Loading...
HomeMy WebLinkAbout20210243 19 Washington Street Site Plan Narrative � The L�, GROUP La�rdscape Architecture�Enqineering P.0 fr��o��/c.N«��rr.!Iru:e. =��1 I.UIl�f�l�C'y 5aratog� Springs NY 12866 p:518-587-8100 � 518-581-0180 www.thelag roi_i�-com 19 Washington Street Development Construction Staging Narrative The project anticipates utilizing the property for the majority of material staging throughout the building construction phases. Some materials may be stored on a property at 25 Station Lane if the material storage is not sufficient on site. Contractors for the project will utilize nearby properties with the same owner for parking during the majority of construction. Contractor parking may utilize the 25 Station Lane property for parking as well if space becomes an issue. G:�Proj-2020\2020049_Rip_Van_Dam\2020049Admin\O1Con�espondence\2.2Letters\Staging NAn�ative 2021-09-14.docx G.\Proj-2020\2020049_Rip_Van_Dam\2020049Admin\01Correspondence\22Letters\2021 01-22 Roth-dmkrev1.docx