Loading...
HomeMy WebLinkAbout20211077 74 Mitchell Street Engineering Report The LA GROUP Landscape Architecture&Engineering RC- Peopte.Purpose.Place. 40 Long Alley Saratoga Springs NY 12866 p 518-587-8100 f 518-587-0180 Engineering Report www.thelagroup.com Water and Sanitary Sewer For 74 & 74A MITCHELL STREET 74 Mitchell Street SARATOGA SPRINGS, NEW YORK Planning Board #21.XXX Prepared For: Hanley Development 12 Amelia Drive Nantucket, MA 02554 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 *cees 19VP1- FQ 09133 (e: v R°FessIoN ' October 25, 2021 L Project Description The 74 Mitchel Street project consists of the construction of a new recreational swimming pool and cabana area to be used by the residents of the Mitchell Street subdivision. The subdivision contains (7) 4-bedroom homes. Bathrooms and sinks will be provided in the cabana. The property is bound to the north by Mitchell Street, the south by Snyder Lane, the West by 70 Mitchell Street, and the east by 76 Mitchell Street. II. Existing Water and Sanitary Sewer Utilities There is an existing house and garage located at 74 Mitchell Street which is planned to be demolished as a part of the site work. Municipal water service is available from the City of Saratoga Springs. A 6-inch diameter water main is located along Mitchell Street. No water main is located along Snyder Lane. Municipal sanitary sewer service is also available from the City of Saratoga Springs. An 8-inch diameter sanitary sewer main runs along Mitchell Street. No sanitary sewer mains run along Snyder Lane. This sanitary line eventually connects to the Saratoga County Sewer District No. 1 (SCSD), where it ultimately is directed for conveyance and treatment at the SCSD wastewater treatment plant in Mechanicville. III. Projected Water and Wastewater Flows The table below provides information on the anticipated wastewater flow rates for the project: Description Use Rate No. of Total Use Swimmers/residence (7) 4-bedroom residences 10 gpd/Swimmer' 4 280 gpd Total 280 gpd Average daily flow for wastewater is estimated to be 0.58 gallons per minute (gpm)based on a 8 hour day. Estimated peak hourly flow is 2.45 gpm (4.2 x average). Average daily demand for water is estimated to be approximately equal to the wastewater flow or 0.58 gpm. IV. Proposed Water and Wastewater Utilities Proposed Water Utilities To service the project, a 3/4" copper water service is proposed to connect from the south side of the cabana to 6" water main in Mitchell Street. Connections and appurtenances, including corporation stops, trenching, bedding, service connections, as well as testing and disinfection will all be specified in accordance with City of Saratoga Springs and NYSDOH standards. Proposed Wastewater Utilities For sanitary sewer collection, a 6" PVC sewer lateral connection from the north side of the cabana to the 8" municipal sewer service in Mitchell Street is proposed. The lateral will be installed at a minimum 2.0% slope per City of Saratoga Springs requirements to ensure adequate pipe cleansing. Notes 1. From Table B3,New York State Design Standards for Intermediate Sized Wastewater Treatment Systems 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q=(18+P 1/2)±(4 +P'/z)where P=population in thousands 3. From Tables XIV Community Water Systems Source Book,Ameen (3.0 gpm/residence)