HomeMy WebLinkAbout20211116 1 Veteran's Way Special Use Application Verdant
ARCHITECTURE
LETTER OF TRANSMITTAL
11/8/2021
To: Amber Upton,Administrative Assistant From: Timothy Wade
Organization: City of Saratoga Phone: (518) 587-3550 ext. 2533
474 Broadway,3rd Flr, Ste. 32, Saratoga Springs,
Address: NY 12866
Re: Special Use Permit Application CC: Solomon Kupferstein
Urgent For Review Please Comment Please Reply Please Recycle
Comments:
Amanda,
Enclosed, please find:
(3)Three copies of Application for Special Use Permit Modification
(1)One check for associated application fees
We are requesting an increase to the previously approved SUP dormitory occupancy of
180 occupants (all male or all female)to the maximum allowed by current codes.
Please contact me directly at:
timothy@verdantarchitecture.com
or
(518)490-2040 ext. 100
with any questions or additional information requests.
It is our hope that this application qualifies for Administrative Approval by the
Chairperson as the requested action does not require an increase to parking or alter the
existing impermeable or building coverage.
Many thanks,
Timothy Wade I Architect
AIA I NCARB I LEED AP bd+c
Verdant Architecture ► PO Box 308 0 Ballston Spa, NY 12020 0 (518)490-2040
HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED!!
JFOR OFFICE USE1
fj CITY OF SARATOGA SPRINGS (Application#)
t_ ;r PLANNING BOARD
- 4.1t
CITY HALL-474 BROADWAY
�. " d SARATOGA SPRINGS, NEW YORK 12866-2296 (Date received)
°RPCRATEo TEL: 518-587-3550 X2533
www.saratoga-springs.org
(Project Title)
APPLICATION FOR: Check if PH Required
SPECIAL USE PERMIT
Staff Review
Property 1 Veteran's Way
Address/Location:
Tax Parcel #: 166.-1-21 Zoning District:UR-2 with a SUP for private school
(for example: 165.52-4-37)
Proposed no change of use- intended use remains a private school - request increase to previously approved SUP
occupancy of 180 occupants to the maximum allowable by current code standards and requirements
Use:
Type of Special Use Permit: ❑ Permanent ❑ Temporary ❑ Renewable Modification
APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT
Name Yeshiva Pardas Yosef Verdant Architecture, PLLC
1 Veteran's Way, Saratoga Springs, Po Box 308, Ballston Spa, NY
Address NY 17RAA 17n7n
Phone (718) 683-3610 (518 490-2040
bnosbelz@gmail.com timothy@verdantarchitecture.com
Email
Identify primary contact person: 0 Applicant El Owner IN Agent
* An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in
question.
Has a previous application been filed with PB for this property? NO YES ✓❑
If YES, include Application TYPE SUP and DATE: Approved 12/6/2000
Please check the following to affirm information is included with submission.
❑ Sketch Plan Attached:
Applicant is encouraged to submit sketch plans showing features of the site and /or neighborhood and illustrate
proposed use.
O Environmental Assessment Form:
All applications must include a completed SEQR Short or Long Form. SEQR Forms can be completed at http://
www.dec.ny.gov/permits/6191.html.
❑ Water Service Connection Agreement- For all projects including new water connections to the City system,
a copy of a signed water service connection fee agreement with the City Department of Public Works is
required and MUST be submitted with this application.
Revised 1/2021
City of Saratoga Springs p.1 of 2
Application for Special Use Permit
REQUIRED ITEMS: *3 hard copies (1 w/original signature), 1 digital PDF copy of ALL materials and Fee.
Application Fee: Make checks payable to the"Commissioner of Finance".
REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
X
Does any City officer, employee or family member thereof have a financial interest (as defined by General
Municipal Law Section 809) in this application?YES NO X . If YES, a statement disclosing the
name, residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Special Use
Permit approval by the Planning Board for the identified property above. I agree to meet all requirements
under Section 240-7.1 of the Zoning Code of the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the
property associated with this application for purposes of conducting any necessary site inspections relating to
this application. �lM
Applicant Signature: ✓v Date: II 126(
If applicant is not current owner, wner must also sign.
Owner Signature: l`�–�— Date it a (?
Check City's website (www.saratoga-springs.org) for meeting dates.
