Loading...
HomeMy WebLinkAbout20211169 1 Pearl Final Subdivision Application irurt urriuc uaci **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** ocA s, CITY OF SARATOGA SPRINGS (Application#) ' r PLANNING BOARD (Date received) CITY HALL-474 BROADWAY • 4,t41, 1 SARATOGA SPRINGS, NEW YORK 12866-2296 /A/"L'«ncRA7fo �� TEL:518-587-3550 X2533 www.saratoga-spfings.org (Project Title) Check if PH Required n APPLICATION FOR: n PRELIMINARY n✓ FINAL SUBDIVISION Staff Review Property Address/Location: # 1 Pearl St. Tax Parcel#: 165.42-2-22.2 Zoning District: R-2 (for example: 165.52-4-37) ORR/SR1 -Conservation Subdivision Checklist Required Total Acres: 0.33 acre (14,520 sf) Land to be Subdivided Into: 2 Lots APPLICANT(S)* OWNER(S)(If not applicant) ATTORNEY/AGENT Name One Pearl St., LLC (same) Engineering America Co. Address 212 Miro Ave.,Mountain View,CA 94041 76 Washington St.,Saratoga Springs Phone 518 /587 - 1340 Email ghanus@hotmail&hallumrp@gmail.com tonyay@nycap.rr.com Identify primary contact person: 0 Applicant 0 Owner Agent *An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Has a previous application been filed with PB for this property? NO n YES n If YES, include Application TYPE and DATE: Does any City officer, Does any City officer, employee or family member the of have a financial interest(as defined by General Municipal Law Section 809) in this application? YES NO . If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the Planning Board for the identified property above. I agree to meet all requirements under the Subdivision Regulations for the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Applicant Signature: Date: 11/,/ If applicant is not current owner, owner must also sign. Owner Signature: Date: Application Fee: Make checks payable to the "Commissioner of Finance". REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Revised 1/2021 Check City's website(www.saratoga-springs.orq)for meeting dates. „Kvocii CITY OF SARATOGA SPRINGS PLANNING BOARD 7 CITY HALL-474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 , ” 'o • TEL: 518-587-3550 X2533 4,c0%RATE° 1' www.saratoga-springs.org PRELIMINARY/ FINAL SUBDIVISION APPROVAL REQUIRED SUBMITTAL CHECKLIST Checklist Prepared By: Engineering America Co.,Tonya Yasenchak, PE Date: 11/23/21 Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs' Subdivision Regulations. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital copy of ALL materials and Fee are required. CHECK EACH ITEM 1. Completed Subdivision Application la. Conservation Subdivision Checklist if required 2. SEQR Environmental Assessment Form-short or long form as required by action. 3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than I"=50 feet). One digital version (PDF) of all submittal items printable to scale ✓ 4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary 7. Complete Streets Checklist 8. Project Cost Estimate for Letter of Credit(utilize City template) REQUIRED ITEMS ON SUBDIVISION PLAT,AS APPLICABLE: 1. Name of Subdivision 2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. 3. North arrow and map scale City of Saratoga Springs Subdivision Checklist 1 r-i1' j 4. Location of proposed home on each lot including finish floor elevation to nearest tenth foot. I� I 5. Parcel tax map number 6. Site location map (with title block and map key) u 7. Site vicinity map (all features within 300 feet of property) n8. Identification of current zoning district with corresponding area and bulk requirements C9. Building setback lines, either listed or shown on plans 10. Title block with subdivision name; name and address of applicant; and name and address of property owner(if different) I' 1 I I I. Name, address and phone number of subdivision surveyor and/or engineer ri ✓ 12. Names of all adjacent property owners within 300 feet(include both sides of street) -,j 13. Identification of size, material,elevations, and slopes of all existing and proposed utilities within 400 ft u of site. k14. Parcel street address (existing and any proposed postal addresses) C15. Incorporate the City's standard engineering details. Yes No N/A rnn r✓n 16. Identification of existing or proposed easements, covenants or legal rights-of-way on this property C17. References to all prior variances or special use permits Ii F-671 Eii 18. Existing and proposed contours and spot grades (at 2 foot intervals)extending to property boundary I v ' 19. Identification of all watercourses,designated State wetlands,buffers, Federal wetlands, floodplains, rock outcroppings,etc. j v( [ ❑ 20. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and u condition) f [ ✓ 21. Location, design specifications and construction material for all proposed site improvements(drains, culverts, retaining walls, berms, fences, etc.) nri 22. Location and distance to fire hydrant ' 23. n Erosion and sediment control plan—including designated concrete truck washout area I- ' n I 1 I- 24. Approximate location, dimensions and areas for proposed lots and proposed public recreational land n 1 1 n L 25. Proposal for utility systems and lateral connections nI- I 26. Location and width of proposed streets City of Saratoga Springs Subdivision Checklist 2 2021 LAND USE BOARD FEE WORKSHEET OPED Fees Type 2021 Fee Application to Zoning Board of Appeals[1][2] TOTAL #VARIANCE UseVariance $1100+$50/app Area Variance-Residential $275/var+$50/app+$125eachadd'I variance Area Variance-Multi-Family,Comm,Mixed-Use $660/var+$50/app+$200eachadd'I variance Interpretations $550+$50/app Post-Work Application Fee Add 50%App fee+$50/app Variance extensions 50%ofApp fee+$50/app Application to Design Review Commission[1] TOTAL #STRUCTURE Demolition l $385 Residential Structures Principal $55 Accessory $55 Extension $35 Modification $55 Multi-Family,Comm,Mixed-UseStructures Sketch $165 Principal $550 Extension $200 Modification $330 Multi-Family,Comm,Mixed-UseAccessory,Signs,Awnings Principal $140 Extension $75 Modification $140 Post-Work Application Fee Add 50%App fee Application to Planning Board[1] TOTAL #STRUCTURE Special Use Permit[2] $990+$50/app Special Use Permit-extension $330 Special Use Permit-modification[2] $450+$50/app Site Plan Review-incl.PUD: Sketch Plan $330 Residential $330+$200/unit Residential-extension $200 Residential-modification $400 Non-residential $660+$130/1000 sf Non-Residential-extension $300 Non-Residential-modification $650 Subdivision-incl.PUD: TOTAL #LOTS Sketch Plan I $330 Preliminary Approval[2] Residential:1-5 lots $660+$50/app Residential:6-10 lots $990+$50/app Residential:11-20 lots $1320+$50/app Residential:21+lots $1650+50/app Residential-extension $330 Final Approval[2] Residential 1545 1 $1320+$175/lot+$50/app Non-Residential $2000/lot+$50/app Final Approval Modification[2] Residential $330+$50/app Non-Residential $550+$50/app Final Approval Extension Residential $135 Non-Residential $330 Other: TOTAL #LOT/ACRE Post-Work Application Fee Add 50%App fee Lot Line Adjustment $350 Letter of Credit-modification or extension $440 Letter of Credit-collection up to 1%ofLoC Recreation Fee $2000/lotorunit Land Disturbance $660+$55/acre SEQRA EIS Review(Draft&Final) TBD Legal Noticing if PB requires Public Hearing $50/app [1] Fees arebased on per structure,except where noted. $1,545.00 TOTAL DUE [2] Legal ad required;includes City processing and publishing For Administrative Use Total Paid at Intake Revised Fee Balance Due / Balance Paid Staff approval Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1—Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1—Project and Sponsor Information Name of Action or Project: One Pearl St.-Minor Subdivision Project Location(describe,and attach a location map): #1 Pearl St. -Located at North West corner of Pearl St.and Van Dorn St.intersection Brief Description of Proposed Action: Minor Subdivision of one existing residential lot into(2)residential lots. Lot#1 will be a vacant residential building lot. Lot#2 includes the existing lot and house at the intersection corner Name of Applicant or Sponsor: Telephone: One Pearl St.,LLC E-Mail: hallumrp@gmail.com Address: 212 Miro Ave. City/PO: State: Zip Code: Mountain View CA 94041 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that ❑ may be affected in the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other government Agency? NO YES If Yes, list agency(s)name and permit or approval: ❑ 3. a.Total acreage of the site of the proposed action? 0.333 acres b.Total acreage to be physically disturbed? < 0.25 acres c. Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 0.333 acres 4. Check all land uses that occur on,are adjoining or near the proposed action: 5. ❑ Urban ❑ Rural(non-agriculture) ❑ Industrial ❑ Commercial m Residential(suburban) ❑ Forest ❑ Agriculture ❑ Aquatic ❑ Other(Specify): ❑ Parkland Page 1 of 3 5. Is the proposed action, NO YES N/A a. A permitted use under the zoning regulations? ❑ ❑✓ ❑ b. Consistent with the adopted comprehensive plan? ✓ ❑ NO YES 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? ❑ ❑✓ 7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes, identify: ❑✓ ❑ NO YES 8. a. Will the proposed action result in a substantial increase in traffic above present levels? ❑ El b. Are public transportation services available at or near the site of the proposed action? ❑ El c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed ❑ ✓❑ action? 9. Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements,describe design features and technologies: Any new residence is required to be in compliance with the current Energy Conservation Construction Code of NYS. 1-1 El Most often,a RES Check Energy Analysis &report are prepared for single family residence permit plan documents. 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: ❑ ❑✓ 11. Will the proposed action connect to existing wastewater utilities? NO YES If No, describe method for providing wastewater treatment: ❑ ❑✓ 12. a. Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district NO YES which is listed on the National or State Register of Historic Places,or that has been determined by the ❑ Commissioner of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? b. Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for ❑ ❑✓ archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory? 13. a. Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES wetlands or other waterbodies regulated by a federal,state or local agency? ❑ El b. Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? El ❑ If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: ** The box is"pre-checked"by the EAF Mapper program&cannot be"unchecked." There are no wetlands located on this existing residential lot within an established,developed urban residential block. Page 2 of 3 14. Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply: D Shoreline ❑ Forest ❑Agricultural/grasslands ❑ Early mid-successional ❑Wetland m Urban ❑ Suburban 15. Does the site of the proposed action contain any species of animal,or associated habitats,listed by the State or NO YES Federal government as threatened or endangered? El ❑ 16. Is the project site located in the 100-year flood plan? NO YES ❑✓ ❑ 17. Will the proposed action create storm water discharge,either from point or non-point sources? NO YES If Yes, n ❑✓ a. Will storm water discharges flow to adjacent properties? ✓ b. Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? Irl ri If Yes,briefly describe: 18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES or other liquids(e.g.,retention pond,waste lagoon,dam)? If Yes,explain the purpose and size of the impoundment: 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES management facility? If Yes,describe: 1-1 r—� 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed) for hazardous waste? If Yes, describe: Z ❑ I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor/name: hNr,q G����'+>�F/.'�K� P. Date: ill 2.312-1 Signature: AlfTitle: AC-ert I/p. PRINT FORM Page 3 of 3 EAF Mapper Summary Report Wednesday, November 17, 2021 12:31 PM Disclaimer: The EAF Mapper is a screening tool intended to assist •166ri2:243 'II 16 .42:2-4-3- project sponsors and reviewing agencies in preparing an environmental 11 l� assessment form(EAF).Not all questions asked in the EAF are 165.42-2 2 .'I l answered by the EAF Mapper.Additional information on any EAF 1�5 12 21 question can be obtained by consulting the EAF Workbooks. Although il '1(35.42-2-13 the EAF Mapper provides the most up-to-date digital data available to _ DEC,you may also need to contact local or other data sources in order I - \t I _ __ to obtain data not provided by the Mapper.Digital data is not a _ ��� substitute for agency determinations. • tiff+/.a el3"n real ill, II ii\-- I 165.42-2-251 Saratoga SpringP 165.42.2 2i I 165.42-2-22.2 Tor'oni -.- I ,1 1 165.42-2-26 11165.42-2-2• IIII III _�—� / t_i a 1i 4,, r,Ro crl n t r II „-rr. AthatlY �etrral4 _ • n' Boston — — -- _ 165.42-2-20 �t Pros+Ic1en,e t~levdt4hcl i --- _rIII 1 I 0 —— t NMI '.l.:u�i Pew York _ 3 •• ,Pittaburgh Columbus PI1.II.4de{phia 3armin;LI SGS,. Intern icI Ih,.1r REh;IENTP;NRCan;Esri Japan;hr1ETL_Esri Cllina {�ici'ri PKVic-E'sn t �tENT it'in.Esti;Japan F 1E 1 Esti China (Hong Kong',Esri Korea;Esri cf}iailatie'fi, NGCC;(ci Op t SteeKa l 1aI� origj lgiv;1 Jirlthe wlS 4lser Comm unity c(tin6tper7Sb;e kF lap contribyiL.11 r,r�1+f'ie GIS UIserComm Linity Part 1 /Question 7 [Critical Environmental No Area] Part 1 /Question 12a [National or State Yes Register of Historic Places or State Eligible Sites] Part 1 /Question 12b [Archeological Sites] Yes Part 1 /Question 13a [Wetlands or Other Yes - Digital mapping information on local and federal wetlands and Regulated Waterbodies] waterbodies is known to be incomplete. Refer to EAF Workbook. Part 1 /Question 15 [Threatened or No Endangered Animal] Part 1 /Question 16 [100 Year Flood Plain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Part 1 /Question 20 [Remediation Site] No Short Environmental Assessment Form - EAF Mapper Summary Report r CITY TES S���T��°Rrv�P����xxS=�oR�ry"°orv= .rorvEs 1� SITE ` o .,5A,.�.... �,.o.T .,o�.T7xrv�TErv�nEEx7o�� ____,. C' /: . oPLoSPTOrvL:Dg'E EG,.ENM'IRE nTR'OH n)Sx Pgig TO - ° ° lL ryuG w�. a^ ,o o.n corvsaucT�ory ions Nus ee�sceusneo Pre�ore e I ri Ilk rw,e .m areoisc� °gore it,wv eLasTirv�is recauwso core°nE a.n ,. W CFsEF:i.F4T'Er „ n ate°oa aiw*or wnv ar°Nc ore r ow�rvP ar sEO Mcry oa oCATICN�MAP 1 �T L / i i _.,.� ” e rya refs 764 o a Puede reono, 24'7, moz� " m of ..__ DaFBRNB,neoNeMEn.=o„n<<,.ErvrvEEn. � L�.®,b, .;; Nil 1 A VI 44' �,... NOTES .. � 1, - SENE' _ om9 Lc PFxom R sac ,;O f, F an,n M MR, OFFS,OS,DIMENSIONS ,-4 ONS ARE MEASURED __ NNGINFo INFORMATION. ZONING �_ IT� � �NNN Le. 7:-7 a_ ..__ °l a r=ksoo so e VICINITY MAP Niry ao�” ry senew) m Q Z MAANIPM PERCENT OF LOT TO [OCCUR,av_ ww ; DIMENSIONS: m,ws„,r,, (g/EY DANIEL WHEELER LS A ® oxva0Lerv0.a lriCIATES,LLC . . NryE, ,e eE,,,,,E,.LE 2sPROFESSIONAL.OBBB Hi;<sxiOini se si a�,,oz F: sle3-,,os PEARL STREET 1T LLC 212 R& E. IVW.CA 94041 PHONE 050) 22<-0793 PLANNING BOARD PROJECT NO. °.i.s.LIG no.so.i s7 TTne: EXISTING CONDITIONS PLAN I8I CEfT1F1CATION SUBDIVISION OF LANDS OF E .""