HomeMy WebLinkAbout20211156 63 Henning Site Plan Review Application **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** fFOR OFFICE USE1
"CA �ryA CITY OF SARATOGA SPRINGS (Application#)
ti ja PLANNING BOARD
(Date received)
,% CITY HALL-474 BROADWAY
v r `•� .� SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
~cORPofta��o 9 www.saratoga-springs.org (Project Title)
Staff Review
APPLICATION FOR:
SITE PLAN REVIEW
(INCLUDING PUD)
**Application Check List-All submissions must include completed application check list and all required items.**
Property
Address/Location:63 Henning Road
Tax Parcel #: 166.-3-23 Zoning District:RR-1
(for example: 165.52-4-37)
Project Description:
Expand the existing barn to include 7 more horse stalls to allow for increased recovery stalls for treatment of
horse during track season and beyond.
Date special use permit granted (if any): Date zoning variance granted (if any): 01/13/14
Has a previous application been filed with PB for this property?: DNO YES
If YES, include Application TYPE Site Plan Application and DATE: 3/10/14
Is property located within (check all that apply)?: 0 Historic District 0 Architectural Review District
Q 500' of a State Park, city boundary, or county/state
highway
APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT
Name Rood and Riddle Real Estate The LA Group
Address 2150 Georgetown Rd, Lexington, KY 40511 40 Long Alley, SS, NY 12866
Phone 859-233-0371 518-587-8100
Email mbrobston@thelagroup.com
Identify primary contact person: 0 Applicant 0 Owner 8 Agent
* An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in
question.
Revised 1/2021
City of Saratoga Springs-Site Plan Review Application 1
REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital copy of ALL materials
Application Fee: Make checks payable to the "Commissioner of Finance".
REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
Check City's website (www.saratoga-springs.org) for meeting dates.
Does any City officer, employee or family member thereof have a financial interest (as defined by General
Municipal Law Section 809) in this application? YES NO X . If YES, a statement disclosing the
name, residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan
Review by the Planning Board for the identified property above. I agree to meet all requirements under
Section 240-7.2 of the Zoning Ordinance of the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property
associated with this application for purposes of conducting any necessary site inspections relating to this
application.
Alan J. Ruggles Digitally signed by Alan J. Ruggles 11/11/2021
Applicant Signature: Date: 2021.11.12 08:13:25-05'00' Date:
If applicant is not current owner, owner must also sign.
Owner Signature: Date:
City of Saratoga Springs-Site Plan Review Application 2
1oc_4 -4> CITY OF SARATOGA SPRINGS
PLANNING BOARD
A h�
CITY HALL-474 BROADWAY
vfrr SARATOGA SPRINGS, NEW YORK 12866-2296
ti
%c TEL: 518-587-3550 X2533
ORPORA-mo www.saratoga-springs.org
SITE PLAN REVIEW SUBMITTAL CHECKLIST
Listed below are the minimum submittal requirements for site plan review as set forth in The City of
Saratoga Springs' Zoning Ordinance Appendix B. The Planning Board reserves the right to request
additional information, as necessary, to support an application. The Board also reserves the right
to reject the application if these minimum requirements are not met. Please complete the checklist
below and provide with your submission.
REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital copy of ALL materials
CHECK EACH ITEM
1. Completed Site Plan Application (3 hard copies-*1 w/original signature - and 1 digital) and Fee
2. SEQR Environmental Assessment Form- short or long form as required by action.
3. Set of plans including: (3) large scale plans (sheets must be 24"x 36", drawn to a scale of
not more than 1"=50 feet). One digital version (PDF) of all submittal items printable to scale
4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242.
I=1 NA 5. Copy of signed DPW water connection agreement for all projects involving new water
connections to the City system
6. Engineering Report for Water and Sanitary
7. Complete Streets Checklist
8. Project Cost Estimate for Letter of Credit (Utilize City Template)
REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE:
1. Property line survey prepared by a licensed land surveyor. Site plan must reference such
survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the
original property survey must also be included.