City of Saratoga Springs p.2 of 2
Application for Special Use Permit
2021 LAND USE BOARD FEE WORKSHEET
OPED Fees Type 2021 Fee
Application to Zoning Board of Appeals[1][2] TOTAL #VARIANCE
Use Variance $1100+$50/app
Area Variance-Residential $275/var+$50/app+$125 eachadd'I variance
Area Variance-Multi-Family,Comm,Mixed-Use $660/var+$50/app+$200 eachadd'I variance
Interpretations $550+$50/app
Post-Work Application Fee Add 50%App fee+$50/app
Variance extensions 50%ofApp fee+$50/app
Application to Design Review Commission[1] TOTAL #STRUCTURE
Demolition I $385
Residential Structures
Principal $55
Accessory $55
Extension $35
Modification $55
Multi-Family,Comm,Mixed-Use Structures
Sketch $165
Principal $550
Extension $200
Modification $330
Multi-Family,Comm,Mixed-Use Accessory,Signs,Awnings
Principal $140
Extension $75
Modification $140
Post-Work Application Fee Add 50%App fee
Application to Planning Board[1] TOTAL #STRUCTURE
Special Use Permit[2] $990+$50/app
Special UsePermit-extension $330
Special Use Permit-modification[2] 1 1 Exist'g $450+$50/app
Site Plan Review-incl.PUD:
Sketch Plan $330
Residential $330+$200/unit
Residential-extension $200
Residential-modification $400
Non-residential $660+$130/1000 sf
Non-Residential-extension $300
Non-Residential-modification $650
Subdivision-incl.PUD: TOTAL #LOTS
Sketch Plan I $330
Preliminary Approval[2]
Residential:1-5 lots $660+$50/app
Residential:6-10 lots $990+$50/app
Residential:11-20 lots $1320+$50/app
Residential:21+lots $1650+50/app
Residential-extension $330
Final Approval[2]
Residential $1320+$175/lot+$50/app
Non-Residential $2000/lot+$50/app
Final Approval Modification[2]
Residential $330+$50/app
Non-Residential $550+$50/app
Final Approval Extension
Residential $135
Non-Residential $330
Other: TOTAL #LOT/ACRE
Post-Work Application Fee Add 50%App fee
Lot Line Adjustment $350
Letter of Credit-modification or extension $440
Letter of Credit-collection up to 1%ofLoC
Recreation Fee $2000/lotorunit
Land Disturbance $660+$55/acre
SEQRA EIS Review(Draft&Final) TBD
Legal Noticing if PB requires Public Hearing $50/app
[1] Fees are based on per structure,except where noted. $1.00 TOTAL DUE
[2] Legal ad required;includes City processing and publishing
For Administrative Use
Total Paid at Intake
Revised Fee
Balance Due
/ / Balance Paid Staff approval
Short Environmental Assessment Form
Part 1 -Project Information
Instructions for Completing
Part 1—Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as
thoroughly as possible based on current information.
Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the
lead agency;attach additional pages as necessary to supplement any item.
Part 1—Project and Sponsor Information
Yeshiva Pardas Yosef, 1 Veteran's Way,Saratoga Springs,NY 12866
Name of Action or Project:
1 Veteran's Way Special Use Permit Occupancy Increase Request
Project Location(describe,and attach a location map):
1 Veteran's Way,Saratoga Springs,NY 12866
Brief Description of Proposed Action:
Requesting a modification to a special use permit to increase the occupancy of the dormitory use. No work or construction is proposed. It does not
seem that the requested increase in occupancy will impact environmental resources in the municipality as no physical work will be taking place.
Name of Applicant or Sponsor: Telephone:p (718)683-3610
Yeshiva Pardas Yosef E-Mail:
bnosbelz@gmail.com
Address:
311 Dahill Rd.
City/PO: State: Zip Code:
Brooklyn NY 11218
1. Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES
administrative rule,or regulation?
If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that ❑✓ ❑
may be affected in the municipality and proceed to Part 2. If no,continue to question 2.