„Extz,xE'"Ery <°-;,T °T.,,"x"°°x"n ,nxmxx= 1 PEARL STREET LLC —u vmuue xu m".xa x,v DATE CIN OF SARATOGA SPRINGS OCTOBER 18,2021 NSSIEDIRIT(INSIDE RDCT NEW TOW = AT°Vex,"E ,.a gaixx= `""1P°`P50X SCALE1 INCH=10 FEET MAIHNO.2021-06-06 CITY OFSASATOGASP9INNS-STAND090 NOTES. a7� w.uF -v�x, 1 mrcrc,.0rvs Oreo rv.wtts reu�rs,w0 rerauu.0rvs vwors ' . MPO1I CMC ____ ..,"m 9op ",ora"s n,._.n ei.m ' .,»3 ux c'1 E.vorsnren.ocnsPrexcsrxcxrrresarrcr. ro""E ..i Y 5 _ 4 ._ A0 n:Ocnnary mPre0o-r0 av.nr G.v rvOirvrrre MA� 1 LU DESIGNATED REPRESENT..ARE REQUIRED THE COSI OF THE 3.43006.1 MEM NET IOW r. SIBUIL OF v,� �� _ Oax=Nus rer ESTABLISH.PRIOR .a ANY CONSTRUEAax S _., CO IS r 1 ® areFµ,a�x =reaarem R,NE I a r ARM UT �mnw� �xrov _ �a naFF,as A x.aF w<.Or�. ,.saFF.Aa�as r mmmm € z w I w, orrere�7 ax.a A 90NUE reams are r,a�xa Ora�MrM are -B B = L Corea EA ,re r ,NrreranreMrx.E ror,NrE,.rNrr aNre. ._--11011/1M11011011/1M110r x,,, ,..,, r r Y ..,....mow NING N. m..�,..a al d — .,�,... T.o w. .��m.,�,,.,� . ,o.,.� `L low ao ucn��io:4?o,,conerv�rvosrvere�nrvo srurret _ 0` .w^..x::r..'BPm i ��rp"" - .a. _____ 7iR 1S Z DIMENSIONS' E _ 1 f OOR ARE. :¢ W �e 1MANIMIES!'NEIFFOT!HT:DO FT L —.-,- A tiZ PIN..DISTANCE NNa=F.ACCESSORY .Na.aSTABILIZED DONS NOcnON ENTRANCE < PRINCIPAL ...LG.... ,,rex „,ax� g '''' � N x,OF,a.,a 9F PFNNEADu GOO 1':EI�T=O7C'O°�to PWrI1`a1" Art ° „ � ENGINEERING AMERICA CO EY DANIEL C-WHEELER LS ENGINE � �� �.� ,,.I .ren `' CRATES,LLC ON PRO SSIONAL a�... ,�._. =e�T a.sPNNO�.x�,TOrex .77.7.7 0 PEARL, EN,01<is�,302 rA%(518irels•3—,,0, rere , . . . . , , , STREET. I. . , , . . «D 212 MIRO AVE 1AOUNT .CA 94041 F.,,,, PNONEI(0sloi 224-0793 M :m DEED REFERENCE a PLANNINGnOOARD PROJECT NO. 00000050 °couN.v E�rrevs or0cr as Jrm Na Pr.uc.x0.005000 P.L$.NE.N0.5a.,37 TTn,E SUBDIVISION PLAN PARCEL INFORMATION CERTIFICATION: SUBDIVISION OF LANDS OF !Awn!,,xE ,1„„s.,E ,r,onr!!!'rrGrex„u,rm,re„s 1 PEARL STREET LLC .o., ` «xCIN OF RnTCOn SPRINGS DATE TOEER,a.2021 (INSIDE DISTRICT)165 —- s, uxxw0 w00r,xmvwo-,mwwos SARAIDA Y.NEW TOTAL FOES 1 x„ SCALE 1 INCH=10 FEET MAPNO.2021-06-06 „,. It. ... .. .... • ... —V.5.triga:',.. _th' L L' '.417.T.Z.1.76•47:71;rair:37:1"EaFaiLy \'''''' ... 'N.,'\ H = ,t, at'egerVe.ccrearrti'Vlir:reeprout,=====on Y.' num4sicrwmmEeNimuana.a. ........,..' , 7' II%''."1.'`..71 _ __ .....,,,,,,,. ..: , = n I rgeFEI1577ifia7a1FiriFonS7E:775542aTeL nat 11 d d 1) . ., . t. ..... ...,..,.,.......,,7:4...r.-:1-...m*..**-0-81,4,--.:.-',4*-„MV"",",,,,,--1,,,,,,-- —r.w.--"Pg,"..n.r,=---^--------—--—--- -''.'. ,_,;,-°_.*.•"z .W4.1...7,§‘,....:-.4't'..-,....--——---- '''''.E`,1'...; U¶LITY SEPARATIONS PARALLEL AND OROSSING BUILDING DRAIN LAYOUT NTS L,L. 5.' 71.,I.D5LTI.R55K'''''.44..r:R4.71.,,G4/34 ! .r, .., ,L...0?„:1117,-...i.°ATI.-`,-Afiti-1,7,--TaTt. --- ....- r...,7, ,„Er7,r,- s.n. ,,,,,-=Kr:- .:,.... lc_OF SARATOGA SPRINGS,NEW YORK.,. ,,,,,,„ ary OF SARATOGA SPRLYGS,NOW YORE w L L,,,,, .m................................,........... s , ems Ewen GdID -4. aterEVIT.Z41/4N;Vaigeit---1;2 '„,,,,,„ 4 ;:e4--Y,i!'ar— II * —..—,„, ,E,„„„,,,,, '• 14°--- ..-...,..,, ..„..... „,,..v.i,,, ,,, - ..071.7—2 'rrwron,r,rmzv—.. 'Winr,t-r:irtd..r.Ttrnj.W:' ' ..N.”- ' 'A'll'iC.M' :..':Prgiiigiro-•-.0 TYPE 2-VEHICLE TRAFFIC LOADIRCI'A'CUDTriWAYS, V.f:-..'--4i,EF . , 'Ai7P5i'''gr°312,.!..1gT,f -MBWEgietkiW142r'''- WATER SERVICE 711.41.171.4.1=EFtaFir...7...n°447,7".7...4,TIAlr,IFL.m...w,...,.... PIPE TRENCH-SECTION op... ,......,.. ,,,v,°,0 IralrogtliATOGA SPRINeGoS,„NEWre,eYwO7kr: 7:7:,,,,t.o... ,L,,v.,0 ICIIL,O,EXATOOA SPRINGS7Z0„1!Ithr: .:.=..... i/Lsgo. 1 SaZ„Tr""Se';'“;,],rseYr7ctl::: i..n.',....., ii rUni'VE71:TFO:'`- ---------------- ;•=r---— *„„-i7-73; ................ ——-------- „..., TREE PLANTING DETAIL °.;.4...g.'..Mr.'=.” Egt...' -.........._--- , 1• 1• 0' .'-i'''.1fi' •( o,,-L-- P GN cos, arNinernease Lo5 ,-, e sNII a.. RO'1'.c:e5 aLal An'.... 1./.1.9/20t0 CITY OF SARATOGA SPRINGS.NEW CORE,,,, nwrxin,ROAM —Mt— STANDAR°DETAIL Tree Planting 1.-1 ----- - .,..., ,raMar,ESTari124,E=L1161.1Trt TX Tar.".......r..."A=len 717-- ;Irg,4,=7:.:,,,. ......!=..7.7,17—.........,.................., DROP CURB AT RESIDENTIAL DRIVEWAY ENGINEERING AMERICA CO. IfialEY DANIEL C INGIEELER LS ASPHALT PAVEMENTYTTMriCIATES,LLC NTS SARZECtr:IIIR'I'I'LGLV YORK PROFESSIONAL LANG 000VEY.10 -Puvimws-Irtcom-'""'' 'Arri 7:1.:°'°:"!''''""ARrnsph71,(NPO:veYrne'rirss-7-.WWWW.-....-'"'"' A14—'" FILMTcp'e"1"DrStv'eTZS51111(SIll ISO-loll.(R'''eSide5n0I:)r-:: Iii ereoAow,SUITE 5 SARATOGA SPRINGS.NY 1325ER (518)585-7502 PAP(5.1e)5.83-7.303. °INNEN DE/EL DE UNall. 212 MIRO AVE .......... . 1AOUNTAIN VIEW.CA 94041 PHONE 050)zza-0793 ./........,.., on,...um ...re...mu ,DLL ...KYR. :4.., PLANNING BOARD PROJECT NO. t I., '.,t'•..... -..: `14"4",9',74...... .....r. ' --1,-,.