Loading...
HomeMy WebLinkAbout20210764 13 Bowman Subdivision LLC Cost Estimate for Letter of Credit PB#20210764 Project No: 2021020 Project: Miller 13 Bowman Street Location: 13 Bowman Street Saratoga Springs, New York Date: 11/23/2021 Item Quantity Unit Unit Cost Subtotal ON-SITE WORK Site Preparation and Grading Erosion Control (including silt fence & inlet prot.) 1 LS $1,000.00 $1,000.00 Site Clearing and Preparation 1 LS $2,000.00 $2,000.00 Construction Entrance 2 EA $500.00 $1,000.00 Utility 6" PVC Sanitary Lines 12 LF $30.00 $360.00 E/one Grinder Pump 2 EA $4,000.00 $8,000.00 1-1/4" HDPE Sanitary Force Main 65 LF $25.00 $1,625.00 Forcemain fitting and valves 1 LS $600.00 $600.00 Copper Water Service/Connection 25 LF $40.00 $1,000.00 On-Site Total $15,585.00 On-Site Total X 0.25 $3,896.25 OFF-SITE WORK Seed R.O.W. 1 LS $500.00 $500.00 Concrete Walk 600 SF $6.00 $3,600.00 Pavement Patch (Granular Backfill, Subbase, Binder) 200 SF $5.00 $1,000.00 Decorative Lights 1 EA $3,000.00 $3,000.00 1-1/4" HDPE Sanitary Force Main 30 LF $25.00 $750.00 Sanitary Sewer Connection 2 EA $500.00 $1,000.00 Copper Water Service/Connection 35 LF $40.00 $1,400.00 Curbing 85 LF $25.00 $2,125.00 As Built Drawings 1 LS $2,500.00 $2,500.00 Off-Site Total $15,875.00 Letter of Credit Amounts Total on-site work x 0.25 $3,896.25 Total off-site work $15,875.00 Total $19,771.25 L.O.C. amount $20,000.00