2. Does the proposed action require a permit,approval or funding from any other government Agency? NO YES
If Yes,list agency(s)name and permit or approval: ❑✓ ❑
3. a.Total acreage of the site of the proposed action? 4.22 acres
b.Total acreage to be physically disturbed? 0.00 acres
c.Total acreage(project site and any contiguous properties)owned
or controlled by the applicant or project sponsor? 4.22 acres
4. Check all land uses that occur on,are adjoining or near the proposed action:
Urban ❑ Rural(non-agriculture) ❑ Industrial Commercial m Residential(suburban)
❑Forest ❑ Agriculture Aquatic ❑ Other(Specify):
❑Parkland
SEAF 2019
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations? ❑ ❑✓ ❑
b. Consistent with the adopted comprehensive plan? ❑ ❑✓ ❑
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
❑ ❑✓
7. Is the site of the proposed action located in,or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes,identify: ❑� ❑
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels? ❑ ❑
b. Are public transportation services available at or near the site of the proposed action? ❑ ❑
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed ❑ ❑✓
action?
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements,describe design features and technologies:
❑ ❑✓
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No,describe method for providing potable water:
❑ ❑✓
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No,describe method for providing wastewater treatment:
❑ ❑✓
12. a.Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district NO YES
which is listed on the National or State Register of Historic Places,or that has been determined by the ❑ El
of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the
State Register of Historic Places?
b.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for ❑✓ ❑
archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory?
13. a. Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES
wetlands or other waterbodies regulated by a federal,state or local agency? ❑✓ ❑
b. Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? ✓❑ ❑
If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres:
Page 2 of 3
14. Identify the typical habitat types that occur on,or are likely to be found on the project site.Check all that apply:
EShoreline ❑ Forest ❑Agricultural/grasslands ❑ Early mid-successional
❑Wetland ❑ Urban ❑ Suburban
15. Does the site of the proposed action contain any species of animal,or associated habitats,listed by the State or NO YES
Federal government as threatened or endangered?
❑✓ ❑
16. Is the project site located in the 100-year flood plan? NO YES
❑✓ ❑
17. Will the proposed action create storm water discharge,either from point or non-point sources? NO YES
If Yes, ❑✓ ❑
a. Will storm water discharges flow to adjacent properties? ❑ ❑
b. Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? ❑ n
If Yes,briefly describe:
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YE S
or other liquids(e.g.,retention pond,waste lagoon,dam)?
If Yes,explain the purpose and size of the impoundment: ❑ ❑
19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES
management facility?
If Yes,describe:
Z ❑
20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES
completed) for hazardous waste?
If Yes, describe:
❑� ❑
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: Timothy A.Wade Date: 11/8/2021
Signature: /— Title:Architect
PRINT FORM Page 3 of 3
Agency Use Only [If applicable]
Project:
Date:
Short Environmental Assessment Form
Part 2 -Impact Assessment
Part 2 is to be completed by the Lead Agency.
Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by
the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by
the concept"Have my responses been reasonable considering the scale and context of the proposed action?"
No,or Moderate
small to large
imp act imp act
may may
occur occur
1. Will the proposed action create a material conflict with an adopted land use plan or zoning ❑ ❑
regulations?
2. Will the proposed action result in a change in the use or intensity of use of land? ❑ ❑
3. Will the proposed action impair the character or quality of the existing community? ❑ ❑
4. Will the proposed action have an impact on the environmental characteristics that caused the ❑ ❑
establishment of a Critical Environmental Area(CEA)?
5. Will the proposed action result in an adverse change in the existing level of traffic or ❑ ❑
affect existing infrastructure for mass transit,biking or walkway?
6. Will the proposed action cause an increase in the use of energy and it fails to incorporate ❑ ❑
reasonably available energy conservation or renewable energy opportunities?
7. Will the proposed action impact existing: ❑ ❑
a.public/private water supplies?
b.public/private wastewater treatment utilities? ❑ ❑
8. Will the proposed action impair the character or quality of important historic,archaeological, ❑ ❑
architectural or aesthetic resources?
9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands, ❑ ❑
waterbodies,groundwater, air quality,flora and fauna)?
10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage ❑ ❑
problems?
11. Will the proposed action create a hazard to environmental resources or human health? ❑ ❑
PRINT FORM Page 1 of 2
SEAF 2019
Agency Use Only[If applicable]
Project:
Date:
Short Environmental Assessment Form
Part 3 Determination of Significance
For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a
particular element of the proposed action may or will not result in a significant adverse environmental impact,please
complete Part 3.Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that
have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency
determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting,
probability of occurring,duration,irreversibility,geographic scope and magnitude. Also consider the potential for short-
term,long-term and cumulative impacts.