----4-.,..,.,.„ res.c., SW01R DETAILS pLs oc No 55,5y DANIEL C SCIEELER SUBDIVISION OF LANDS OF ... zwE-rtz;;IfE'n.-va,°-;.,T^m,7,74-:0,73F'zrE=Lcr,,,rfm,,,,s 1 PEARL STREET LLC SANITARY SEWER SERVICE-SEC,ON OPTI CURB-CAST-IN-PLACE/SEP FORM CONCRETE AT TURF SI"” una PLS.LK NO.DOLL LOCNIION °ATE ......,....,..................F.a.............E.,............a.-,. (INSIDE DISTRICT) OCTOBER 18,2021 "M'' ',7,4::: =Hamm .144—'n 1 T...0.'0.1-7,'..707,cs:',,rsevr',',nr,:: ,,,,,EA.ANr.1-=,,,E.,,,,xAgalp.... SARATOGA COUNTY,NEW YORK SCALE cx.HREnsox I °ATE''.E° 1 INCH=10 FEET DAMN°2021-06-04 ENGINEERING AMERICA CO . 76 WASHINGTON ST . SARATOGA SPRINGS , NY 1 2 8 6 6 5 1 8 / 5 8 7 - 1 3 4 0 E - MAIL : T O N Y A Y@ N Y C A P . R R . C O M TRANSMITTAL SHEET TO: FROM: Planning Board Tonya Yasenchak COMPANY: DATE: City of Saratoga Springs November 23,2021 FAX NUMBER: TOTAL NO.OF PAGES INCLUDING COVER: 6 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: YOUR REFERENCE NUMBER: 1 Pearl St —2 Lot Subdivision Water,Sewer&Basic SWPPP 0 URGENT Q FOR REVIEW 0 PLEASE COMMENT 0 PLEASE REPLY 0 AS REQUESTED ENGINEERING REPORT: INTRODUCTION: Engineering America Co. has been retained by the applicants / owners, 1 Pearl St. LLC to provide land planning and site/civil engineering services in connection with the 2 lot subdivision application for 1 Pearl St. in the City of Saratoga Springs, Tax Map# 165.42- 2-22.2. Subdivision approval will be required from the Planning Board which includes all requirements listed on the City of Saratoga's Preliminary/Final Subdivision Approval Required Submittal Checklist. This report is intended to fulfill items 4 & 6 of the Required Items part of the Preliminary/Final Subdivision approval checklist. DESCRIPTION OF INTENDED SITE DEVELOPMENT& USE: The site, #1 Pearl St., is located at the North West intersection of Pearl St& Vandorn St. in Saratoga Springs,New York. The 14,520 sq. ft. lot has an existing two family residential building. The existing building is accessed by driveway at the East of the site, along Van Dorn St. The lot area is nearly level. The property is mostly grassy with a couple landscaping shrubs and only a few trees. The proposed subdivision of this parcel would result in dividing the single lot into two lots. The existing structure is proposed to remain. A new single family residence is proposed to be located on the 7,200 sq. ft. lot to the West (designated as Lot 1 on the map). The new curb cut is proposed at the far West side of the new lot, intended for the new driveway along Pearl St., to accommodate a new house in compliance with zoning setbacks and provision of a minimum of 2 off road parking spaces along with an option for a detached garage structure. The new lot to be created to the West of the existing structure,would be subdivided from the main parcel and marketed for sale as a residential building lot. The new Lot 1 is proposed to be 7,200 sq.ft.in area. The remaining Lot#2,with the existing structure,is proposed to be 7,320 sq. ft. in area. Development on each lot would be in compliance with the requirements of Table 3 of the City of Saratoga Springs Zoning Ordinance as shown on the subdivision plans. WATER REPORT: Currently, there are 4 bedrooms within the existing two family dwelling on the property. Using a standard demand of 110 gallons per capita day (gpcd), the existing property can be estimated to have an annual water consumption usage of 160,600 gallons. Assuming that the new lot will accommodate a single family residence with 3-4 total bedrooms the annual water consumption would increase by 160,600 gallons per 4 bedroom house per year. Therefore, both houses are expected to have a total demand of 321,200 gal/ year (A total net increase of 160,00 gallons per year from existing conditions). There is a 4" D.I.P water main located in Pearl St. which services the existing structure and will service the new residence. A new 1" water service connection is proposed for the new lot. SANITARY REPORT: There are 4 bedrooms within the existing two family residence. Using a standard sanitary sewer of 110 gallons per capita day (gpcd) the existing property can be estimated to have an annual sanitary load of 160,600 gallons. Assuming the new lot will be a single-family dwelling containing 3-4 bedrooms, the annual sanitary load for the new lot will be approx. 160,600 gallons / year. The total sanitary load is proposed at 321,200 gal/year(net increase of 160,600 gallons per year from existing conditions). 