HomeMy WebLinkAbout20210603 Saxton Subdivision EAF Agency Use Only [If applicable]
Project: PB#20210603 Saxton Subdivision
Date: September 9,2021
Short Environmental Assessment Form
Part 2 -Impact Assessment
Part 2 is to be completed by the Lead Agency.
Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by
the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by
the concept"Have my responses been reasonable considering the scale and context of the proposed action?"
No,or Moderate
small to large
imp act imp act
may may
occur occur
1. Will the proposed action create a material conflict with an adopted land use plan or zoning
regulations? Z
El
2. Will the proposed action result in a change in the use or intensity of use of land? R.1
El
3. Will the proposed action impair the character or quality of the existing community?
Z
El
4. Will the proposed action have an impact on the environmental characteristics that caused the
El
establishment of a Critical Environmental Area(CEA)? Z
5. Will the proposed action result in an adverse change in the existing level of traffic or
affect existinginfrastructure for mass transit,bikingor walkway? Z Y
6. Will the proposed action cause an increase in the use of energy and it fails to incorporate
reasonably El
available energyconservation or renewable energyopportunities?
Z
pp
7. Will the proposed action impact existing: R.1 El
a.public/private water supplies?
b.public/private wastewater treatment utilities? LII✓
El
8. Will the proposed action impair the character or quality of important historic,archaeological,
Z
El
architectural or aesthetic resources?
9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands,
waterbodies,groundwater, air quality,flora and fauna)? Z q Y )
10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage
Z El
problems?
11. Will the proposed action create a hazard to environmental resources or human health? LII✓ El
PRINT FORM Page 1 of 2
SEAF 2019
Agency Use Only[If applicable]
Project: PB# 20210603 Saxton
Date: 09/09/21
Short Environmental Assessment Form
Part 3 Determination of Significance
For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a
particular element of the proposed action may or will not result in a significant adverse environmental impact,please
complete Part 3. Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that
have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency
determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting,
probability of occurring,duration,irreversibility,geographic scope and magnitude. Also consider the potential for short-
term,long-term and cumulative impacts.
flCheck this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action may result in one or more potentially large or significant adverse impacts and an
environmental impact statement is required.
flCheck this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action will not result in any significant adverse environmental impacts.
City of Saratoga Springs Planning Board September 9, 2021
Name of Lead Agency Date
Mark Torpey Chair
Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer
Signature of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer)
PRINT FORM Page 2 of 2