❑ Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action may result in one or more potentially large or significant adverse impacts and an
environmental impact statement is required.
n Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action will not result in any significant adverse environmental impacts.
Name of Lead Agency Date
Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer
Signature of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer)
PRINT FORM Page 2 of 2
acos6
$OGA Sp
f? , 1.1 (rift/ of $arafoa $prin$s
i � yY PLANNING BOARD
yC0fpORM 0�9 -
CITY HALL
474 BROADWAY
SARATOGA SPRINGS, NY 12866
TELEPHONE 518-587-3550
RESOLUTION OF SPECIAL USE PERMIT
IN THE MATTER OF THE APPLICATION OF
NAME: ARONSON FAMILY CHARITABLE FOUNDATION
ADDRESS: 12 Jeffrey Place, Suite 2A
Monsey, New York 10952
Involving the premises, No. 1 Veteran's Way, in the City of Saratoga Springs, being
section 166.00, block 1, lot 17 on the assessment map in the said City, outside district.
WHEREAS, the applicant having applied for a special use permit for a private school
under the Zoning Ordinance of said City as amended, and due public hearing notice
having been duly given of a hearing on said application held on the 6 day of December,
2000.
WHEREAS, after due consideration, the Board makes the following resolution:
"The Board grants a permanent special use permit for a private school with the
following conditions:
1) The size of the parcel for this school shall not exceed 3.88 acres.
2) The structure in this facility shall be limited to 64,000 square feet
3) The school shall only be used as a boarding school with all students
residing on the premises.
4) The number of students in the school shall not exceed 180 and the
students shall be either be all male or all female, but no mix of the two.
5) The number of staff at the school shall not exceed 30.
6) The following facilities/uses are permitted to serve this school:
classrooms, administrative offices, dormitories and living quarters for
students and staff, dining facilities, indoor physical educational
facilities, library, outdoor swimming pool, social
/cultural/recreation/religious centers, physical plant maintenance and
operational facilities, infirmary and miscellaneous support facilities for
student and staff.
7) There shall be no outside storage permitted.
8) The site shall be developed in general conformance with the attached
sketch plan and building use summary. The City has the right to alter
the specific building footprint and lower the building heights during
the required site plan review and architectural review approval
process.
9) During any future review of the development for this site the City has
the right to review any off-site impact issues and require the applicant
to contribute a fair share to the resolution of such issues.
10)After the effective date of the special use permit granted in this
resolution the subject property shall not be used for the purposes
described in the prior use variance granted by the Zoning Board of
Appeals on April 15, 1985. The Board finds that the implementation or
continuation of said prior variance, together with the special use
permit granted here within would produce an adverse impact on the
neighborhood."
Dated: December 6,2000
ADOPTED by the following vote:
AYES: 4 NAYS: 2 ABSTAIN: 1
Date: February 20, 2001 -
Chair, Saratoga Springs Planning Board
Attachment
cc: M. Biffer, Building Inspector
Printer Friendly Report-Image Mate Online https://saratoga.sdgnys.com/report.aspx?file=&swiscode=411589&print...
Property Description Report For: 1 Veterans Way,
" Municipality of City of Saratoga Springs, Outside
Status: Active
Roll Section: Wholly Exem
Swis: 411589
Tax Map ID #: 166.-1-21
No Photo Available Property Class: 612 School
Site: COM 1
In Ag. District: No
Site Property Class: 612 - School
Zoning Code: INDL
Neighborhood Code: 15194
Total Acreage/Size: 4.22 School District: Saratoga Springs
Land Assessment: 2021 - $471,400 Total Assessment: 2021 - $4,603,300
Full Market Value: 2021 - $7,546,393
Equalization Rate: ---- Property Desc: S-10 B-B L-41Pta
2014/1260 Bb 48
Deed Book: 2009 Deed Page: 46545
Grid East: 688956 Grid North: 1552167
Owners
Cong &Yeshiva Pardes Yosef Dchasidei Belz
12 Jeffrey PI 12 Jeffrey PI
Monsey NY 10952 Monsey NY 10952
Sales
No Sales Information Available
Utilities
Sewer Type: Comm/public Water Supply: Comm/public
Utilities: Gas &elec
Inventory
Overall Eff Year Built: 0 Overall Condition: Normal
Overall Grade: Good Overall Desirability: 2
1 of 2 10/8/2021, 9:46 PM
Printer Friendly Report-Image Mate Online https://saratoga.sdgnys.com/report.aspx?file=&swiscode=411589&print...