2 There is an 8" sanitary sewer main located in Van Dorn St. directly to the East of the existing residence. The existing residence appears to be currently connected to this main via a 4" sanitary service exiting at the approximate mid-point of the building. There is a 6" clay tile sanitary sewer main located in Pearl St. The proposed new single family residence on Lot #1 would be expected to use a 4" diameter PVC service line connecting to this main. The additional load from the construction of the new residence is not expected to tax the capacity of the municipal system. STORMWATER&BASIC SWPPP/EROSION CONTROL SOIL CONDITIONS: The project site is relatively flat. Soils on this site are, GaB — Galway Loam with hydrologic group B. According to Saratoga County Soil surveys, this soil is classified as loamy, moderately deep and moderately well drained with slopes of 3-8%. Soil properties include moderate permeability, slow surface runoff and slight erosion hazard. Depth to bedrock in areas of such soils is typically 20-40" with no flooding hazard. Basement height in a dwelling may be limited due to the potential low depth to bedrock. SEDIMENT& EROSION CONTROL: A sediment and erosion control plan has been developed in order to specify minimum controls and measures to reduce sediment runoff during construction. - Construction Entrance: One construction entrance has been specified at the far West of the new Lot#1 to accommodate the proposed new driveway and off street parking. - Topsoil: A potential topsoil storage area for foundation backfill and topsoil will be identified (possibly towards the rear / Northern portion of the new Lot #1) and will be surrounded by silt fencing. In general, excavated soil for the foundation that will not be retained for backfill and topsoil grading will be required to be removed from the site. - Concrete Wash: A Concrete wash area has been noted on the plans. - Sediment Control: Less than 0.17 acres are anticipated to be disturbed during construction. Silt fencing has been specified around the perimeter of the proposed new Lot#1,within the project area to limit off site erosion migration. 3 \ """"1 v,,• City of Saratoga Springs d& '14: 1 f'.. Department of Public Works „ , s . r 15 Vanderbilt Avenue(temporary address) Anthony J. Scirocco VCommissioner • x;- ,, Saratoga Springs,NT 12866 %`OA.ORAT t)'`''' (518) 587-3550 of ce Joseph J. O'Neill www.saratoga-springs.org Deputy Commissioner NEW WATER SERVICE CONNECTION AGREEMENT & APPLICATION FORM Property Owner's Name One Pearl St., LLC Project Name (if applicable) #1 Pearl St. Subdivision Property Address #1 Pearl St., Saratoga Springs, NY Tax Map#: 165.42- 2- 22.2 Size of Tap (check one below) $/4 " 1" Greater than 1" A unit of water shall be defined as 14,000(fourteen thousand) cubic feet of water per year. Contact the Utilities Department at ext. 2502 for assistance with water use estimation and meter specifications before signing below. Number of Dwellings: (1) New Dwelling Estimated Cubic Feet of Water per Year 21,470 cut. To be completed in full without any contingencies or protest, on or before the Building Inspector approval of the rough plumbing, including the installation of the water meter, or at the time of the issuance of a tapping permit. The undersigned represents to the City that they have full and complete authority to execute this document and find and commit the developer to abide by the City Water Ordinance. This agreement shall be binding on all of the undersigned transferees. The undersigned acknowledges that a copy of this document will be delivered to appropriate and necessary governmental entities. Authorized Signature Print Name 11r t-1cs./ i✓`. Company Name&Address One Pearl St., LLC -212 Miro Ave., Mountain View, CA 94041 Company Phone Number gen Iiiri 13?7 Fax Number Date /07A. ****************************************************************************************** Department of Public Works Approval Date: City of Saratoga Springs Complete Streets Checklist Saratoga Springs Complete Street Policy Vision (May 2012) The City of Saratoga Springs Complete Streets Policy will encourage the development of a complete streets network throughout the City to create a more balanced transportation system. The Policy shall be consistent with and assist in achieving the goals and recommendations set forth in the City's Comprehensive Plan and other policy documents. The Policy shall ensure new and updated public and private projects are planned, designed, maintained and operated to enable safer, comfortable and convenient travel to the greatest extent possible for users of all abilities including pedestrians, bicyclists, motorists and transit riders. This checklist is intended to assist the City in achieving its vision for complete streets. Project Name: #1 Pearl St. Subdivision Date: 11/22/21 Project Location / Limits: # 1 Pearl St., Saratoga Springs Project Description: Minor(2) lot subdivision: Lot#1 -Vacant Building Lot& Lot#2 - Existing house Instructions: For each box checked, please provide a brief description for how the item is addressed, not addressed, or not applicable and include supporting documentation. Street Classification (identify street or streets within the project area) Principal arterial ❑ Minor arterial ❑ Mixed use collector ❑ Mixed use local ❑ Residential collector ❑ Residential local ❑■ Special use street ❑ EXISTING CONDITIONS Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description Existing