2. North arrow and map scale
3. Parcel tax map number
4. Site location map (with title block and map key)
✓❑ 5. Incorporate the City's standard engineering details
City of Saratoga Springs Site Plan Checklist 1
6. Site vicinity map (all features within 300 feet of property)
7. Identification of zoning district with corresponding area requirements
8. Building setback lines, either listed or shown on plans.
9. Title block with project name; name and address of applicant; and name and address of
property owner(if different)
10. Project Name
111 11. Name of all adjacent property owners within 300 feet (Include both sides of street)
12. Parcel street address (existing and any proposed postal addresses)
Yes No N/A 13. Identification of all existing or proposed easements, covenants or legal rights-of-way on this
❑ 1111 property
CO 14. References to all prior variances or special use permits
1-0 112 nl 15. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary
VII E Q 16. Identification of all spoil, borrow, storage, or staging areas
EQ D1 17. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands,
floodplains, rock outcroppings, etc.
VII E Q 18. Erosion and sediment control plan —including designated concrete truck washout area
ld li 19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and
condition)
Z ul 20. Location, design specifications and construction material for all proposed site improvements
(drains, culverts, retaining walls, berms, fences, etc.)
lel 13 21. Location and distance to fire hydrant
VII E Q 22. Identify size, material, elevations and slopes of all existing and proposed utilities with 400' of site
❑I ID 0 23. Parking lot layout plan and identification of all loading areas (number all spaces)
Ell IQ lT 24. Parking demand calculations
▪ 1 25. Identification of parking spaces and access points for physically impaired persons
IZE 26. Location and screening plan for dumpster or recycling bins
❑ ❑I 27. Location, design, type of construction and materials, proposed use and exterior dimensions of
all buildings (existing and proposed) on site including finish floor elevations to nearest tenth foot.
® 28. Identification of storage of any potentially hazardous materials
❑ ❑ 01
29. Planting plan identifying quantity, species and size of all proposed new plant materials.
Label existing plant material to be retained or removed.
❑I ID 0 30. Lighting plan showing type, location and intensity of all existing and proposed exterior
lighting fixtures
Checklist prepared by: Matthew Brobston Date: 11/11/2021
City of Saratoga Springs Site Plan Checklist 2
2021 LAND USE BOARD FEE WORKSHEET
OPED Fees Type 2021 Fee
Application to Zoning Board of Appeals[1][2] TOTAL #VARIANCE
Use Variance $1100+$50/app
Area Variance-Residential $275/var+$50/app+$125 eachadd'I variance
Area Variance-Multi-Family,Comm,Mixed-Use $660/var+$50/app+$200 eachadd'I variance
Interpretations $550+$50/app
Post-Work Application Fee Add 50%App fee+$50/app
Variance extensions 50%ofApp fee+$50/app
Application to Design Review Commission[1] TOTAL #STRUCTURE
Demolition I $385
Residential Structures
Principal $55
Accessory $55
Extension $35
Modification $55
Multi-Family,Comm,Mixed-Use Structures
Sketch $165
Principal $550
Extension $200
Modification $330
Multi-Family,Comm,Mixed-Use Accessory,Signs,Awnings
Principal $140
Extension $75
Modification $140
Post-Work Application Fee Add 50%App fee
Application to Planning Board[1] TOTAL #STRUCTURE
Special Use Permit[2] $990+$50/app
Special UsePermit-extension $330
Special UsePermit-modification[2] $450+$50/app
Site Plan Review-incl.PUD:
Sketch Plan $330
Residential $330+$200/unit
Residential-extension $200
Residential-modification $400
Non-residential 985 2500sf $660+$130/1000 sf
Non-Residential-extension $300
Non-Residential-modification $650
Subdivision-incl.PUD: TOTAL #LOTS
Sketch Plan I $330
Preliminary Approval[2]
Residential:1-5 lots $660+$50/app
Residential:6-10 lots $990+$50/app
Residential:11-20 lots $1320+$50/app
Residential:21+lots $1650+50/app
Residential-extension $330
Final Approval[2]
Residential $1320+$175/lot+$50/app
Non-Residential $2000/lot+$50/app
Final Approval Modification[2]
Residential $330+$50/app
Non-Residential $550+$50/app
Final Approval Extension
Residential $135
Non-Residential $330
Other: TOTAL #LOT/ACRE
Post-Work Application Fee Add 50%App fee
Lot Line Adjustment $350
Letter of Credit-modification or extension $440
Letter of Credit-collection up to 1%ofLoC
Recreation Fee $2000/lotorunit
Land Disturbance $660+$55/acre
SEQRA EIS Review(Draft&Final) TBD
Legal Noticing if PB requires Public Hearing $50/app
[1] Fees are based on per structure,except where noted. $985.00 TOTAL DUE
[2] Legal ad required;includes City processing and publishing
For Administrative Use
Total Paid at Intake
Revised Fee
Balance Due
/ / Balance Paid Staff approval