Buildings
Eff
Basement Year Year Gross Floor
AC% Sprinkler% Alarm% Elevators Type Built Built Condition Quality Area (sqft) Stories
100 100 100 1 1987 Good Above 20894 2
Average
100 0 0 0 2003 Good Average+ 3540 1
O 0 0 0 2003 Fair Average+ 29667 3
O 0 0 0 2003 Fair Average+ 5574 3
Site Uses
Use Rentable Area (sqft) Total Units
School 59,675 50
Improvements
Structure Size Grade Condition Year
Pavng-asphlt 24000 x 4 Good Normal 1987
Canpy-w/slab 576.00 sq ft Good Normal 1987
Land Types
Type Size
Primary 4.22 acres
Special Districts for 2021
Description Units Percent Type Value
SE010-County sewer 0 0% 0
dist #1
Exemptions
Year Description Amount Exempt% Start Yr End Yr V Flag H Code Own 0/0
2021 RELIGIOUS $4,603,300 0 2001 0
Taxes
Year Description Amount
* Taxes reflect exemptions, but may not include recent changes in
assessment.
2 of 2 10/8/2021, 9:46 PM
Verdant
ARCHITECTURE
Written Evaluation of Occupancy Code Compliance for an Existing Dormitory
Project: 1 Veteran's Way Occupancy Code Evaluation
Project Owner: Yeshiva Pardas Yosef
Project Location: 1 Veteran's Way, Saratoga Springs, NY 12866
Documents Preparation: Record Documents prepared by Victor Carl Cinquino Architect,
Dated 18 January 2002, Revised 2-12-02
Evaluation Date: March 24, 2020
Evaluation Code: 2020 International Building Code as adopted by New York State and
10 NYCRR Subpart 7-2
Documents Referenced
For Code Evaluation: Record Documents prepared by Victor Carl Cinquino Architect,
Dated 18 January 2002, Revised 2-12-02
Drawing A1.01 First Floor Plan—Dormitory Wing/Dormitory Room
Drawing A1.02 Second Floor Plan—Dormitory Wing
Drawing A1.03 Third Floor Plan—Dormitory Wing
Drawing A2.01 First Floor plan—Sanctuary Wing
Drawing A2.02 Second Floor—Sanctuary Wing
Drawing A4.01—Elevations
Drawing A4.02 Elevations
Drawing A5.01 Building Sections
Drawings A 6.01 Wall Sections
Drawing A7.07 Schedules
Evaluation Goals
1. Visual evaluation of the existing building to determine general alignment with the Record Documents
provided.
2. Visual confirmation of the existing construction type,fire and smoke protection features, and fire
protection systems.
3. General code review for height and area compliance for the construction type noted.
4. Determine the gross floor area of each existing dormitory room and the associated bathing,
mechanical, lounge space, and restroom areas within the dormitory wing.
5. Determine the allowable occupant load for each space as a function of maximum floor area per
occupant relative to the areas of the individual spaces noted and the desired or alternate use.
6. Review Chapter 10 Means of Egress requirements relative to the maximum allowable occupant load
as determined by the 2015 IBC.
Verdant Architecture fir PO Box 308 r Ballston Spa, NY 12020 (518)490-2040
General Building Evaluation
Tax Map: 166.4-21
Zoning: UR-1 Urban Residential w/Special Use permit
Occupancy: A-3 w/R-2 Dormitory
Construction Type: II-A
Sprinkled: Yes (as confirmed by owner)
Fire Alarm: Yes (as confirmed by owner)
Monitored: Yes (as confirmed by owner)
Required Separation: A-3/R-2= 1hr(Sprinkled)
Existing Separation: A-3/R-2= 1hr
Height and Area (Type II-A):
Allowable Height: 85.00' (Sprinkled)
Actual Height: <85.00'
Allowable Stories(A-3): 4 Stories above grade(Sprinkled)
Actual Stories: 3 Stories above grade
Allowable Stories(R-2): 4 Stories above grade(Sprinkled 13R)
Actual Stories: 3 Stories above grade
Allowable Area (A-3): 46,500 sf
Actual Area: 1,783 sf
Allowable Area (R-2): 24,000 sf
Actual Area: 9,308 sf(1st floor dormitory), 9,304 sf ea. (2nd and 3rd floor
dormitory)
General Building Evaluation conclusion:The existing building, upon a visual inspection and review of the
Record Drawings, appears to meet or exceed allowable height and area requirements of the 2020 IBC.