Bicycle&Pedestrian Operations Do bicycle and pedestrian accommodations exist? (see page 2 for ® ❑ ❑ Sidewalks exist streetside examples) Existing Transit Operations Do transit facilities exist within the study area, including bus and ❑ N ❑ No bus routes along Pearl or VanDorn train stops/stations? Is the project area on a transit route? (CDTA Service Routes) ® ❑ ❑ CDTA Bus Route along Church St.nearby Are there bicycle racks, shelters, or parking for transit riders ❑ lIl ❑ available? Existing Access and Mobility Do connective opportunities exist with schools, hospitals, senior ❑ ® ❑ care or community centers or persons with disabilities within Sidewalks provide connection project area? Are there gaps inhibiting continuous access between schools, ® ❑ ❑ hospitals, senior care, or community centers or persons with Sidewalks are not continuous disabilities within project area?" Project Area Context Are there prominent landmarks, recreation, shopping, employment is ❑ ❑ center, cultural centers or other key destinations that offer Saratoga Hospital walking distance opportunities to connect this site? Please list and/or describe planning or policy documents addressing bicyclist, pedestrian, transit, or truck/freight use for the project area. Examples can include: City of Saratoga Springs Comprehensive Plan, City of Saratoga Springs Open Space Plan,Capital District Transportation Committee Bicycle/ Pedestrian Priority Network, City Standard Details, etc. City of Saratoga Springs Complete Streets Checklist 1 PROPOSED DESIGN Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description Complete Streets Design Bicyclist accommodations? ❑ I ❑ Pedestrian accommodations? ❑ I ❑ Access and Mobility accommodations? ® ❑ ❑ Sidewalks remain and/or to be repaired as nec Transit accommodations? ❑ IN ❑ Truck/freight accommodations? ❑ II ❑ Streetscape elements? ® ❑ ❑ Street lights and trees proposed along Pearl St Bike Facilities: Off-roadway bike ❑ Yes 111 No❑NA accommodations Pedestrian Facilities: Dedicated bike lane El Yes ❑No ❑■NA Sidewalks on both sides of 0 Yes ❑No❑NA Shared-use lane ❑ Yes ❑No INA the street Shoulder ❑ Yes ❑No INA Striped crosswalks ElYes ❑No DNA Acceptable actuated traffic El Yes ❑No ❑■NA Geometric modifications ❑ Yes ❑No INA to reduce crossing signal bike detection, including distances such as curb turn lanes Do signals allow adequate ElYes ❑No INA extensions(e.g. bulb outs) Acceptable provision for ElYes ❑No INA minimum green time for pedestrian traffic signal bicyclist to safely cross intersection? features (e.g. ped. buttons) Signage and pavement ❑ Yes INo ❑NA Pedestrian signage for 111 Yes ❑■No ❑NA markings specific to proposed crossing &wayfinding Safety islands/medians on ❑ Yes ❑No INA bike facilities Bicycle safe inlet grates ElYes ❑No INA roadways with two or more Bicycle parking, eg. bike racks, ❑ Yes INo INA traffic lanes in each direction bike lockers Enhanced supplemental ❑ Yes INo LINA pedestrian treatments at Transit Facilities: uncontrolled marked Transit shelters ❑ Yes EINo INA crossings Bus turnouts 11Yes ❑No DNA Standing pads 1=1Yes ❑No ❑INA Connectivity: Has CDTA been contacted? 111 Yes INo DNA Are there proposed El Yes INo DNA connections to other bike Access and Mobility Facilities: paths, pedestrian facilities, or Adequate sidewalk or paved I Yes ❑No DNA transit facilities? path Are there proposed ❑ Yes INo DNA Acceptable I Yes ❑No DNA connections to any key consideration/provision for destinations listed on page 1? accessible pedestrian traffic Are there proposed I Yes ❑No DNA signal features connections to Curb ramps, including ❑ Yes INo LINA neighborhoods? detectable warning Streetscape Elements: surface Are streetscape elements I Yes ❑No DNA Acceptable slope and I Yes ❑No DNA proposed such as cross-slope for driveway ramps, landscaping, street trees, sidewalks, crossings) planters, buffer strips, etc? Have conflicts been reduced ❑ Yes ❑ No I NA Pedestrian-level lighting I Yes ❑No DNA among pedestrian, bicyclists, and motor vehicles (access Public seating or benches ❑ Yes ❑■No DNA management)? Design Standards and Guidelines Design meets guidelines such as described below for I Yes ❑No ❑NA Describe Existing developed area bicycle/pedestrian/bus/transit facilities? *American Association of State Highway and Transportation Officials(AASHTO)-A Policy on Geometric Design of Highway and Streets, Guide for the Development of Bicycle Facilities and AASHTO Guide for the Planning,Design, and Operation of Pedestrian Facilities;Public Right-of-Way Accessibility Guide(PROWAG); Manual on Uniform Traffic Control Devices(MUTCD1;Americans with Disabilities Act Accessibility Guidelines(ADAAG); National Association of City Transportation Officials(NACTO)-Urban Bikeway Design Guide.New York State Department of Transportation— Highwav Design Manual City of Saratoga Springs Complete Streets Checklist 2 Cost Estimate for Letter of Credit: # 1 Pearl St. LLC - 2 Lot Subdivision Planning Board No.: #202102... Project: 1 