HomeMy WebLinkAbout20210243 19 Washington Street Site Plan cost estimate Cost Estimate for Letter of Credit Pe#zto2a3 ProjectNo: 2020049 Project: 19 Washington Location: 19 Washington Street Saratoga Springs,New York Date: 3/18/2021 ON-SITE WORK Item Quanti Unit UnitCost Subtotal Site Pre aration and Gradin Erosion Control(including silt fence&construction access) 1 LS $3,000.00 $3,000.00 Demolition 1 LS $15,000.00 $15,000.00 Hardscape Granite Curb 103 LF $50.00 $5,150.00 Concrete Pavement 2,500 SF $5.50 $13,750.00 Heated Concrete Pavement 3,019 SF $8.00 $24,152.00 Pavers 2,232 SF $7.00 $15,624.00 Site Amenities Landscaping 1 LS $5,000.00 $5,000.00 Bench 7 EA $400.00 $2,800.00 Traffic Signage 2 EA $350.00 $700.00 Retaining Wall 171 LF $150.00 $25,650.00 Fence 37 LF $45.00 $1,665.00 Concrete Curb 100 LF $40.00 $4,000.00 Utilities 6"PVC Sanitary line 14 LF $55.00 $770.00 8"HDPE 106 LF $40.00 $4,240.00 12"HDPE 29 LF $47.00 $1,363.00 6"DIP Waterline 14 LF $90.00 $1,260.00 Yard Drain 3 EA $1,750.00 $5,250.00 Hydrodynamic Separator 1 EA $15,000.00 $15,000.00 Trench Drain 1 LS $3,000.00 $3,000.00 On-Site Total $147,374.00 On-Site Total X.25 $36,843.50 OFF-SITE WORK Utilities Traffic Control 1 LS $15,000.00 $15,000.00 6"PVC Sanitary line 21 LF $55.00 $1,155.00 Catch Basin 1 EA $3,750.00 $3,750.00 Stormwater Manhole 5 EA $3,250.00 $16,250.00 12"HDPE 38 LF $65.00 $2,470.00 18"HDPE 528 LF $75.00 $39,600.00 6"DIP Waterline 29 LF $90.00 $2,610.00 Water Service Curb Box 1 EA $750.00 $750.00 Sanitary Connection 1 LS $1,500.00 $1,500.00 10"Water Main Connection 1 EA $4,500.00 $4,500.00 10"x6"Tee/Valve 1 EA $2,800.00 $2,800.00 Hardsca e Concrete Sidewalk 514 SF $5.50 $2,827.00 Heated Concrete Sidewalk 5395 SF $8.00 $43,160.00 Granite Curb 430 LF $50.00 $21,500.00 Asphalt Pavement 7,464 SF $525 $39,186.00 Striping 1 LS $1,000.00 $1,000.00 Amenities Topsoil and Seed 1 LS $600.00 $600.00 Deciduous Trees 7 EA $700.00 $4,900.00 Decorative Street Light 6 EA $2,000.00 $12,000.00 Bench 5 EA $400.00 $2,000.00 Bike Rack 2 EA $500.00 $1,000.00 Trash Receptical 1 EA $500.00 $500.00 Traffic Signage 4 EA $350.00 $1,400.00 Saratoga Springs Signage Kiosk 1 EA $12,500.00 $12,500.00 As Built Drawings 1 LS $2,500.00 $2,500.00 Off-Site Total $235,458.00 Total Site Work 382 832.00 Letter of Credit Amounts Total off-site work $235,458.00 Total on-site work x 25 $36,843.50 Su6total $272,301.50 Market Volatility due to COVID-19 Pandemic 20%increase $54,460.30 Total $326,761.80 L.O.C.amount $330,000.00