2
Occupant Loads
Maximum Floor Area Allowances Per Occupant:
Dormitories: 50 gross
Locker Rooms: 50 gross
Mechanical Room: 300 gross
Note:
• Student lounge occupancy was determined using an occupant load of 50 gross per occupant
• Alternate classroom use for dormitory rooms was determined with a net floor area and a classroom
occupant load of 20 net per occupant, see note '3' below
• Restroom occupancy was determined based on the number of fixtures
Allowable Occupant Loads Per Area:
Room Name Room Area (sf) Occupant Load Factor Maximum Occupancy
Locker Room 963 gross 50 gross 24
Restroom N/A By Fixture Count 19
Mechanical Room 620 gross 300 gross 2
Student Lounge 639 gross 50 gross 12
ADA Dormitory Rooms 317 gross 50 gross 6(see note'2' below)
Dormitory Rooms 317—324 gross 50 gross 6(see note'1' below)
Dormitory Rooms D221 341 gross 50 gross 6(see note'1' below)
& D321
Dormitory Rooms D222 286 gross 50 gross 5 (see note'1' below)
& D322
Occupant Load Notes:
1. The maximum allowable occupancy for dormitory rooms is (6) six; however,the size and
configuration of the room allows for a maximum of(5)five twin beds if considering adequate and
safe circulation for the occupants. Room arrangements are open to alternate configurations with a
maximum of(5)five twin bed footprints and six occupants (see attached room layout diagram).
Examples:(5)five twin size beds=(5)occupants; (3)three twin size bunk beds=(6)occupants;(2)
two twin size bunk beds and two twin size beds=(6)occupants.
Occupant Load Notes(continued):
2. The maximum allowable occupancy for ADA dormitory rooms is (6)six; however,the size and
configuration of the room allows for a maximum of(3)three twin beds if considering adequate and
safe circulation for the occupants. These could be arranged as (3)twin size bunk beds. If occupants
are confined to wheelchairs,a (3)three twin bed arrangement is acceptable.
3
Egress Requirements
R-2 Total Occupancy
First Floor: 153 occupants(max. occupancy)
Ritual Bath 24 occupants
Toilet/Urinal 19 occupants
Mechanical Room 2 occupants
Student Lounge 12 occupants
Dormitory rooms 96 occupants (16 rooms with 6 per room)
Second Floor 131 occupants(max. occupancy)
D201—D221 126 occupants (21 rooms with 6 per room)
D222 5 occupants
Third Floor 131 occupants(max. occupancy)
D301—D321 126 occupants (21 rooms with 6 per room)
D322 5 occupants
Means of Egress Sizing
Stairways
Means of egress capacity factor of 0.3 inches per occupant
Level Occupant Load (OL) Required Capacity Existing Capacity
(inches)(0.3 x OL) provided
First Floor 153 maximum Not Required (no stair Not provided—direct
egress) egress to exterior
Second Floor 131 maximum 40 inches 46 inches clear
between handrails
Third Floor 131 maximum 40 inches 46 inches clear
between handrails
Other Egress Components
Means of egress capacity factor of 0.2 inches per occupant
Level Occupant Load (OL) Required Capacity Existing Capacity
(inches)(0.2 x OL) provided
First Floor 153 maximum 31 inches (36") 60" corridors/min. 36"
Second Floor 131 maximum 27 inches (36") doors
Third Floor 131 maximum 27 inches (36")
1-
4
Number of Exits and Exit Access Doorways
Egress based on occupant load and common path of egress travel distance
Two exits or exit access doorways from any space shall be provided where the design occupant load or the
common path of egress travel distance exceeds the values listed in Table 1006.2.1.