Pearl St. LLC-2 Lot Subdivision Location: 1 Pearl St. Saratoga Springs, NY Date: 11/23/2021 Firm Name&Preparer: Engineering America Co. -Tonya Yasenchak, PE Page 1 of 3 On Site (All infrastructure &amenities on private property) Item# Item/Remarks Quantity Unit Unit Cost Subtotal %Complete Reduced $ Site Preparation and Grading 1 Clearing &Grubbing 1 AC $800.00 $800.00 0% $800.00 2 Rough Grading 270 CY $3.00 $810.00 0% $810.00 3 Silt Fence 360 LF $2.00 $720.00 0% $720.00 4 Construction Entrance 1 EA $250.00 $250.00 0% $250.00 5 Buffer Protection 0 EA $0.00 $0.00 0% $0.00 6 Misc. Erosion Control Measures 0 EA $0.00 $0.00 0% $0.00 Demolition 7 Building Removal (House, Garage&Shed) 0 EA $10,000.00 $0.00 0% $0.00 8 Asphalt Removal 0 SF $3.00 $0.00 0% $0.00 9 Concrete Removal(Cut sidewalk for new drive) 60 SF $3.00 $180.00 0% $180.00 Hard Scape 10 Stone Subbase (Driveway) 21 CY $25.00 $525.00 0% $525.00 11 Asphalt Pavement(Driveway) 1,130 SF $13.00 $14,690.00 0% $14,690.00 12 CIP Curbing 0 LF $20.00 $0.00 0% $0.00 13 Concrete Sidewalk 100 SF $7.50 $750.00 0% $750.00 14 Retaining Wall 0 LF $0.00 $0.00 0% $0.00 Site Amenities 15 Traffic Signs 0 EA $0.00 $0.00 0% $0.00 16 Striping 0 LS $0.00 $0.00 0% $0.00 17 Crosswalk 0 LS $0.00 $0.00 0% $0.00 18 Bench 0 EA $0.00 $0.00 0% $0.00 19 Bike Rack 0 EA $0.00 $0.00 0% $0.00 20 Site Lighting 0 EA $0.00 $0.00 0% $0.00 21 Fencing 0 LF $0.00 $0.00 0% $0.00 Site Water 22 6" DIP Class 52 Water Main 0 LF $0.00 $0.00 0% $0.00 23 3/4"Type K Copper Water Service 0 EA $0.00 $0.00 0% $0.00 24 1"Type K Copper Water Service 1 EA $2,000.00 $2,000.00 0% $2,000.00 25 Water Fittings 0 LS $0.00 $0.00 0% $0.00 26 Fire Hydrant Assembly 0 EA $0.00 $0.00 0% $0.00 1 Pearl St-Cost Estimate Rev 11-23-21 Page 2 of 3 Item# Item/Remarks Quantity Unit Unit Cost Subtotal %Complete Reduced $ Site Sanitary 27 6"SDR-26 Sanitary Line&Stone 20 LF $15.00 $300.00 0% $300.00 28 8"SDR-26 Sanitary Line&Stone 0 LF $0.00 $0.00 0% $0.00 29 Manhole Structure 0 EA $0.00 $0.00 0% $0.00 Site Storm 30 6" HDPE Storm Drain&Stone 0 LF $0.00 $0.00 0% $0.00 31 12" HDPE Storm Drain&Stone 0 LF $0.00 $0.00 0% $0.00 32 Catch Basin 0 EA $0.00 $0.00 0% $0.00 33 Manhole Structure 0 EA $0.00 $0.00 0% $0.00 34 Yard Drains 0 EA $0.00 $0.00 0% $0.00 Stormwater Management 35 Bioretention Area 0 EA $0.00 $0.00 0% $0.00 36 UG Infiltration Chambers 0 EA $0.00 $0.00 0% $0.00 37 Hydrodynamic Separator 0 EA $0.00 $0.00 0% $0.00 38 Wet Pond 0 EA $0.00 $0.00 0% $0.00 Landscaping 39 Topsoil/Seed/Mulch 270 CY $15.00 $4,050.00 0% $4,050.00 40 Deciduous Trees 0 EA $250.00 $250.00 0% $0.00 41 Shrubs 0 EA $0.00 $0.00 0% $0.00 Total onsite Work $25,325.00 $25,075.00 Total onsite X.25 $6,331.25 $6,268.75 Off Site (All infrastructure &amenities to be dedicated to the City) Item# Item/Remarks Quantity Unit Subtotal %Complete Reduced $ Road Construction 42 Stone!Subbase 6 CY $25.00 $150.00 0% $150.00 43 Asphalt Pavement(Binder) 164 SF $10.00 $1,640.00 0% $1,640.00 44 Asphalt Pavement(Top) 164 SF $13.00 $2,132.00 0% $2,132.00 45 Concrete Curbing 25 LF $20.00 $500.00 0% $500.00 46 Concrete Sidewalk 60 SF $7.50 $450.00 0% $450.00 Site Amenities 47 Traffic Signs 0 EA $0.00 $0.00 0% $0.00 48 Striping 0 LS $0.00 $0.00 0% $0.00 49 Crosswalk 0 LS $0.00 $0.00 0% $0.00 50 Street Signs 0 EA $0.00 $0.00 0% $0.00 51 Decrotive Street Light 2 EA $3,250.00 $6,500.00 0% $6,500.00 Off Site Water 52 6" DIP class 52 Water Main 0 LF $0.00 $0.00 0% $0.00 53 6" Mueller Gate Valve 0 EA $0.00 $0.00 0% $0.00 54 8" DIP class 52 Water Main 0 LF $0.00 $0.00 0% $0.00 55 8" Mueller Gate Valve 0 EA $0.00 $0.00 0% $0.00 56 S.S.Tapping Sleeve and Valve Connection 0 EA $0.00 $0.00 0% $0.00 57 3/4" Corp,WSO and Type K water service to PL 0 EA $0.00 $0.00 0% $0.00 58 1" Corp,WSO and Type K water service to PL 1 EA $1,500.00 $1,500.00 0% $1,500.00 59 Water Fittings 0 LS $0.00 $0.00 0% $0.00 60 Fire Hydrant Assembly 0 EA $0.00 $0.00 0% $0.00 61 Testing&Disinfection 1 LS $250.00 $250.00 0% $250.00 1 Pearl St-Cost Estimate Rev 11-23-21 Page 3 of 3 Item# Item/Remarks Quantity Unit Subtotal %Complete Reduced $ Site Sanitary 62 SDR-35 6"Sanitary Service to PL&Stone 1 EA $1,500.00 $1,500.00 0% $1,500.00 63 SDR-35 8"Sanitary Main&Stone 0 LF $0.00 $0.00 0% $0.00 64 Manhole Structure 0 EA $0.00 $0.00 0% $0.00 65 Kor N'Seal connection 1 EA $125.00 $125.00 0% $125.00 Site Storm 66 12" HDPE Storm Line&Stone 0 LF $0.00 $0.00 0% $0.00 67 Catch Basin 0 EA $0.00 $0.00 0% $0.00 68 Manhole Structure 0 EA $0.00 $0.00 0% $0.00 Landscaping 69 Topsoil/Seed/Mulch 8 CY $15.00 $120.00 0% $120.00 70 Street Trees 3 EA $300.00 $900.00 0% $900.00 Misc. 71 As-built Drawing 1 LS $2,400.00 $2,400.00 0% $2,400.00 Total offsite Work $18,167.00 $18,167.00 Total On-Site Work X25% $6,331.25 Total Off-Site work $18,167.00 Total LOC Amount= $24,498.25 *New LOC Reduced Amount= $24,435.75 City LOC Approval/Date City LOC Reduction Approval/Date *LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75%= $6,124.56 1 Pearl St-Cost Estimate Rev 11-23-21