFFICIENT USED 1(,)P.) 0
(smooth 0.90) (square & sharp 0.88) (projecting into barrel 0.77)
- r3 r".i- 13):"34- 02.17= ) i 176 OCi-5) CX 0( O. -41,)
-
ESTIMATED FLOW AT 20 PSI Q O7 GPM
LOCATION SKETCH ATTACHED ? YES X NO
N1.85 GRAPH
CONTRACT NO _ SHEET NO OF
NAME: V:29--.Z?l�S�V0,/ .,j i�E'...A,V_ .41' Z�}q 1 SYSTEM O.
ADDRESS: f DATE: .i 9 -
MULTIPLY SCALE BY ► 0
PSI C�
M
N
0
a m �
.;
i
L'
•
GEM 4323 PRINTED IN U.S.A.
ISd
0
PTR. 2180
1°0
C7
a
0
I
o
, I IT
!
I
1 r +
1 1
H
.t_
it
• I-
r
._ i I
1— - -- -
j
L— }
-
l
i.-
-
r ;
D
'--- ---- -.--4- --
r— _
L—_
I
f
_ - -- .
T
�I'
T _
' I
j
r
!_
- 1."`
L
4-----
.
�sNm�
1111111
I1
7
Masins.
t
! i
i
--•W} .
i
IMMIMMILI
WI
Ta=11=1..mum
1=11111111,1
aomotoroommomoomon
it limn
IIMINIMIlin
nowammo
iniA
i
.4_
.....
Ailam
....
.
.
,,_,... T....._
........
�:.i—�--
�i
r
.i���'��r��`
Mine
�
MININSII
I it
I ,. ,,.�
iii
.
II..
I. + I
•�
lllC
.;
•I
illi
i
1'l
� .,
1!.i
I
GEM 4323 PRINTED IN U.S.A.
ISd
0
PTR. 2180
1°0
C7
a
0
CANFIELD STREET
1
HYD. A
PITOT - 40 psi
FLOWING - 650 gpm
Y.
BR
MAVIS TIRE
ADELPHI STREET
HYD. B 4.—
STATIC - 73 psi
RESIDUAL - 63 psi
1
2"
II
ADWAY
BRIADWAY
SARATOGA SPRINGS - WATER FLOW TEST - 3-27-2018