Egress based on occupant load
Each story and occupied roof shall have the minimum number of independent exits, as specified in Table
1006.3.1. A single exit or access to a single exit shall be permitted in accordance with Section 1006.3.2. the
required number of exits or exit access stairways or ramps proving access to exits,from any story or occupied
roof shall be maintained until arrival at the exit discharge or a public way.
• Number of exits required (2)Two per floor
• Number of existing exits provided (2)Two per floor
Accessible Means of Egress
The existing facility maintains an accessible means of egress from the first floor that is continuous to a public
way and that consists of the following in accordance with Section 1009.2:
1. Accessible routes complying with 1104.
2. Interior exit stairways complying with Sections 1009.3 and 1023.
3. Exit access stairways complying with 1009.3.
4. Horizontal exits complying with Section 1026.
5. Areas of refuge complying with Section 1009.6.1-1009.6.4.
Exit Access Travel Distance
Limitations: exit access travel distance shall not exceed the values given in Table 1017.2.
Table 1017.2
Exit Access Travel Distance
Occupancy w/o Sprinkler System w/Sprinkler System
(feet) (feet)
A, E, F-1, M, R, S-1 200 250
Maximum exit access travel distance allowed for R-2 occupancy: 250 feet
Maximum existing exit access travel distance: 163 feet
Travel distance measured from the D101 Ritual Bath Door 105 to D152 Stair Door 117.
5
Evaluation Conclusion
In reviewing the Record Documents provided for the existing dormitory wing of 1 Veterans Way, it is my
interpretation that:
• The allowable occupant load for each dormitory room shall be a maximum of(6)occupants per
dormitory room with a maximum of five(5)single beds,or up to six(6) beds utilizing double-deck
bunk beds per room.
Exceptions to the maximum of(6) occupants based on room area and intended use(i.e.wheelchair bound
occupants)for dormitory rooms D222 and D223 and the three first floor accessible units have been noted in
the "Occupant Loads" portion of the evaluation report. Diagrams for both the typical dormitory room and
the ADA dormitory room have been provided.
It should be noted that this evaluation was for the intended purpose of determining the allowable occupancy
of each dormitory room and confirming that the existing means of egress system; exit, exit access, and exit
discharge are adequate to necessitate the proposed maximum occupancy.
As no work is being performed, no alterations are being made, and no changes are being proposed to the
existing means of egress,the functionality, placement, and condition of: exit signs, handrails,guards,
emergency egress lighting placement and illumination levels, panic and door hardware,elevator power
supply and signaling devices,two-way communication systems, and any similarly required means of egress
systems were not included as part of this review. It is assumed that these systems have been maintained by
the owner and have been periodically inspected by the fire marshal.
Please accept this evaluation as a means of updating the stated conditions noted on the Certificate of
Occupancy dated 6/18/19 from "maximum 75 persons per floor" and "maximum 4 beds per room"to:
• Dormitory Occupancy First Floor:
o Maximum one-hundred fifty-three(153) persons and a maximum of five (5) single beds, or
up to six(6) beds utilizing double-deck bunk beds per room and three (3)single beds,or up
to six(6) beds utilizing double-deck bunk beds per ADA room occupied by a wheelchair.
• Dormitory Occupancy Second and Third Floors:
o Maximum one-hundred thirty-one (131) persons per floor and a maximum of five (5)single
beds, or up to six(6) beds utilizing double-deck bunk beds per room.
Please contact me directly with any questions or comments.
Kind regards,
Timothy A. Wade,Architect
6
13'-0"TO 13'-4 3/4"
• • •
\\
o //
rn / \
o
• 1 u1
•
39"x 80"
7::) TWIN BED, 10
�' TY P. iD
•
"n s _
\\ 77JN
• / \
I
1
m \
/
• 7
-----
N
i--1
O
.--1
n
• • •
8'-4" 4'_8"
DORMITORY DIAGRAM SCALE: 1/4"= 1'-0"
13'-0"TO 13'-4 3/4"
1
1
• • •
0
N
• 39"x 80"
?n TWIN BED, 09
TY) TY P. iD
•
7'
TY) o
N
•M
M
• 00 N
N
M
M
•
•—
`''..)
M
•
O
CO
N
iD
• • •
8'-0" VARIES
DORMITORY DIAGRAM SCALE: 1/4"= 1'-0"